Alvia Wesnita, Mega Elfia, Alwa Pascaselnofra Amril
{"title":"KUALITAS PELAYANAN DAN KEPUASAN PELANGGAN PADA OPTIK DI SUMATERA BARAT","authors":"Alvia Wesnita, Mega Elfia, Alwa Pascaselnofra Amril","doi":"10.33559/eoj.v4i4.1186","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1186","url":null,"abstract":"Satisfaction is the level of feeling after comparing perceived performance with expectations (Philip Kotler, 1997, 36). So a company must pay attention to the things that are considered important by customers so that their expectations are met. Quality of service is centered on efforts to fulfill customer needs, such as accuracy in inspection, conformity of product specifications and processing time provided according to order as well as friendly service from each personnel. The results of the study A total of 15 respondents (50%) are very satisfied and 15 respondents (50%) are satisfied with the effectiveness of the service and as many as 15 respondents (50%) are very satisfied and 15 respondents (50%) are satisfied with the efficiency of optical services in West Sumatra. Based on the results of this study, there are several suggestions that need to be submitted, namely: (1) Researchers must understand and be able to explain and be able to apply the implementation of service effectiveness and efficiency to customer satisfaction (2) Optical in order to implement the implementation of service effectiveness and efficiency on satisfaction customers, and an optical refraction check should be carried out by an Optimist Refractionist and (3) the public so that they can choose and make glasses with maximum service and results so that satisfaction is achieved.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131347408","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"AN ANALYSIS OF THE STUDENTS’ ERRORS IN USING SIMPLE PRESENT TENSE IN WRITING DESCRIPTIVE TEXT AT THE TENTH GRADE OF SMAN 2 BENGKALIS","authors":"Maisyara Maisyara, Ade Silvana, Noval Fadli","doi":"10.33559/eoj.v4i4.1156","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1156","url":null,"abstract":"This research described the students’ errors in using simple present in writing descriptive text. The research was conducted on June 2020. The subject of this research was the tenth grade students at SMAN 2 Bengkalis, and the object of the research were the studens’ errors in using simple present tense. The sample was taken based on simple random sampling technique with the total number were 34 students. In order to collect the data, the researcher used a test.The test was used to find out the students’ errors in using simple present tense in writing descriptive text. Based on the data analysis researcher concluded that the total errors of omission are 34 errors or 27.2%, errors of addition are 10 errors or 8.1%, error of misformation are 50 errors or 40,6%, and errors of misordering are 29 errors or 23.5%. Source of errors interlingual transfer was 29.2% and intralingual transfer was 70.7%. From the calculation of the data, error of misformation was the most frequent errors were made by the tenth grade students of SMAN 2 Bengkalis with the percentage 40.6%. The data also indicate that Intralingual transfer is the major source of the error were made by the students with the percentage 70.7%.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"68 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123102534","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANALISIS PERBANDINGAN DESAIN STRUKTUR GEDUNG BETON BERTULANG SISTEM RANGKA PEMIKUL MOMEN KHUSUS (SRPMK) DAN SISTEM GANDA (DUAL SYSTEM) DI KOTA PADANG","authors":"Agus Agus, Fazi Oktoferian Cahya","doi":"10.33559/eoj.v4i4.1180","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1180","url":null,"abstract":"Kota Padang terletak pada daerah gempa kuat sebagaimana Peta Wilayah Gempa Indonesia 2017. Untuk membangun Gedung di daerah rawan gempa kuat, terdapat beberapa sistem struktur yang direkomendasikan, diantaranya adalah Sistem Rangka Pemikul Momen Khusus (SRPMK) dan Sistem Ganda (Dual System). Penelitian ini dimaksudkan untuk menganilisis perbandingan desain bangunan beton bertulang kedua sistem struktur tersebut ( SRPMK dan Dual System) yang terletak di kota Padang. Model bangunan beton bertulang 6 tingkat didesain sebagai Sistem Rangka Pemikul Momen Khusus (SRPMK) dan Sistem Ganda (Dual System) untuk mengetahui perbandingan dari respon masing-masing bangunan terhadap beban-beban yang terjadi serta untuk mengetahui penggunaan sistem struktur yang efisien. Analisis dilakukan menggunakan aplikasi SAP2000 versi 14. Perancangan bangunan gedung ini berdasarkan persyaratan Beton Struktural untuk Bangunan Gedung (SNI 2847-2013) dan persyaratan Perencanaan Gempa untuk Struktur Bangunan Gedung dan Non Gedung (SNI 1726-2019). Perencanaan ini dimulai dari menentukan data-data dasar perencanaan dan pembebanan yang terjadi pada struktur. Pembebanan dihitung berdasarkan denah lantai dan fungsi bangunan. Perhitungan pembebanan dilakukan mengikuti persyaratan Beban Minimum untuk Perancangan Bangunan Gedung dan Struktur Lain (SNI 1727-2013). Dari hasil analisis yang dilakukan, dapat dilihat bahwa bangunan yang menggunakan Sistem Rangka Pemikul Momen Khusus (SRPMK) memiliki displacement dan drift yang lebih besar jika di bandingkan dengan bangunan yang menggunakan Sistem Ganda (Dual System), meskipun keduanya masih dalam batas yang diizinkan. Sedangkan dari dimensi penampang kolom, pada Sistem Ganda (Dual System) memiliki dimensi kolom yang lebih kecil dari banguan yang menggunakan Sistem Rangka Pemikul Momen Khusus (SRPMK). Walau bagaimanapun, berdasarkan analisis dinamis pada kedua model struktur bangunan, pada dasarnya model struktur Sistem Rangka Pemikul Momen Khusus (SRPMK) didapati lebih efisien.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126103467","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Zulwisli Zulwisli, Andhika Herayono, Nizwardi Jalinus, R. Ridwan
{"title":"PEMANFAATAN MODEL PEMBELAJARAN TEKNOLOGI DAN MULTIMEDIA SEBAGAI STRATEGI PEMBELAJARAN AKTIF","authors":"Zulwisli Zulwisli, Andhika Herayono, Nizwardi Jalinus, R. Ridwan","doi":"10.33559/eoj.v4i4.1161","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1161","url":null,"abstract":"Merancang pembelajaran dengan baik akan menentukan capaian dari tujuan pembelajaran. Kualitas rancangan pembelajaran ditentukan oleh tenaga pendidik dengan pemanfaatan model pembelajaran yang digunakan sebagai strategi pembelajaran. Model pembelajaran saat ini sudah memiliki banyak variasi yang dapat diimplementasikan selama pelaksanaan kegiatan pembelajaran. Model pembelajaran yang bervariasi diharapkan mampu menciptakan pembelajaran aktif. Pembelajaran aktif mampu mendukung antusias peserta didik mengikuti proses belajar mengajar dengan seksama. Penelitian ini memanfaatkan metode penelitian deskriptif kualitatif yang dipadukan dengan teknik pengambilan data observasi dan wawancara. Penelitian ini dilaksanakan dengan tujuan untuk mengetahui dan menganalisa pemanfaatan model pembelajaran teknologi dan multimedia sebagai strategi pembelajaran. Hasil akhir dari penelitian ini menyatakan bahwa model pembelajaran teknologi dan multimedia bisa menjadi strategi pembelajaran aktif jika pemanfaatannya dikelola dengan cerdas dan kreatif oleh tenaga pendidik.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122273421","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Risa Nadia Ernes, Defnizal Defnizal, Nanda Tommy Wirawan
{"title":"PENGONTROLAN RUANGAN DAN PENGAWASAN ASAP ROKOK MENGGUNAKAN PENDETEKSI ASAP MQ2 DAN CAMERA","authors":"Risa Nadia Ernes, Defnizal Defnizal, Nanda Tommy Wirawan","doi":"10.33559/eoj.v4i4.1170","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1170","url":null,"abstract":"This research is in the form of emergency lights and security equipment in the room using Arduino which is made to assist the community in making it easier to activate/deactivate and avoid any danger as soon as possible in a special room. This system is made by designing, manufacturing and implementing a system of components that include a microcontroller as a controller and an LCD as an output to display system status and ADC values from sensors, AC and LED as room lighting, DVR Camera as output to record room conditions, and as an output. The MP3 module is the output of the sound information media which provides information on the status of the emergency and security lighting systems and information on the existence of a fire that is issued with the speaker as output according to the specified program. The system also uses an LDR Sensor to detect light in the room as input, an MQ2 Sensor as an input to detect smoke content, ACS712 Current Sensor as an input for measuring current from activating AC lights, and Remote Control as an input to manually activate and deactivate the system. The results of the study indicate that the tool made can work well and can be developed on a larger scale.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126818908","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"PEMBUATAN BIODIESEL DARI CRUDE PALM OIL (CPO) DILAKUKAN DENGAN TAHAP ESTERIFIKASI DAN TRANSESTERIFIKASI","authors":"Nurmeizon Saleh","doi":"10.33559/eoj.v4i4.1158","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1158","url":null,"abstract":"Minyak nabati yang dapat digunakan sebagai bahan bakar alternatif diesel dengan perkebunan yang luas dan produksi yang besar di Indonesia saat ini adalah sawit dengan memproduksi Crude Palm Oil (CPO). Crude Palm Oil (CPO) digunakan sebagai bahan baku pembuatan biodiesel pada penelitian ini dilakukan dengan tahap esterifikasi dan transesterifikasi, katalis yang digunakan pada tahap esterifikasi adalah H2SO4 (pa) sebanyak 1% (b/b) dan metanol sebanyak 15% (b/b), dan katalis KOH (pa) sebanyak 1 % (b/b) pada tahap transesterifikasi.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"109 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123198748","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Antonov Bachtiar, Zuriman Anthony, Anggun Anugrah, Sepannur Bandri, S. Yudha
{"title":"STUDI PENGARUH DESAIN 9 MEDAN FLUKS TERHADAP EFISIENSI DAN FAKTOR DAYA MOTOR INDUKSI 3-FASA","authors":"Antonov Bachtiar, Zuriman Anthony, Anggun Anugrah, Sepannur Bandri, S. Yudha","doi":"10.33559/eoj.v4i4.1171","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1171","url":null,"abstract":"Penelitian ini mengkaji atau mempelajari pengaruh pengembangan desain 9 medan fluks dari motor induksi 3-fasa dimana motor induksi ini disuplay dengan tegangan 3-fasa. Agar motor induksi ini menghasilkan 9 medan fluks sama seperti motor induksi 9-fasa, maka rangkaian kumparan pada motor dibuat sedemikian rupa dengan menambahkan rangkaian kapasitor pada 3 buah kumparan. Lapisan 1 ada 3 kumparan dan lapisan 2 ada 3 kumparan, dibuat dengan membalik arah fluks sehingga medan berbalik dan pada 3 kumparan lapisan ke 2 tidak ada modifikasi, dan diharapkan akan menghasilkan motor induksi 3-fasa yang bekerja dengan 9 medan magnet seperti halnya motor induksi 9-fasa. Kajian pada Penelitian ini difokuskan pada faktor daya dan efisiensi motor induksi 3-fasa. Data hasil penelitian diperoleh dengan menguji langsung motor induksi 3-fasa dan motor desain 9 medan fluks dengan memvariasikan beban pada motor. Data yang diperlukan adalah arus, tegangan, faktor daya, kecepatan dan daya masukan. Pada pengujian motor induksi 3-fasa dan pengujian motor induksi desain 9 medan fluks pengujian tanpa beban di dapatkan arus sebesar 0.99A, 1A, 0.69A untuk motor induksi 3-fasa dan untuk motor desain 9 medan fluks di dapatkan arus sebesar 3,184A, 3,623A, 3,181A sedangkan untuk arus nominal motor induksi ini sebesar 2,5A. Untuk hasil dari pengolahan data efisiensi yang didapatkan pada motor induksi 3-fasa konvensional lebih tinggi dari pada efisiensi motor induksi desain 9 medan fluks. Kemudian hasil dari pengolahan data faktor daya juga didapatkan hasil efisiensi motor induksi 3-fasa konvensional lebih tinggi dari motor induksi desain 9 medan fluks.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"48 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116293080","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANALISIS TINGKAT LABOUR UTILITATION RATE (LUR) PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAAN PASANGAN BATA PEMBANGUNAN GIS 150 kV KOTA PADANG","authors":"Leli Honesti, Yessy Yusnita","doi":"10.33559/eoj.v4i4.1189","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1189","url":null,"abstract":"One of the elements that affect the achievement of construction project objectives is labor productivity. The level of labor productivity can be measured in various ways, where one method that is already known is the Labor Utilization Rate (LUR) method. Here it is assessed how much the LUR level of each worker is, namely the level of effectiveness of workers at work. Several factors that can affect the level of productivity, in this case are age, work experience, education level, wage suitability, health, relations between workers, and managerial. The purpose of this research is to 1). determine the level of Labor Utilization Rate (LUR) of labor productivity; 2). determine the factors that influence age, work experience, education level, wage suitability, health, relations between workers, and managerial on labor productivity and, 3) determine which factors are the most dominant influencing productivity levels in bricklaying work. The research was conducted at the 150 kV GIS construction project in Padang City by observing the productivity level of each 10 workers for 3 days and accompanied by filling out a questionnaire. Based on observations in the field, then taking and collecting data, namely productivity data and questionnaires, then data processing was carried out with the help of the SPSS version 21 program. the 150 kV GIS development project in Padang City is 89.29% > 50%. This shows productive because it is more than 50%. Variables that have been determined, with a significance value of 0.053 > 0.05, so that it simultaneously has no effect. Then, partially age with a sig value of 0.011 <0.05 and work experience with a sig of 0.041 <0.05, so that it affects the level of productivity. From this study also found that managerial variables have an effect, which is the most dominant, which has a beta value of 1.953.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"1996 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131369701","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"PERENCANAAN GEOMETI JALAN REL KERETA API BUKITTINGGI-PAYAKUMBUH STA 94+675-STA 124+526","authors":"Elvi Syamsuir, Fatma Ira Wahyuni, S. Siska","doi":"10.33559/eoj.v4i4.1182","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1182","url":null,"abstract":"West Sumatra Province is one of the provinces where the City and Regency have natural resources and many tourist objects. These cities and regencies have natural resources and tourist objects that have their respective advantages. Several cities from the many cities in West Sumatra that have a busy tourist attraction are the cities of Bukittinggi and Payakumbuh. In addition to having many tourist attractions, it also has abundant natural resources such as plantations, forestry, and industry. To visit and transport these resources, it must be supported by proper and adequate transportation facilities. Currently, the transportation used to transport goods and passengers uses roads, so it has the potential to cause problems both in terms of facilities and infrastructure and the emergence of congestion due to heavy traffic. Therefore, an alternative mode of transportation is needed to help reduce the burden of the highway, namely the mode of rail transportation for the smooth flow of distribution of goods and services, so it is felt that the Bukittinggi - Payakumbuh railway line is needed. This line is part of the route traversed by the Trans Sumatra Railway. This railway line is built or reactivated in order to reduce congestion that occurs at certain times. In the process of loading the Bukitinggi - Payakumbuh railway line, a methodology for collecting primary and secondary data, problem identification, literature study and analysis is needed. planning data in the form of design speed analysis, rail analysis and bearing analysis to be used. In this paper, the selection of the route, Geometric Planning, Railroad Construction Planning and at Km 15 is carried out. The selection of the route is based on the design speed of the train plan. Geometric planning using the Railways Management and Engineering method. Railroad construction refers to regulation PD-10 PJKA (1986). The results obtained from this paper are the planning of the railroad route as an alternative mode of transportation along ± 30 km from the City of Bukittinggi - Payakumbuh. So that it can be used as a comparison suggestion for the West Sumatra Provincial Government in building railroads in the future.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"32 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122924293","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Linda Handayuni, Ririn Afrima Yenni, Dewi Mardiawati, Melda Yenti
{"title":"LITERATUR REVIEW TENTANG SIKAP DAN PENGETAHUAN PETUGAS MEDIS TERHADAP KELNGKAPAN PENGISIAN RESUME MEDIS RAWAT INAP","authors":"Linda Handayuni, Ririn Afrima Yenni, Dewi Mardiawati, Melda Yenti","doi":"10.33559/eoj.v4i4.1160","DOIUrl":"https://doi.org/10.33559/eoj.v4i4.1160","url":null,"abstract":"A medical resume is a summary of all services received by patients during treatment or treatment carried out by health workers. The incompleteness of filling in inpatient medical resumes in hospitals still exists such as lack of attitude and knowledge of health workers, busyness of doctors, absence of SOPs, disagreement with the time limit for filling out medical resumes, which is 1x24 hours. The purpose of this study was to describe the attitudes and knowledge of medical officers to the completeness of filling out an inpatient medical resume. The data used is secondary data, then the data is analyzed by looking for similarities, dissimilarities, views, comparisons and summaries of several research results. The results of the study from 10 journals showed that there were still incomplete medical resumes, due to the lack of knowledge and attitude of officers regarding the importance of completing medical resumes, the unavailability of SOPs for filling out resumes, busy doctors serving patients, resulting in limited time to complete them and the discipline of the doctor in charge. which is still low. From the researcher's analysis, it was concluded that the high number of completeness of completing inpatient medical resumes in hospitals was due to undisciplined officers and the lack of knowledge of officers about filling out resumes. In order to increase the completeness of filling in inpatient medical resumes in hospitals, health workers need to cooperate with each other in filling out medical record documents, especially medical resume sheets in order to create a good, complete and accurate filling.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125145327","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}