JURNAL JALASENA最新文献

筛选
英文 中文
EFISIENSI PROYEK PEMBANGUNAN BLOK QCS DENGAN INTEGRASI METODE CPM DAN EVA (STUDI KASUS PT. KARIMUN SEMBAWANG SHIPYARD) CPM方法整合QCS构建项目的效率(PT. KARIMUN sem洋葱SHIPYARD案例研究)
JURNAL JALASENA Pub Date : 2021-08-31 DOI: 10.51742/jalasena.v3i1.432
Muhammad Heldyan Ilham, Intan Baroroh
{"title":"EFISIENSI PROYEK PEMBANGUNAN BLOK QCS DENGAN INTEGRASI METODE CPM DAN EVA (STUDI KASUS PT. KARIMUN SEMBAWANG SHIPYARD)","authors":"Muhammad Heldyan Ilham, Intan Baroroh","doi":"10.51742/jalasena.v3i1.432","DOIUrl":"https://doi.org/10.51742/jalasena.v3i1.432","url":null,"abstract":"New shipbuilding projects are required to work quickly according to schedule. For this reason, it is necessary to have a planning and scheduling for shipbuilding so that it is received by the shipowner on time. It is inevitable that in every implementation practice there are various possibilities that can cause delays, such as delays in implementation, design changes, weather effects, delays in material supply, construction failures, and planning errors. This study aims to analyze the scheduling of ship x project and analyze the causes of delays in QCS block project at the PT. Karimun Sembawang Shipyard. Scheduling is made using the Critical Path Method (CPM) and Network Planning will describe the entire list of activities needed to complete the project, the time or duration required for each activity. From the results of the analysis, it was found that the 29-day C scheduling model with a shorter duration. Earned Value Analysis (EVA) helps estimate the cost of a project, the planning process of all activities that must be completed in the project will be easier. The results of the analysis in scheduling C, JO costs are Rp. 10,717,500, material is Rp. 622,012,162, and Overhead is Rp. 189,820,698 with a decrease in costs of 0.088%. \u0000Pada proyek pembangunan kapal baru dituntut untuk bekerja cepat sesuai dengan jadwal Untuk itu, perlu adanya suatu perencanaan dan penjadwalan untuk pembangunan kapal supaya diterima dengan pemilik kapal tepat waktu. Tak bisa terelakkan bahwa pada setiap praktik pelaksanaan terdapat berbagai kemungkinan yang dapat menyebabkan keterlambatan, misalnya keterlambatan pelaksanaan, perubahan desain, pengaruh cuaca, keterlambatan suplai material, kegagalan konstruksi, dan kesalahan perencanaan. Penelitian ini bertujuan untuk menganalisa penjadwalan proyek kapal x dan menganalisa penyebab keterlambatan proyek blok QCS pada galangan PT.Karimun Sembawang Shipyard. Dibuatkan penjadwalan menggunakan Critical Path Method (CPM) dan Network Planning akan dijabarkan seluruh daftar kegiatan yang diperlukan untuk menyelesaikan proyek, waktu atau durasi yang dibutuhkan dari setiap kegiatan. Dari hasil analisa didapatkan model penjadwalan C 29 hari dengan durasi lebih cepat. Earned Value Analysis (EVA) membantu memperkirakan biaya dari sebuah proyek proses perencanaan seluruh kegiatan yang harus diselesaikan dalam proyek akan lebih mudah. Didapatkan hasil analisa dipenjadwalan C biaya JO sebesar Rp 10.717.500, material Rp 622.012.162, dan Overhead Rp 189.820.698 dengan biaya yang turun sebesar 0,088%","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123579683","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PENGARUH KINERJA PELAYANAN JASA KEAGENAN TERHADAP KEPUASAN PELANGGAN DI PT. CITRA ABADI LINE 可持续服务服务的表现对PT. CITRA LINE的客户满意度的影响
JURNAL JALASENA Pub Date : 2021-08-31 DOI: 10.51742/jalasena.v3i1.549
Fajar Tyas Adi, Diky Budiman, Mey Krisselni Sitompul, Niaa Nuvita Aryanti
{"title":"PENGARUH KINERJA PELAYANAN JASA KEAGENAN TERHADAP KEPUASAN PELANGGAN DI PT. CITRA ABADI LINE","authors":"Fajar Tyas Adi, Diky Budiman, Mey Krisselni Sitompul, Niaa Nuvita Aryanti","doi":"10.51742/jalasena.v3i1.549","DOIUrl":"https://doi.org/10.51742/jalasena.v3i1.549","url":null,"abstract":"Penelitian ini bertujuan untuk menganalisis Pengaruh Kinerja Pelayanan Jasa Keagenan terhadap kepuasan pelanggan di PT. Citra Abadi Line. Penelitian ini menggunakan pendekatan deskriptif dengan jenis penelitian kuantitatif. Data penelitian diperoleh melalui instrument berupa angket tertutup atau kusioner. Instrumen ini digunakan untuk mengumpulkan data melalui dua variabel dengan 20 item pertanyaan yang dilakukakan pada 50 responden. Berdasarkan hasil analisis regresi linier sederhana yang telah dilakukakan, dapat diketahui nilai koefisien regresi variabel Kinerja Pelayanan (X) sebesar 0,812 bertanda positif dengan nilai sig. <0,001 lebih kecil dari α 0,05 (dengan tingkat kepercayaan 95%). Hal ini menunjukkan bahwa Kinerja Pelayanan berpengaruh positif dan signifikan terhadap Kepuasan Pelanggan pada PT. Citra Abadi Line. Berdasarkan hasil dari Uji t, Hipotesis terjawab bahwa Ha diterima dan menunjukkan bahwa Kinerja Pelayanan berpengaruh signifikan terhadap Kepuasan Pelanggan pada PT. Citra Abadi Line diperoleh nilai t-hitung sebesar (9,653) > t-tabel (2,01) dengan nilai signifikan <0,001< 0,05. Dimana Kinerja Pelayanan tidak berbeda nyata terhadap Kepuasan Pelanggan pada PT. Citra Abadi Line.","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"99 16","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"113940505","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
DESAIN DAN PERHITUNGAN BODY KAPAL ATAU HULL STRUCTURE PEMBERSIH SAMPAH DI PANTAI 船舶设计和计算结构或船体结构清理海滩上的垃圾
JURNAL JALASENA Pub Date : 2021-02-02 DOI: 10.51742/jalasena.v2i2.196
Padlan Padlan, Trisno Susilo
{"title":"DESAIN DAN PERHITUNGAN BODY KAPAL ATAU HULL STRUCTURE PEMBERSIH SAMPAH DI PANTAI","authors":"Padlan Padlan, Trisno Susilo","doi":"10.51742/jalasena.v2i2.196","DOIUrl":"https://doi.org/10.51742/jalasena.v2i2.196","url":null,"abstract":"This garbage cleaning ship is a new building design that functions as a garbage cleaning beach with a size of a ship length of 12, 4m wide and 2m high. The design of this garbage cleaning vessel is a solution to help cleaning and transporting waste along the coast in general in accordance with the Karimun district government program. \u0000Based on the results of calculations on the construction design of the garbage cleaning vessel body, the body or hull of the garbage cleaning vessel, weighs 19,766 tons and is designed to lift ± 20 tons of wet garbage. This garbage cleaning vessel has a height of 0.401 m empty ship and is loaded with a load of 0.800 m. For the design of the thickness of the plate on the Deck Plate, Shell Plate and bottom plate from the calculation found the thickness of the plate 8 mm and for the transverse stability value of the ship the value of KM 2.86 m, KG 1 m, KB 0.2 m while the stability value extends the ship KM value 24 m, KG 1 m, KB 0.2 m.","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"69 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128358061","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
STUDI PENILAIAN EKONOMIS PERENCANAAN SISTEM INSTALASI BIOGAS PADA KAPAL KARGO (KM.SINAR BUGIS) DENGAN METODE (COST & BENEFIT ANALYSIS) 经济评估规划系统在货船上的沼气安装(公里)。方法(COST & BENEFIT分析)
JURNAL JALASENA Pub Date : 2021-02-02 DOI: 10.51742/jalasena.v2i2.290
Samsudin
{"title":"STUDI PENILAIAN EKONOMIS PERENCANAAN SISTEM INSTALASI BIOGAS PADA KAPAL KARGO (KM.SINAR BUGIS) DENGAN METODE (COST & BENEFIT ANALYSIS)","authors":"Samsudin","doi":"10.51742/jalasena.v2i2.290","DOIUrl":"https://doi.org/10.51742/jalasena.v2i2.290","url":null,"abstract":"The biogas installation system is planned to be installed on the Kago KM ship. Sinar Bugis in terms of advantages and disadvantages in a system of cost and benefit systems. This system is planned to contribute energy supply for electricity utilization on ships and for gas cooking. The biogas installation planning scheme is made by considering the variable number of passengers and the fermentation period to be carried out. With the ability to produce gas in the range of 13 m3 per day, with the conversion of electric energy of 5.4 Kwh / m3, with 1900 passengers it is estimated that they can generate new energy of 65.3 Kwh and be able to provide cooking energy for 87 people. Meanwhile, the cost identification shows that the procurement cost is IDR 4,000,000. Start-up cost is IDR 98,750,000 and the ongoing cost is IDR 83,000,000. The total benefit value assuming the current energy price variable is IDR 162,998,620.- so that the cost and benefit identification value is obtained a BCR value of 3.17","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123085228","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
STRATEGI PENGUATAN GALANGAN KAPAL NASIONAL DALAM RANGKA MEMPERKUAT EFEKTIFITAS DAN EFISIENSI ARMADA PELAYARAN DOMESTIK 加强国家造船厂战略,以加强国内船舶的效率和效率
JURNAL JALASENA Pub Date : 2021-02-02 DOI: 10.51742/jalasena.v2i2.291
Bayu satrio
{"title":"STRATEGI PENGUATAN GALANGAN KAPAL NASIONAL DALAM RANGKA MEMPERKUAT EFEKTIFITAS DAN EFISIENSI ARMADA PELAYARAN DOMESTIK","authors":"Bayu satrio","doi":"10.51742/jalasena.v2i2.291","DOIUrl":"https://doi.org/10.51742/jalasena.v2i2.291","url":null,"abstract":"The development of the national maritime industry as a solution for the Indonesian government's program to increase the capability in national shipping, both in the transportation of goods and passengers between islands. For initial data as a guideline for increasing the shipyard's ability to produce new shipbuilding including repair / docking, it is necessary to have an inventory of current shipyard conditions and operational capabilities in building and repairing ships according to the existing schedule. shipyards and production infrastructure in use today, a large investment is still needed, including the addition of professional and integrated human resources. As we all know, shipyard is a capital-intensive and labor-intensive industry, especially in Indonesia. From the Resume, evaluation of secondary data shows that the contribution of shipyard operations is more oriented to ship repair / repair (docking), because material needs are more localized. In addition, the risk of loss and working time can be minimized from the need for more locally loaded materials","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"174 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124286226","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
ANALISIS FINANSIAL JANGKA PENDEK USAHA KAPAL IKAN DI KABUPATEN KARIMUN
JURNAL JALASENA Pub Date : 2021-02-02 DOI: 10.51742/jalasena.v2i2.289
Muhammad hadi
{"title":"ANALISIS FINANSIAL JANGKA PENDEK USAHA KAPAL IKAN DI KABUPATEN KARIMUN","authors":"Muhammad hadi","doi":"10.51742/jalasena.v2i2.289","DOIUrl":"https://doi.org/10.51742/jalasena.v2i2.289","url":null,"abstract":"Fishing by fishermen in the process is assisted by fishing tools. this tool is a fishing boat. Hereditary fishing boats have been made for use by fishermen to get fish, the increase in demand for fishing boat production will increase along with the growth of coastal communities. Karimun is one of the areas where the majority of the population works as fishermen, with this potential supporting the birth of local fishing boat producers. Local fishing boat producers are able to compete with good quality, with this potential this research was conducted to analyze the feasibility of fishing boat business in Pasuruan district with a short-term analysis which resulted in R / C value and profitability of fishing boat business in Karimun respectively 1.686 and 168.55% per year. The results obtained are more than the eligibility limit, so the wooden boatyard business in Karimun meets the feasibility value index to continue and develop the business.","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128519190","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PASSENGER TRANSPORTATION SEA TRANSPORTATION SERVICES IN PANDEMY 大流行期间的客运、海运服务
JURNAL JALASENA Pub Date : 2021-02-02 DOI: 10.51742/jalasena.v2i2.286
Ahmad, Agus Setiawan, Edikurniawan
{"title":"PASSENGER TRANSPORTATION SEA TRANSPORTATION SERVICES IN PANDEMY","authors":"Ahmad, Agus Setiawan, Edikurniawan","doi":"10.51742/jalasena.v2i2.286","DOIUrl":"https://doi.org/10.51742/jalasena.v2i2.286","url":null,"abstract":"The Ministry of Transportation (Kemenhub) issued a Minister of Transportation Regulation Number 18 of 2020 concerning Transportation Control in the context of Preventing the Spread of Covid-19. broadly regulates three things, namely: transportation control for the entire region, transportation control in areas designated as Large-Scale Social Restrictions (PSBB), and transportation control for homecoming activities in 2020. Includes public and private vehicle passengers, operators of transportation facilities and infrastructure both in land, rail, sea and air transportation. \u0000               The method used in this research is literature study, which is all the efforts made by the researcher to gather information that is relevant to the topic or problem to be or is being researched. This information can be obtained from scientific books, research reports, scientific essays, theses and dissertations, regulations, statutes, yearbooks, encyclopedias, and other written and electronic sources.               The following conclusions are as follows: The condition of the available facilities now, Sea Transportation Passenger Transport Services during the Pandemic, both dock infrastructure and stacking fields, need to develop port infrastructure and health protocols to anticipate additional passenger flows. Another effort that has been made is by implementing social distancing and work from home (WFH) recommendations for related parties in the Indonesian maritime world.            Keywords: Service, sea transportation, pandemic","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"135 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121365253","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
PENGELASAN DISIMILAR MATERIAL (DUPLEX STAINLESS STEEL) 2205 DAN (HIGH STRENGTH STEEL) GRADE VL D36 UNTUK KAPAL OIL TANKER 蓬拉三异种材料(双相不锈钢)2205丹(高强度钢)等级vl d36 untuk kapal油船
JURNAL JALASENA Pub Date : 2021-02-02 DOI: 10.51742/jalasena.v2i2.287
Maycal Yudistira, Julius
{"title":"PENGELASAN DISIMILAR MATERIAL (DUPLEX STAINLESS STEEL) 2205 DAN (HIGH STRENGTH STEEL) GRADE VL D36 UNTUK KAPAL OIL TANKER","authors":"Maycal Yudistira, Julius","doi":"10.51742/jalasena.v2i2.287","DOIUrl":"https://doi.org/10.51742/jalasena.v2i2.287","url":null,"abstract":"The choice of Duplex Stainless Steel material for oil tanker ship construction is very appropriate because in addition to having good mechanical properties (high tensile and yield strength and toughness) as a ship construction structure, it is also resistant to loads of highly corrosive liquid chemicals. Unlike Mild Steel or Duplex Stainless Steel A, welding and treating Duplex Stainless Steel requires very strict procedures and care must be taken. The choice of welding process, namely a combination of (Flux Cored Arc Welding) and SAW (Submerged Arc Welding) is a welding process that is very suitable for welding ship construction. The welding process is categorized as a semi-automatic and automatic welding process that can increase productivity while speeding up welding work. This paper illustrates the welding of two materials with different specifications, namely Duplex Stainless Steel 2205 plate material and VL D36 plate material, along with practical instructions for welding it up to the things that must be considered regarding the handling procedure. In welding Duplex Stainless Steel 2205 plate material it is very important to keep the heat input in the range of 0.5-2.5 kj / mm.","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"57 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130810173","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISA KEBUTUHAN DAYA LISTRIK DAN BAHAN BAKAR PADA OPERASIONAL MV. MIKO NATALIA KARIMUN DENGAN METODE ANALISA BEBAN 分析MV中电力和燃料的需求。NATALIA KARIMUN的负载分析方法
JURNAL JALASENA Pub Date : 2021-02-02 DOI: 10.51742/jalasena.v2i2.288
Eko Gustiawan
{"title":"ANALISA KEBUTUHAN DAYA LISTRIK DAN BAHAN BAKAR PADA OPERASIONAL MV. MIKO NATALIA KARIMUN DENGAN METODE ANALISA BEBAN","authors":"Eko Gustiawan","doi":"10.51742/jalasena.v2i2.288","DOIUrl":"https://doi.org/10.51742/jalasena.v2i2.288","url":null,"abstract":"MV. Miko Natalia. Karimun is one of the operational vessels owned by PT. Miko Natalia, which in its operational activities requires a lot of materials to meet the ship's electrical power needs. Fuel is one component that might be misused in terms of ship reporting. To reduce suspicion in ship reporting, it is necessary to know the costs incurred by the ship in certain conditions. To find out the amount of the ship's electrical power in each condition, it is necessary to calculate the total power of the ship's equipment using the load analysis method. Based on the calculations that have been done, the MV. Miko Natalia when in a dead condition needs 606.7 kw of power, for sailing conditions it needs 401.21 kw of power, at anchoring conditions it requires 366.95 kw of power and the condition of docking / loading and unloading requires 566.12 kw of power. Meanwhile, the maximum power of the Auxiliary Engine (A / E) that the Miko Natalia Indonesia ship can produce is 450 kw.","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"52 3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124615411","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
RANCANG BANGUN DAN ANALISA ALAT BANTU ERECTION BLOCK KAPAL MENGGUNAKAN THRUST BALL BEARING DI PT. KARIMUN SEMBAWANG SHIPYARD
JURNAL JALASENA Pub Date : 2020-08-03 DOI: 10.51742/jalasena.v2i1.149
Masirawan, Trisno Susilo, Edi kurniawan
{"title":"RANCANG BANGUN DAN ANALISA ALAT BANTU ERECTION BLOCK KAPAL MENGGUNAKAN THRUST BALL BEARING DI PT. KARIMUN SEMBAWANG SHIPYARD","authors":"Masirawan, Trisno Susilo, Edi kurniawan","doi":"10.51742/jalasena.v2i1.149","DOIUrl":"https://doi.org/10.51742/jalasena.v2i1.149","url":null,"abstract":"The high demand for building the vessels and ojfshore structure as jackup, such as platform, and submersible rig causing shipbuilding industry demanded to do some inovivation in order to make the ship building process to be more e'mzctive and e17icient. One of the key przocess on ship building is Block's Erection. This research carried out to include the design and analysis to create a tool fbr block erection which capable to boost the e17‘ectiveness and e17iciency on production of shipbuilding. The angular contact ball bearing is the Tool which created and proven very e,0‘ective to use on the process of erection block ship DRU 3 PT. Karimun Sembawang Shipyard. The research is applying descriftive analytic methode which use to analyse the compressive stress and shear strength and proved capable to receive the maximum load as planned. By using material grade AH 36 with tensile strength up to 285.000 Psi, proven much higher than total load applied to them. The results of the study showed that the Angular contact ball bearing capable to work on big load and also can move in all directions with will boost process the ship production significantly. Shipyard should be consider to develop the thrust ball bearing technology as a tool for block erection process.","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"81 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132212057","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信