{"title":"Formwork designing in BIM technology","authors":"M. Szóstak, Mateusz Napiórkowski","doi":"10.5604/01.3001.0016.2696","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2696","url":null,"abstract":"System formwork is commonly used on constructionsites. The article discusses the aspect of designing, selectionand modeling formwork. As part of the conducted analyses,authors present a review of plugins available on the marketfor formwork modeling from selected formwork manufacturers.Using the PERI Library+ plug-in for Autodesk Revit, authors modeledan example of wall and floor formwork project. In addition,an analysis of the usefulness of modeling was carried out,which allowed to indicate the benefits of BIM in aspect of systemformwork","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131945502","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Analysis of the use of shipping containers in housing construction in the contextof the circular economy. Part I","authors":"Martyna Skorupa, A. Sobotka","doi":"10.5604/01.3001.0016.2699","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2699","url":null,"abstract":"The paper presents the issue of the use of waste in theconstruction industry using the example of transportation conteners.It is at the heart of reverse logistics and the circular economy.The analysis and evaluation of the use of shipping containersfor the construction of buildings was made on the exampleof the authors design of a single-family house from shipping containersin comparison with a building with traditional technology.The results of Ecopoint index calculations, for both technologies,were presented, indicating the impact of material solutionson the environment. The evaluation of technologies was carriedout using multi-criteria analysis, and a SWOT matrix. Accordingto WT2021, container technology can be successfully applied. However,the decision depends on the needs of the investor withthe predominance of the desirability of using container technologyfor public and commercial buildings","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"60 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122580143","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
J. Kowalski, M. Lendo-Siwicka, G. Wrzesiński, K. Pawluk
{"title":"Risk analysis of the cost of the construction project in the aspect of changing theregulations governing the scope of project documentation","authors":"J. Kowalski, M. Lendo-Siwicka, G. Wrzesiński, K. Pawluk","doi":"10.5604/01.3001.0016.2686","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2686","url":null,"abstract":"In Poland, the dynamics of undertaken and plannedinvestments related to the implementation of underground sewerlines has significantly increased in recent years. Many of theseinvestments are implemented with the help of EU funding. Itis worth ensuring that these resources are used as efficiently aspossible. One of the important steps in achieving this goal is theproper preparation of these investments. An important elementis therefore a detailed analysis of contract documents and changesthat occur in the context of the amendment of basic legalacts, such as the amendment to the Construction Law Act andthe Regulation of the Minister of Development on the detailedscope and form of the construction project. The article presentsan analysis of threats that may occur during the planning andimplementation of public contracts projects","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"97 1-2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116609022","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
D. Skorupka, Dominika Dudziak - Gajowiak, A. Duchaczek, Agnieszka Bekisz
{"title":"Risk management in construction projects-legal and scientific terms","authors":"D. Skorupka, Dominika Dudziak - Gajowiak, A. Duchaczek, Agnieszka Bekisz","doi":"10.5604/01.3001.0016.2685","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2685","url":null,"abstract":"The article raises the variability of the conditions forthe implementation of the construction project. Due to the factthat changing the conditions is something natural and permanent,it is worth considering its forecast. At the same time, we areinterested not so much by the forecast itself but the negative effectsof changes. To prevent them, they should be predicted andbe prepared to minimize them and even complete neutralization.And this is what the procedures methods presented by the authorsof the article is for. In their analyses, the authors based theiranalyzes on the legal grounds presented in the standard andthe Act, as well as on their own research, which resulted in thedevelopment of a proprietary risk analysis method","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126436252","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Technical problems in the renovation of the roof truss of the 16th century church","authors":"B. Nowogońska","doi":"10.5604/01.3001.0016.2717","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2717","url":null,"abstract":"The main causes of damage to wooden structures inheritage buildings are the influence of atmospheric factors andthe ageing processes associated with them. In the case of the rooftruss of the 16th century church in Lubowo, the technical conditionis additionally affected by leaking roofing, damaged gutters,downpipes and flashings. Some of the elements of the woodenstructure have suffered biological corrosion, causing themto lose their strength values. The roof truss of the 16th centurychurch in Lubowo dates from the construction period of the building.Due to the historic value of the truss structure, the renovationwork refrains from interventions that would change itsform, shape and type. The renovation of the rafter framing is basedon the assumption of preserving the original structural solutions,locations of elements, cross-sections","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116543746","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"The use of laser scanning and point clouds on the construction site. Part III","authors":"P. Nowak, J. Rosłon, Karol Romatowski","doi":"10.5604/01.3001.0016.2698","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2698","url":null,"abstract":"The third in a series of four articles [15, 16] presents theuse of laser scanning and work with a point cloud on a constructionsite. The preparation for scanning and the scanning processare presented from scanner preparation through various processessuch as field measurements, data registration and export.The authors also presented a number of problems that the scannermay encounter and practical ways of solving them. It alsoshows the possibilities of using a scanner and a cloud of pointsfor take-off and taking measurements based on a real project for the demolition works of the ventilation room, the renovatedhospital. The authors also present the assumptions and preliminaryresults of the ID4EX project related to the use of immersivedesign in construction","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"145 ","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"113991174","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Implementation of building contracts in the project management system case study. Part I","authors":"M. Rogalska, Z. Hejducki","doi":"10.5604/01.3001.0016.2712","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2712","url":null,"abstract":"The article presents an example of the functioning ofa team of Project Managers at various levels of construction projectmanagement. A detailed procedure for the implementationof the project at the lowest level of the PM structure, in a companyspecialized in roofing works, in particular flat roofs with largesurfaces, was presented. The article contains the authors experiencesand observations from engineering activities in the conductof construction contracts as a Project Manager (PM).","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114227237","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Comparative analysis of selected technologies for building residential buildingsin the social context","authors":"A. Radziejowska","doi":"10.5604/01.3001.0016.2704","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2704","url":null,"abstract":"The article undertakes a comparison of residential buildingsbuilt with the two most common technologies in Poland.The comparison was made in view of the social aspect, one of thethree main aspects of sustainable construction. For the comparison,the authors method of social assessment was used, which allowsto determine the social quality index and the values of partialassessments in the assessed categories and subcategories. Ithas been shown that such an assessment will allow the propertymanager to identify the most important and priority measuresleading to the improvement of the social quality of the facilitiesand, consequently, the satisfaction of residents","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"19 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127767848","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Analysis of the impact of work intensification methods on the durationof construction processes","authors":"Łukasz Rzepecki","doi":"10.5604/01.3001.0016.2708","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2708","url":null,"abstract":"The paper considers the problem of selecting methodsof work acceleration, taking into account their costs andeffects in terms of reducing the duration of construction processes.These methods include: working overtime, working onweekends, working in two shifts and employing more efficientwork brigades. A mathematical model was developed for repetitiveconstruction processes, ensuring minimization of interruptionsin the crews work and reduction of the time of the entireproject. In order to verify the correctness of the model, thedeveloped approach was used to determine organizational variants(activities that reduce process completion time) for a sampleconstruction project.","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"26 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114520918","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Identification of construction defects in residential buildings","authors":"Karol Pochybełko, B. Hoła","doi":"10.5604/01.3001.0016.2716","DOIUrl":"https://doi.org/10.5604/01.3001.0016.2716","url":null,"abstract":"The formation of construction defects is a problem thatoccurs in every investment process. The aim of the research presentedin the article is to identify defects in residential buildingshanded over for use and to assess their degree of significance.To assess the significance of defects, the Pareto-Lorenz analysisand the called ABC classification. Based on the research, it wasfound that the defects identified in the following building elementsare significant for the quality of the building: plasters, windows,floors, electrical installations, common parts, plumbing,improper cleaning of elements, doors and glass","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"12 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121786833","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}