采用时间成本折中法对 SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG - GITET LAMPUNG 1 的采购进行时间和成本分析

Ijaz Adam, Budi Witjaksana, H. T. Tjendani
{"title":"采用时间成本折中法对 SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG - GITET LAMPUNG 1 的采购进行时间和成本分析","authors":"Ijaz Adam, Budi Witjaksana, H. T. Tjendani","doi":"10.55047/ijateis.v3i1.992","DOIUrl":null,"url":null,"abstract":"Indonesia as an archipelago state is still need an equality development with the intention in achieving the goals to fulfill the requirement of structure and infrastructure. The economy that has experiencing growth, it can be seen with the rising of the demand for supply of electricity power whether it is coming from domestic moreover from industrial usages. Lampung Province, as one of the regions which is in a continuation to develop, requires the support of electric power, which at its peak load reaches 1200 MW, while the capacity of the existing power plant can only produce 700 MW, therefore the construction of a 275 kV Gumawang-Lampung 1 SUTET interconnection network with a capacity of up to 2000 MW was established to meet these requirements. Based on the time schedule which noted that the duration of foundation work started with the excavation, concreting until the reaches of it's curing time in 28 days is 42 days in 2023 December 13th is on try to speed up can be curing in 2023 December 8th, so the schedule tower installation in 2023 December 9th will be on time. Due to this delay, the researcher intends to carry out an acceleration analysis starting with preparing a network diagram using the Microsoft Project software, followed by the crashing process by adding groups of workers and tools of any activities on the critical path. The next step is to calculate the crash cost and cost slope values using the time cost trade off (TCTO) method.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"437 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD\",\"authors\":\"Ijaz Adam, Budi Witjaksana, H. T. Tjendani\",\"doi\":\"10.55047/ijateis.v3i1.992\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Indonesia as an archipelago state is still need an equality development with the intention in achieving the goals to fulfill the requirement of structure and infrastructure. The economy that has experiencing growth, it can be seen with the rising of the demand for supply of electricity power whether it is coming from domestic moreover from industrial usages. Lampung Province, as one of the regions which is in a continuation to develop, requires the support of electric power, which at its peak load reaches 1200 MW, while the capacity of the existing power plant can only produce 700 MW, therefore the construction of a 275 kV Gumawang-Lampung 1 SUTET interconnection network with a capacity of up to 2000 MW was established to meet these requirements. Based on the time schedule which noted that the duration of foundation work started with the excavation, concreting until the reaches of it's curing time in 28 days is 42 days in 2023 December 13th is on try to speed up can be curing in 2023 December 8th, so the schedule tower installation in 2023 December 9th will be on time. Due to this delay, the researcher intends to carry out an acceleration analysis starting with preparing a network diagram using the Microsoft Project software, followed by the crashing process by adding groups of workers and tools of any activities on the critical path. The next step is to calculate the crash cost and cost slope values using the time cost trade off (TCTO) method.\",\"PeriodicalId\":188915,\"journal\":{\"name\":\"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)\",\"volume\":\"437 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2024-01-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55047/ijateis.v3i1.992\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55047/ijateis.v3i1.992","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

作为一个群岛国家,印尼仍然需要平等发展,以实现满足结构和基础设施要求的目标。随着经济的增长,对电力供应的需求也在不断增加,无论是家庭用电还是工业用电。楠榜省作为继续发展的地区之一,需要电力的支持,其最高负荷可达 1200 兆瓦,而现有发电厂的发电能力仅为 700 兆瓦,因此,为满足这些需求,需要建设 275 千伏古马旺-楠榜 1 SUTET 互联网络,其发电能力可达 2000 兆瓦。根据时间进度表,地基工程从开挖、混凝土浇筑到达到 28 天固化时间的持续时间为 42 天,即 2023 年 12 月 13 日,为加快固化速度,可在 2023 年 12 月 8 日进行固化,因此,2023 年 12 月 9 日的铁塔安装进度将按时完成。由于这一延迟,研究人员打算进行加速分析,首先使用 Microsoft Project 软件编制网络图,然后通过添加关键路径上任何活动的工人组和工具来进行碰撞过程。下一步是使用时间成本权衡法(TCTO)计算碰撞成本和成本斜率值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD
Indonesia as an archipelago state is still need an equality development with the intention in achieving the goals to fulfill the requirement of structure and infrastructure. The economy that has experiencing growth, it can be seen with the rising of the demand for supply of electricity power whether it is coming from domestic moreover from industrial usages. Lampung Province, as one of the regions which is in a continuation to develop, requires the support of electric power, which at its peak load reaches 1200 MW, while the capacity of the existing power plant can only produce 700 MW, therefore the construction of a 275 kV Gumawang-Lampung 1 SUTET interconnection network with a capacity of up to 2000 MW was established to meet these requirements. Based on the time schedule which noted that the duration of foundation work started with the excavation, concreting until the reaches of it's curing time in 28 days is 42 days in 2023 December 13th is on try to speed up can be curing in 2023 December 8th, so the schedule tower installation in 2023 December 9th will be on time. Due to this delay, the researcher intends to carry out an acceleration analysis starting with preparing a network diagram using the Microsoft Project software, followed by the crashing process by adding groups of workers and tools of any activities on the critical path. The next step is to calculate the crash cost and cost slope values using the time cost trade off (TCTO) method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信