ANALISIS TINGKAT LABOUR UTILITATION RATE (LUR) PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAAN PASANGAN BATA PEMBANGUNAN GIS 150 kV KOTA PADANG

Leli Honesti, Yessy Yusnita
{"title":"ANALISIS TINGKAT LABOUR UTILITATION RATE (LUR) PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAAN PASANGAN BATA PEMBANGUNAN GIS 150 kV KOTA PADANG","authors":"Leli Honesti, Yessy Yusnita","doi":"10.33559/eoj.v4i4.1189","DOIUrl":null,"url":null,"abstract":"One of the elements that affect the achievement of construction project objectives is labor productivity. The level of labor productivity can be measured in various ways, where one method that is already known is the Labor Utilization Rate (LUR) method. Here it is assessed how much the LUR level of each worker is, namely the level of effectiveness of workers at work. Several factors that can affect the level of productivity, in this case are age, work experience, education level, wage suitability, health, relations between workers, and managerial. The purpose of this research is to 1). determine the level of Labor Utilization Rate (LUR) of labor productivity; 2). determine the factors that influence age, work experience, education level, wage suitability, health, relations between workers, and managerial on labor productivity and, 3) determine which factors are the most dominant influencing productivity levels in bricklaying work. The research was conducted at the 150 kV GIS construction project in Padang City by observing the productivity level of each 10 workers for 3 days and accompanied by filling out a questionnaire. Based on observations in the field, then taking and collecting data, namely productivity data and questionnaires, then data processing was carried out with the help of the SPSS version 21 program. the 150 kV GIS development project in Padang City is 89.29% > 50%. This shows productive because it is more than 50%. Variables that have been determined, with a significance value of 0.053 > 0.05, so that it simultaneously has no effect. Then, partially age with a sig value of 0.011 <0.05 and work experience with a sig of 0.041 <0.05, so that it affects the level of productivity. From this study also found that managerial variables have an effect, which is the most dominant, which has a beta value of 1.953.","PeriodicalId":297009,"journal":{"name":"Ensiklopedia of Journal","volume":"1996 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ensiklopedia of Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33559/eoj.v4i4.1189","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

One of the elements that affect the achievement of construction project objectives is labor productivity. The level of labor productivity can be measured in various ways, where one method that is already known is the Labor Utilization Rate (LUR) method. Here it is assessed how much the LUR level of each worker is, namely the level of effectiveness of workers at work. Several factors that can affect the level of productivity, in this case are age, work experience, education level, wage suitability, health, relations between workers, and managerial. The purpose of this research is to 1). determine the level of Labor Utilization Rate (LUR) of labor productivity; 2). determine the factors that influence age, work experience, education level, wage suitability, health, relations between workers, and managerial on labor productivity and, 3) determine which factors are the most dominant influencing productivity levels in bricklaying work. The research was conducted at the 150 kV GIS construction project in Padang City by observing the productivity level of each 10 workers for 3 days and accompanied by filling out a questionnaire. Based on observations in the field, then taking and collecting data, namely productivity data and questionnaires, then data processing was carried out with the help of the SPSS version 21 program. the 150 kV GIS development project in Padang City is 89.29% > 50%. This shows productive because it is more than 50%. Variables that have been determined, with a significance value of 0.053 > 0.05, so that it simultaneously has no effect. Then, partially age with a sig value of 0.011 <0.05 and work experience with a sig of 0.041 <0.05, so that it affects the level of productivity. From this study also found that managerial variables have an effect, which is the most dominant, which has a beta value of 1.953.
分析巴东镇GIS 150 kV建筑工人工人的就业比率(润滑)
影响建设项目目标实现的因素之一是劳动生产率。劳动生产率水平可以用各种方法来衡量,其中一种已知的方法是劳动利用率(LUR)方法。这里评估的是每个工人的LUR水平,即工人在工作中的效率水平。在这种情况下,影响生产力水平的几个因素是年龄、工作经验、教育水平、工资适宜性、健康、工人之间的关系和管理。本研究的目的是:1)确定劳动生产率的劳动利用率(LUR)水平;2)确定年龄、工作经验、受教育程度、工资适宜性、健康状况、工人关系、管理层对劳动生产率的影响因素;3)确定哪些因素对砌砖工作的生产率水平影响最大。研究在巴东市150 kV GIS建设项目中进行,每10名工人观察3天的生产力水平,并填写问卷。在实地观察的基础上,采集和收集数据,即生产率数据和调查问卷,然后使用SPSS 21版程序进行数据处理。巴东市150千伏GIS开发项目占89.29% bb0 50%。这是生产性的,因为它超过了50%。变量已确定,显著性值为0.053 bb0 0.05,使其同时无影响。然后,部分年龄(sig值为0.011 <0.05)和工作经验(sig值为0.041 <0.05)影响生产率水平。从本研究还发现,管理变量有影响,这是最主要的,其贝塔值为1.953。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信