{"title":"采用碰撞法对蓬蒂亚纳克快餐店建筑项目进行成本和时间分析","authors":"Oskar Ezra Alan Muin, H. T. Tjendani, Budi Witjaksana","doi":"10.55047/ijateis.v3i1.1046","DOIUrl":null,"url":null,"abstract":"The construction project of the McD Pontianak building encountered significant challenges due to a tight schedule of 110 calendar days and unforeseen delays arising from the existing building's foundation. These delays led to a setback in the construction progress, prompting the need for strategic measures to accelerate the project and mitigate the delays amounting to 11.48%, equivalent to 12.63 days. The potential financial consequences of this delay were estimated at IDR 228,366,605. In order to expedite the construction process, the chosen acceleration method was the crashing method, involving an increase in overtime ranging from 1 to 4 working hours, in accordance with relevant laws and regulations. This required a comprehensive analysis encompassing normal cost, normal duration, critical path, productivity, crashing cost, and crashing duration calculations. Upon thorough examination, it was determined that the optimal solution to overcome the delays was to implement an additional 2 hours of overtime. However, this decision came with associated costs, resulting in a necessary expenditure of IDR 93,651,965 to achieve a crashing time of 18.30 days. Despite the increased financial commitment, this strategic approach was deemed essential to meet the project's original schedule and avoid potential penalties. The findings and conclusions drawn from this analysis provide valuable insights into effective project management and decision-making in the face of unexpected challenges in the construction industry.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"95 3","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD\",\"authors\":\"Oskar Ezra Alan Muin, H. T. Tjendani, Budi Witjaksana\",\"doi\":\"10.55047/ijateis.v3i1.1046\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction project of the McD Pontianak building encountered significant challenges due to a tight schedule of 110 calendar days and unforeseen delays arising from the existing building's foundation. These delays led to a setback in the construction progress, prompting the need for strategic measures to accelerate the project and mitigate the delays amounting to 11.48%, equivalent to 12.63 days. The potential financial consequences of this delay were estimated at IDR 228,366,605. In order to expedite the construction process, the chosen acceleration method was the crashing method, involving an increase in overtime ranging from 1 to 4 working hours, in accordance with relevant laws and regulations. This required a comprehensive analysis encompassing normal cost, normal duration, critical path, productivity, crashing cost, and crashing duration calculations. Upon thorough examination, it was determined that the optimal solution to overcome the delays was to implement an additional 2 hours of overtime. However, this decision came with associated costs, resulting in a necessary expenditure of IDR 93,651,965 to achieve a crashing time of 18.30 days. Despite the increased financial commitment, this strategic approach was deemed essential to meet the project's original schedule and avoid potential penalties. The findings and conclusions drawn from this analysis provide valuable insights into effective project management and decision-making in the face of unexpected challenges in the construction industry.\",\"PeriodicalId\":188915,\"journal\":{\"name\":\"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)\",\"volume\":\"95 3\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55047/ijateis.v3i1.1046\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55047/ijateis.v3i1.1046","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

坤甸麦克唐纳大楼的施工项目遇到了重大挑战,因为工期紧,只有 110 个日历日,而且现有大楼的地基也出现了不可预见的延误。这些延误导致施工进度倒退,因此需要采取战略措施加快项目进度,减少 11.48% 的延误,相当于 12.63 天。这一延误造成的潜在财务后果估计为 228,366,605 印尼盾。为了加快施工进度,根据相关法律法规,选择的加速方法是挤压法,包括增加 1 至 4 个工作小时的加班时间。这就需要进行全面分析,包括正常成本、正常工期、关键路径、生产率、撞车成本和撞车工期的计算。经过深入研究,确定克服延误的最佳解决方案是增加 2 小时的加班时间。然而,这一决定带来了相关费用,为实现 18.30 天的碰撞时间,必须支出 93 651 965 印尼盾。尽管增加了资金投入,但这一战略方法被认为是实现项目原定进度和避免潜在罚款所必 需的。本分析报告的结果和结论为建筑行业在面对意外挑战时进行有效的项目管理和决策提供了宝贵的见解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
COST AND TIME ANALYSIS OF THE FAST FOOD RESTAURANT BUILDING CONSTRUCTION PROJECT IN PONTIANAK USING CRASHING METHOD
The construction project of the McD Pontianak building encountered significant challenges due to a tight schedule of 110 calendar days and unforeseen delays arising from the existing building's foundation. These delays led to a setback in the construction progress, prompting the need for strategic measures to accelerate the project and mitigate the delays amounting to 11.48%, equivalent to 12.63 days. The potential financial consequences of this delay were estimated at IDR 228,366,605. In order to expedite the construction process, the chosen acceleration method was the crashing method, involving an increase in overtime ranging from 1 to 4 working hours, in accordance with relevant laws and regulations. This required a comprehensive analysis encompassing normal cost, normal duration, critical path, productivity, crashing cost, and crashing duration calculations. Upon thorough examination, it was determined that the optimal solution to overcome the delays was to implement an additional 2 hours of overtime. However, this decision came with associated costs, resulting in a necessary expenditure of IDR 93,651,965 to achieve a crashing time of 18.30 days. Despite the increased financial commitment, this strategic approach was deemed essential to meet the project's original schedule and avoid potential penalties. The findings and conclusions drawn from this analysis provide valuable insights into effective project management and decision-making in the face of unexpected challenges in the construction industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信