INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)最新文献

筛选
英文 中文
DIGITAL CONVERGENCE AND VALUE CREATION: TVONE’S STRATEGIC ADAPTATION TO THE DIGITAL LANDSCAPE 数字融合与价值创造:TVONE 对数字环境的战略调整
Sekarseta Prihatmadi
{"title":"DIGITAL CONVERGENCE AND VALUE CREATION: TVONE’S STRATEGIC ADAPTATION TO THE DIGITAL LANDSCAPE","authors":"Sekarseta Prihatmadi","doi":"10.55047/ijateis.v3i4.1080","DOIUrl":"https://doi.org/10.55047/ijateis.v3i4.1080","url":null,"abstract":"In the wake of the Analog Switch Off (ASO) in Indonesia since November 2022, the traditional television industry faces significant challenges, including a decline in viewership and a fiercely competitive advertising market. With over 40 digital channels available in Jakarta alone, compared to just 11 national television stations previously, and the growing dominance of digital media, traditional broadcasters are compelled to adapt. This study focuses on tvOne, a conventional television broadcaster, and its strategic responses to these challenges. Our research methodology employs a qualitative approach in order to extract valuable and insightful information from highly knowledgeable sources. To achieve this, we have conducted interviews with seasoned policymakers in tvOne's business strategy, as well as with professionals working in the digital division. By doing so, we aim to obtain a comprehensive understanding of the subject matter at hand. This will enable us to present a comprehensive and accurate report that will benefit the industry as a whole. The analysis reveals how tvOne leverages media convergence to transform digital threats into opportunities for value creation. Specifically, it explores tvOne's use of news broadcast footage and digital platforms like YouTube to carve out new economic niches. This case study contributes to the understanding of how television stations can utilize technology advancements to enhance the value of their offerings. It offers valuable strategies and recommendations for broadcasters navigating the rapid technological evolution in the digital era, underscoring the importance of adaptation and innovation in sustaining relevance and competitiveness","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"12 4","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-02-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140437055","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
INDIRECT COST ANALYSIS OF THE CONSTRUCTION PROJECT OF SPORTS FACILITIES IN KANOR SUB-DISTRICT, BOJONEGORO DISTRICT WITH LINEAR REGRESSION METHOD 用线性回归法分析博若内戈罗区卡诺尔分区体育设施建设项目的间接成本
Syaefuddin Zuhri, Budi Witjaksana, H. T. Tjendani
{"title":"INDIRECT COST ANALYSIS OF THE CONSTRUCTION PROJECT OF SPORTS FACILITIES IN KANOR SUB-DISTRICT, BOJONEGORO DISTRICT WITH LINEAR REGRESSION METHOD","authors":"Syaefuddin Zuhri, Budi Witjaksana, H. T. Tjendani","doi":"10.55047/ijateis.v3i2.982","DOIUrl":"https://doi.org/10.55047/ijateis.v3i2.982","url":null,"abstract":"The calculation of indirect costs carried out by contractors so far has no reference or there is no standardized design to be a benchmark. For this reason, researchers will analyze the primary and secondary data of this study to determine the indirect costs of direct costs or against the contractors' contracts. This study analyzes the amount of indirect costs in the Kanor District Sports Facilities Development project of Bojonegoro Regency and looks for a relationship between indirect costs and bid prices with time performance on the Kanor District Sports Facilities Development project of Bojonegoro Regency. This research method uses data processing and indirect cost RAB making. and using analysis methods with linear regression statistical analysis. Indirect costs in the Kanor District Sports Facilities Development project are allocated to 4 (four) main things, namely tax and insurance costs (61.49%), risk costs (7.21%), and overhead costs (8.62%), general costs (8.325) quality costs 4.36%) where the percentage is calculated from the total amount of indirect costs. From the linear regression analysis it can be concluded that indirect costs affect the project work time. Bid price has no effect on project work time. Indirect costs and bid prices affect the time of work.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"169 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140501548","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD 采用碰撞法对蓬蒂亚纳克快餐店建筑项目进行成本和时间分析
Oskar Ezra Alan Muin, H. T. Tjendani, Budi Witjaksana
{"title":"COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD","authors":"Oskar Ezra Alan Muin, H. T. Tjendani, Budi Witjaksana","doi":"10.55047/ijateis.v3i1.1046","DOIUrl":"https://doi.org/10.55047/ijateis.v3i1.1046","url":null,"abstract":"The construction project of the McD Pontianak building encountered significant challenges due to a tight schedule of 110 calendar days and unforeseen delays arising from the existing building's foundation. These delays led to a setback in the construction progress, prompting the need for strategic measures to accelerate the project and mitigate the delays amounting to 11.48%, equivalent to 12.63 days. The potential financial consequences of this delay were estimated at IDR 228,366,605. In order to expedite the construction process, the chosen acceleration method was the crashing method, involving an increase in overtime ranging from 1 to 4 working hours, in accordance with relevant laws and regulations. This required a comprehensive analysis encompassing normal cost, normal duration, critical path, productivity, crashing cost, and crashing duration calculations. Upon thorough examination, it was determined that the optimal solution to overcome the delays was to implement an additional 2 hours of overtime. However, this decision came with associated costs, resulting in a necessary expenditure of IDR 93,651,965 to achieve a crashing time of 18.30 days. Despite the increased financial commitment, this strategic approach was deemed essential to meet the project's original schedule and avoid potential penalties. The findings and conclusions drawn from this analysis provide valuable insights into effective project management and decision-making in the face of unexpected challenges in the construction industry.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"95 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140501677","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF GOVERNMENT AND NON-GOVERNMENT INVESTMENT IN TPASR PROBOLINGGO DEVELOPMENT 政府和非政府投资对 TPASR PROOLINGGO 开发的分析
Aditya Irwanto, W. Oetomo, Koespiadi
{"title":"ANALYSIS OF GOVERNMENT AND NON-GOVERNMENT INVESTMENT IN TPASR PROBOLINGGO DEVELOPMENT","authors":"Aditya Irwanto, W. Oetomo, Koespiadi","doi":"10.55047/ijateis.v3i1.993","DOIUrl":"https://doi.org/10.55047/ijateis.v3i1.993","url":null,"abstract":"Waste management is a pressing issue in Probolinggo Regency and City, necessitating swift action to mitigate environmental impacts. The construction of the Probolinggo Regional Waste Landfill (TPA) aims to address this challenge through cross-regional sanitation services. Proper financing is crucial for successful infrastructure development, and this study compares government budget (APBN/APBD) and non-government (regional loans) financing schemes. Utilizing a quantitative approach with primary and secondary data, the analysis indicates the viability of both financing options. Government-sourced investment shows an NPV of Rp 431,148,007,790, IRR 40.55%, BCR 1.07, and a 3-year payback period. Meanwhile, non-government or regional loans exhibit an NPV of Rp 110,115,495,905, IRR 9.03%, BCR 1.3, and a 9-year payback period. The decision-making process, weighing financial and non-financial criteria, favors regional loans/loans as the preferred financing scheme for the Probolinggo TPASR project. This research emphasizes the importance of a well-selected financing scheme to ensure the success and sustainability of the Probolinggo Regional Waste Landfill infrastructure.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"79 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140501792","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
INVESTMENT ANALYSIS ON THE DEVELOPMENT OF WATU ULO FISHING PORT BASED ON FINANCIAL ASPECTS AND SENSITIVITY ASPECTS 基于财务方面和敏感性方面的瓦图乌洛渔港开发投资分析
Tati Mushalihati Ratuinsani, Haris Muhammadun, Laksono Djoko Nugroho
{"title":"INVESTMENT ANALYSIS ON THE DEVELOPMENT OF WATU ULO FISHING PORT BASED ON FINANCIAL ASPECTS AND SENSITIVITY ASPECTS","authors":"Tati Mushalihati Ratuinsani, Haris Muhammadun, Laksono Djoko Nugroho","doi":"10.55047/ijateis.v3i1.1019","DOIUrl":"https://doi.org/10.55047/ijateis.v3i1.1019","url":null,"abstract":"Watu Ulo Beach serves as a vital hub for fishing communities, supplying resources for sea fishing and serving as a landing point for catches. The local government plans to construct a fishing port at Watu Ulo to enhance facilities for fishermen. This study assesses the financial feasibility and sensitivity of investing in the port's construction, considering three income scenarios: pessimistic, moderate, and optimistic. Financial analysis using NPV, IRR, BCR, and PP methods deems the project feasible for moderate and optimistic scenarios, but not for the pessimistic scenario due to IRR (6.15%) < MARR (7.72%). Sensitivity analysis reveals that revenue sensitivity is critical for all scenarios, with the investment becoming unfeasible if revenue falls below certain thresholds: -13.67% for pessimistic, -39.96% for moderate, and -40.75% for optimistic scenarios. Operating cost sensitivity is also crucial, rendering the investment unfeasible if costs deviate beyond specific thresholds: -15.96% for pessimistic, +22.67% for moderate, and 25.59% for optimistic scenarios.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"166 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140501700","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF EMOTIONAL INTELLIGENCE DETERMINANTS IN NURSING PROFESSION STUDENTS IN BANDA ACEH AND ACEH BESAR 分析班达亚齐和亚齐比萨护理专业学生的情商决定因素
Nanda Desreza, Renamisdayani Renamisdayani, Ryan Mulfianda
{"title":"ANALYSIS OF EMOTIONAL INTELLIGENCE DETERMINANTS IN NURSING PROFESSION STUDENTS IN BANDA ACEH AND ACEH BESAR","authors":"Nanda Desreza, Renamisdayani Renamisdayani, Ryan Mulfianda","doi":"10.55047/ijateis.v3i2.970","DOIUrl":"https://doi.org/10.55047/ijateis.v3i2.970","url":null,"abstract":"Emotional intelligence is a person's ability to regulate their emotional life with intelligence, maintaining emotional harmony and expression through the skills of self-awareness, self-control, self-motivation, empathy and social harmony.  The aim of this research is to analyze the relationship between emotional intelligence and nursing professional students in Banda Aceh Aceh Besar 2023. This type of research is descriptive correlation.  The population in this study was 288 nursing professional students from Banda Aceh, Aceh Besar.The sampling technique used accidental sampling with a sample size of 258. This research was carried out on 20-30 July 2023. The results of the research obtained a value for self-awareness with emotional intelligence p=value 0.013, it can be concluded that there is a relationship between self-awareness and emotional intelligence, on self-regulation  p value = value 0.033 there is a relationship between self-regulation and emotional intelligence, for motivation with a value of p = value 1.000 thre is no relationship between motivation and emotional intelligence, for empathy with a value of p = value 0.000 there is a relationship between empathy and emotional intelligence, for support from parents and family  p value = value 0.680, then there is no relationshipbetween  family support  emotional intelligence and friendship social relationships obtained p value = value 0.009, there is a relationship between friendship social relationships and emotional intelligence.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"8 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140501348","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF COST AND TIME PERFORMANCE IN THE WADUNGASRI MARKET CHANNEL NORMALIZATION WORK IN SIDOARJO USING THE EARNED VALUE METHOD 利用挣值法分析西多阿州瓦敦加斯里市场渠道正常化工程的成本和时间绩效
Wuri Proboretno, Budi Witjaksana, H. T. Tjendani
{"title":"ANALYSIS OF COST AND TIME PERFORMANCE IN THE WADUNGASRI MARKET CHANNEL NORMALIZATION WORK IN SIDOARJO USING THE EARNED VALUE METHOD","authors":"Wuri Proboretno, Budi Witjaksana, H. T. Tjendani","doi":"10.55047/ijateis.v3i2.983","DOIUrl":"https://doi.org/10.55047/ijateis.v3i2.983","url":null,"abstract":"The construction project management for Wadungasri Sidoarjo Market Drainage Normalization aims to achieve cost, quality, and time objectives within a 100-day timeframe. This study addresses a 7.44% delay experienced by contractors, seeking to establish early warning mechanisms for poor project performance. The Earned Value Method is employed, integrating time and cost value concepts. Key indicators such as Cost Variance (CV), Schedule Variance (SV), work productivity index (CPI), time productivity index (SPI), project completion cost forecast (EAC), and project completion schedule forecast (ECD) are utilized. The results reveal a required cost of Rp 563,044,547.85 (ETC) and a 65-day timeframe (ETS) at the end of the 7th week, with a 0.64% increase in project completion cost (EAC) over the contract cost. The project completion time (EAS) is estimated at 114 days, reflecting a 0.14% extension. The analysis emphasizes the importance for construction service providers to implement efficient methods and consistent supervision to avoid delays in the Wadungasri Sidoarjo Market Drainage Normalization project.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"47 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140502299","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
DESIGN REVIEW ANALYSIS OF THE USE OF STONE HEAPS FROM STONE EXCAVATIONS IN THE PROBOLINGGO – BANYUWANGI TOLL ROAD CONSTRUCTION PROJECT SECTION 3 普罗林戈-班佑万吉收费公路建设项目第 3 部分使用石料挖掘堆的设计审查分析
Muhammad Ali Hasymi Abdul Q, Budi Witjaksana, H. T. Tjendani
{"title":"DESIGN REVIEW ANALYSIS OF THE USE OF STONE HEAPS FROM STONE EXCAVATIONS IN THE PROBOLINGGO – BANYUWANGI TOLL ROAD CONSTRUCTION PROJECT SECTION 3","authors":"Muhammad Ali Hasymi Abdul Q, Budi Witjaksana, H. T. Tjendani","doi":"10.55047/ijateis.v3i1.998","DOIUrl":"https://doi.org/10.55047/ijateis.v3i1.998","url":null,"abstract":"In constructing a toll road, the road structure will be carried out by constructing embankments on the road. However, in practice it often causes elevation differences between the two land surfaces, thereby increasing the risk of landslides. The objectives of the research are 1) Identifying the impact if Common Borrow Material (CBM) embankment work is replaced by rock embankment from excavation results, 2) Determine the value engineering process steps related to completing alternative design selection if there are differences between the actual Detailed Engineering Design in the field and 3) Determine the strategy and design optimization for volume differences which have implications for additional costs and project implementation time. The research uses a combination of quantitative and qualitative research methods. The data analysis technique is carried out using the Zero-one and Cost Analysis methods. The research results prove that 1) Implementation of the design review method for changes in common borrow material dumping work requires innovation to reduce cost elements and match performance and quality. 2) Solving problems using the design review method in the civil works construction phase where the Detail Engineering Design and actual field conditions have different stages of value engineering analysis. 3) Based on function analysis to optimize cost savings for work items using design review, a Preliminary Design according to DED Rp. 4,068,258,782,670 and Design after RE Rp. IDR 3,987,286,153,268 so the cost reduction after implementing the design review for the work of piling stones from stone excavation results is IDR 80,972,629,402.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"99 2","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140502413","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD 采用时间成本折中法对 SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG - GITET LAMPUNG 1 的采购进行时间和成本分析
Ijaz Adam, Budi Witjaksana, H. T. Tjendani
{"title":"TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD","authors":"Ijaz Adam, Budi Witjaksana, H. T. Tjendani","doi":"10.55047/ijateis.v3i1.992","DOIUrl":"https://doi.org/10.55047/ijateis.v3i1.992","url":null,"abstract":"Indonesia as an archipelago state is still need an equality development with the intention in achieving the goals to fulfill the requirement of structure and infrastructure. The economy that has experiencing growth, it can be seen with the rising of the demand for supply of electricity power whether it is coming from domestic moreover from industrial usages. Lampung Province, as one of the regions which is in a continuation to develop, requires the support of electric power, which at its peak load reaches 1200 MW, while the capacity of the existing power plant can only produce 700 MW, therefore the construction of a 275 kV Gumawang-Lampung 1 SUTET interconnection network with a capacity of up to 2000 MW was established to meet these requirements. Based on the time schedule which noted that the duration of foundation work started with the excavation, concreting until the reaches of it's curing time in 28 days is 42 days in 2023 December 13th is on try to speed up can be curing in 2023 December 8th, so the schedule tower installation in 2023 December 9th will be on time. Due to this delay, the researcher intends to carry out an acceleration analysis starting with preparing a network diagram using the Microsoft Project software, followed by the crashing process by adding groups of workers and tools of any activities on the critical path. The next step is to calculate the crash cost and cost slope values using the time cost trade off (TCTO) method.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"437 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140502455","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
COMPARATIVE ANALYSIS OF COSTS AND TIMES OF RED BRICK AND LIGHT BRICK WORK ON THE MADRASAH MALLIMIN MUALLIMAT TAMBAK BERAS JOMBANG BUILDING PROJECT MALLIMIN MUALLIMAT TAMBAK BERAS JOMBANG 建筑项目红砖和轻质砖工程成本和工期的比较分析
Anindya Novita Sari, W. Oetomo, Risma Marleno
{"title":"COMPARATIVE ANALYSIS OF COSTS AND TIMES OF RED BRICK AND LIGHT BRICK WORK ON THE MADRASAH MALLIMIN MUALLIMAT TAMBAK BERAS JOMBANG BUILDING PROJECT","authors":"Anindya Novita Sari, W. Oetomo, Risma Marleno","doi":"10.55047/ijateis.v3i1.997","DOIUrl":"https://doi.org/10.55047/ijateis.v3i1.997","url":null,"abstract":"The problem in implementing the construction of the Madrasah Muallimin Muallimat Tambak Beras Jombang Building is that the available funds and time are limited. The approach regarding the material needed for this building work is light brick compared to other work items. In wall masonry work using light brick/hebel, it is necessary to analyze whether the work time can be faster and whether the price comparison obtained is cheaper. The research method used is Value Engineering analysis to produce cost savings. The results of this research include: a) Based on the results of cost and time analysis for wall items, namely by proposing alternative materials as replacements for the initial materials, resulting in cost savings of Rp. 28,298,995.61, and b) When compared with productivity, a builder is able to complete a red brick wall in 133 days, whereas with light brick wall material a builder is able to complete the work in 66 days. So, in terms of work speed, lightweight bricks are faster than red brick walls.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"82 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140502647","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信