Risk analysis of the cost of the construction project in the aspect of changing theregulations governing the scope of project documentation

J. Kowalski, M. Lendo-Siwicka, G. Wrzesiński, K. Pawluk
{"title":"Risk analysis of the cost of the construction project in the aspect of changing theregulations governing the scope of project documentation","authors":"J. Kowalski, M. Lendo-Siwicka, G. Wrzesiński, K. Pawluk","doi":"10.5604/01.3001.0016.2686","DOIUrl":null,"url":null,"abstract":"In Poland, the dynamics of undertaken and plannedinvestments related to the implementation of underground sewerlines has significantly increased in recent years. Many of theseinvestments are implemented with the help of EU funding. Itis worth ensuring that these resources are used as efficiently aspossible. One of the important steps in achieving this goal is theproper preparation of these investments. An important elementis therefore a detailed analysis of contract documents and changesthat occur in the context of the amendment of basic legalacts, such as the amendment to the Construction Law Act andthe Regulation of the Minister of Development on the detailedscope and form of the construction project. The article presentsan analysis of threats that may occur during the planning andimplementation of public contracts projects","PeriodicalId":175990,"journal":{"name":"Przegląd Budowlany","volume":"97 1-2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Przegląd Budowlany","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/01.3001.0016.2686","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In Poland, the dynamics of undertaken and plannedinvestments related to the implementation of underground sewerlines has significantly increased in recent years. Many of theseinvestments are implemented with the help of EU funding. Itis worth ensuring that these resources are used as efficiently aspossible. One of the important steps in achieving this goal is theproper preparation of these investments. An important elementis therefore a detailed analysis of contract documents and changesthat occur in the context of the amendment of basic legalacts, such as the amendment to the Construction Law Act andthe Regulation of the Minister of Development on the detailedscope and form of the construction project. The article presentsan analysis of threats that may occur during the planning andimplementation of public contracts projects
从变更管理工程文件范围的规章制度的角度对工程造价进行风险分析
在波兰,近年来,与实施地下污水管道有关的已承诺和计划投资的动态显著增加。其中许多投资都是在欧盟资金的帮助下实施的。确保这些资源得到尽可能有效的利用是值得的。实现这一目标的重要步骤之一是适当地准备这些投资。因此,一个重要的因素是对合同文件的详细分析,以及在修改基本法律的背景下发生的变化,例如修改《建设法法》和发展部长关于建设项目的详细范围和形式的规定。本文分析了公共合同项目在规划和实施过程中可能出现的威胁
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信