CPM方法整合QCS构建项目的效率(PT. KARIMUN sem洋葱SHIPYARD案例研究)

Muhammad Heldyan Ilham, Intan Baroroh
{"title":"CPM方法整合QCS构建项目的效率(PT. KARIMUN sem洋葱SHIPYARD案例研究)","authors":"Muhammad Heldyan Ilham, Intan Baroroh","doi":"10.51742/jalasena.v3i1.432","DOIUrl":null,"url":null,"abstract":"New shipbuilding projects are required to work quickly according to schedule. For this reason, it is necessary to have a planning and scheduling for shipbuilding so that it is received by the shipowner on time. It is inevitable that in every implementation practice there are various possibilities that can cause delays, such as delays in implementation, design changes, weather effects, delays in material supply, construction failures, and planning errors. This study aims to analyze the scheduling of ship x project and analyze the causes of delays in QCS block project at the PT. Karimun Sembawang Shipyard. Scheduling is made using the Critical Path Method (CPM) and Network Planning will describe the entire list of activities needed to complete the project, the time or duration required for each activity. From the results of the analysis, it was found that the 29-day C scheduling model with a shorter duration. Earned Value Analysis (EVA) helps estimate the cost of a project, the planning process of all activities that must be completed in the project will be easier. The results of the analysis in scheduling C, JO costs are Rp. 10,717,500, material is Rp. 622,012,162, and Overhead is Rp. 189,820,698 with a decrease in costs of 0.088%. \nPada proyek pembangunan kapal baru dituntut untuk bekerja cepat sesuai dengan jadwal Untuk itu, perlu adanya suatu perencanaan dan penjadwalan untuk pembangunan kapal supaya diterima dengan pemilik kapal tepat waktu. Tak bisa terelakkan bahwa pada setiap praktik pelaksanaan terdapat berbagai kemungkinan yang dapat menyebabkan keterlambatan, misalnya keterlambatan pelaksanaan, perubahan desain, pengaruh cuaca, keterlambatan suplai material, kegagalan konstruksi, dan kesalahan perencanaan. Penelitian ini bertujuan untuk menganalisa penjadwalan proyek kapal x dan menganalisa penyebab keterlambatan proyek blok QCS pada galangan PT.Karimun Sembawang Shipyard. Dibuatkan penjadwalan menggunakan Critical Path Method (CPM) dan Network Planning akan dijabarkan seluruh daftar kegiatan yang diperlukan untuk menyelesaikan proyek, waktu atau durasi yang dibutuhkan dari setiap kegiatan. Dari hasil analisa didapatkan model penjadwalan C 29 hari dengan durasi lebih cepat. Earned Value Analysis (EVA) membantu memperkirakan biaya dari sebuah proyek proses perencanaan seluruh kegiatan yang harus diselesaikan dalam proyek akan lebih mudah. Didapatkan hasil analisa dipenjadwalan C biaya JO sebesar Rp 10.717.500, material Rp 622.012.162, dan Overhead Rp 189.820.698 dengan biaya yang turun sebesar 0,088%","PeriodicalId":308610,"journal":{"name":"JURNAL JALASENA","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"EFISIENSI PROYEK PEMBANGUNAN BLOK QCS DENGAN INTEGRASI METODE CPM DAN EVA (STUDI KASUS PT. KARIMUN SEMBAWANG SHIPYARD)\",\"authors\":\"Muhammad Heldyan Ilham, Intan Baroroh\",\"doi\":\"10.51742/jalasena.v3i1.432\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"New shipbuilding projects are required to work quickly according to schedule. For this reason, it is necessary to have a planning and scheduling for shipbuilding so that it is received by the shipowner on time. It is inevitable that in every implementation practice there are various possibilities that can cause delays, such as delays in implementation, design changes, weather effects, delays in material supply, construction failures, and planning errors. This study aims to analyze the scheduling of ship x project and analyze the causes of delays in QCS block project at the PT. Karimun Sembawang Shipyard. Scheduling is made using the Critical Path Method (CPM) and Network Planning will describe the entire list of activities needed to complete the project, the time or duration required for each activity. From the results of the analysis, it was found that the 29-day C scheduling model with a shorter duration. Earned Value Analysis (EVA) helps estimate the cost of a project, the planning process of all activities that must be completed in the project will be easier. The results of the analysis in scheduling C, JO costs are Rp. 10,717,500, material is Rp. 622,012,162, and Overhead is Rp. 189,820,698 with a decrease in costs of 0.088%. \\nPada proyek pembangunan kapal baru dituntut untuk bekerja cepat sesuai dengan jadwal Untuk itu, perlu adanya suatu perencanaan dan penjadwalan untuk pembangunan kapal supaya diterima dengan pemilik kapal tepat waktu. Tak bisa terelakkan bahwa pada setiap praktik pelaksanaan terdapat berbagai kemungkinan yang dapat menyebabkan keterlambatan, misalnya keterlambatan pelaksanaan, perubahan desain, pengaruh cuaca, keterlambatan suplai material, kegagalan konstruksi, dan kesalahan perencanaan. Penelitian ini bertujuan untuk menganalisa penjadwalan proyek kapal x dan menganalisa penyebab keterlambatan proyek blok QCS pada galangan PT.Karimun Sembawang Shipyard. Dibuatkan penjadwalan menggunakan Critical Path Method (CPM) dan Network Planning akan dijabarkan seluruh daftar kegiatan yang diperlukan untuk menyelesaikan proyek, waktu atau durasi yang dibutuhkan dari setiap kegiatan. Dari hasil analisa didapatkan model penjadwalan C 29 hari dengan durasi lebih cepat. Earned Value Analysis (EVA) membantu memperkirakan biaya dari sebuah proyek proses perencanaan seluruh kegiatan yang harus diselesaikan dalam proyek akan lebih mudah. Didapatkan hasil analisa dipenjadwalan C biaya JO sebesar Rp 10.717.500, material Rp 622.012.162, dan Overhead Rp 189.820.698 dengan biaya yang turun sebesar 0,088%\",\"PeriodicalId\":308610,\"journal\":{\"name\":\"JURNAL JALASENA\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JURNAL JALASENA\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.51742/jalasena.v3i1.432\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL JALASENA","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51742/jalasena.v3i1.432","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

新的造船项目需要按照时间表快速工作。因此,有必要对造船进行计划和调度,以便船东及时收到。在每个实施实践中,不可避免地存在各种可能导致延迟的可能性,例如实施延迟、设计更改、天气影响、材料供应延迟、施工失败和规划错误。本研究旨在分析卡里门三巴旺PT船厂x船项目的进度安排,并分析QCS块项目延误的原因。使用关键路径法(CPM)进行调度,网络规划将描述完成项目所需的整个活动列表,每个活动所需的时间或持续时间。从分析结果来看,29天C调度模型工期较短。挣值分析(EVA)有助于估算项目的成本,项目中必须完成的所有活动的计划过程将更容易。在调度C的分析结果中,JO成本为Rp. 10,717,500,材料成本为Rp. 622012,162,开销成本为Rp. 189,820,698,成本降低0.088%。我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是,我的意思是。Tak bisa terelakkan bahwa padsetiap praktik pelaksanaan terdapat berbagai kemungkinan yang dapat menyebabkan keterlambatan, misalnya keterlambatan pelaksanaan, perubahan desain, pengaruh cuaca, keterlambatan suplai material, kegagalan konstruksi, dan kesalahan perencanan。Penelitian ini bertujuan untuk menganalisa penjadwalan proyek kapal x dan menganalisa penyebab keterlambatan proyek block QCS padgalangan PT.Karimun Sembawang造船厂。关键路径法(CPM)网络规划akan dijabarkan seluruh data kegiatan yang diperlukan untuk menyelesaikan proyek, waktu atau durasi yang dibutuhkan dari seap kegiatan。dhail分析了dhapa模型penjadwalan c29 hari dengan durasi lebih。挣值分析(EVA)是一种基于挣值分析(EVA)的分析方法,该方法是基于挣值分析和挣值分析。Didapatkan hasil analisa dipenjadwalan C biaya JO sebesar Rp 10.717.500,材料Rp 622.012.162, dan Overhead Rp 189.820.698 dengan biaya yang turun sebesar 0,088%
本文章由计算机程序翻译,如有差异,请以英文原文为准。
EFISIENSI PROYEK PEMBANGUNAN BLOK QCS DENGAN INTEGRASI METODE CPM DAN EVA (STUDI KASUS PT. KARIMUN SEMBAWANG SHIPYARD)
New shipbuilding projects are required to work quickly according to schedule. For this reason, it is necessary to have a planning and scheduling for shipbuilding so that it is received by the shipowner on time. It is inevitable that in every implementation practice there are various possibilities that can cause delays, such as delays in implementation, design changes, weather effects, delays in material supply, construction failures, and planning errors. This study aims to analyze the scheduling of ship x project and analyze the causes of delays in QCS block project at the PT. Karimun Sembawang Shipyard. Scheduling is made using the Critical Path Method (CPM) and Network Planning will describe the entire list of activities needed to complete the project, the time or duration required for each activity. From the results of the analysis, it was found that the 29-day C scheduling model with a shorter duration. Earned Value Analysis (EVA) helps estimate the cost of a project, the planning process of all activities that must be completed in the project will be easier. The results of the analysis in scheduling C, JO costs are Rp. 10,717,500, material is Rp. 622,012,162, and Overhead is Rp. 189,820,698 with a decrease in costs of 0.088%. Pada proyek pembangunan kapal baru dituntut untuk bekerja cepat sesuai dengan jadwal Untuk itu, perlu adanya suatu perencanaan dan penjadwalan untuk pembangunan kapal supaya diterima dengan pemilik kapal tepat waktu. Tak bisa terelakkan bahwa pada setiap praktik pelaksanaan terdapat berbagai kemungkinan yang dapat menyebabkan keterlambatan, misalnya keterlambatan pelaksanaan, perubahan desain, pengaruh cuaca, keterlambatan suplai material, kegagalan konstruksi, dan kesalahan perencanaan. Penelitian ini bertujuan untuk menganalisa penjadwalan proyek kapal x dan menganalisa penyebab keterlambatan proyek blok QCS pada galangan PT.Karimun Sembawang Shipyard. Dibuatkan penjadwalan menggunakan Critical Path Method (CPM) dan Network Planning akan dijabarkan seluruh daftar kegiatan yang diperlukan untuk menyelesaikan proyek, waktu atau durasi yang dibutuhkan dari setiap kegiatan. Dari hasil analisa didapatkan model penjadwalan C 29 hari dengan durasi lebih cepat. Earned Value Analysis (EVA) membantu memperkirakan biaya dari sebuah proyek proses perencanaan seluruh kegiatan yang harus diselesaikan dalam proyek akan lebih mudah. Didapatkan hasil analisa dipenjadwalan C biaya JO sebesar Rp 10.717.500, material Rp 622.012.162, dan Overhead Rp 189.820.698 dengan biaya yang turun sebesar 0,088%
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信