{"title":"PLANNING FOR IMPROVEMENT OF KRIAN ROAD -KEMANGSEN","authors":"D. Purnomo, W. Oetomo, Haris Muhammadun","doi":"10.55047/ijateis.v1i4.466","DOIUrl":"https://doi.org/10.55047/ijateis.v1i4.466","url":null,"abstract":"Pavement improvement on Kemangsen road is necessary to repair the old concrete pavement, which is corrugated/subside so that it hinders the movement of passengers and goods. Therefore, the improvement of road pavement must comply with predetermined standards. The general objective of the Road Pavement Improvement activity on the Kemangsen road section is to make a technical road plan that follows the heavy vehicle traffic that passes through the road section. The specific objective of the Road Pavement Improvement activity on the Kemangsen road section is to analyze the structure of the old concrete pavement and to plan for field survey-type road pavement improvements to be carried out in this Preliminary Survey is a visual inspection. The Krian–Kemangsen Road was the location where the study took place. Traffic analysis is very decisive in obtaining the optimal corridor and the priority for implementing its development. Land use in the planned alignment area is strongly influenced by the development of the surrounding area, which is expected to develop into a residential area. The consultant will carefully investigate the physical condition of the land because it greatly influences the implementation aspects of Road construction. The selection of construction methods and types of construction is expected to support and follow the natural characteristics around the location of the development plan so that the planning is more economical and environmentally friendly.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"42 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133961565","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Achmad Lukmanul Khakimin, Budi Witjaksana, H. T. Tjendani
{"title":"ROUTINE MAINTENANCE PLANNING CONSULTANCY FOR PANGKAH KULON - BOOLO ROAD, LOCATION: UJUNGPANGKAH DISTRICT, GRESIK REGENCY","authors":"Achmad Lukmanul Khakimin, Budi Witjaksana, H. T. Tjendani","doi":"10.55047/ijateis.v1i4.479","DOIUrl":"https://doi.org/10.55047/ijateis.v1i4.479","url":null,"abstract":"Road infrastructure is the lifeblood of a region's economy because it connects and increases the movement of people and goods. Traffic jams in the city of Gresik fall into the severe category. This is evidenced by the long queues of vehicles and the time it takes to decompose traffic jams for hours. The Gresik Regency Government, through the Highways Public Works and Water Resources Office, needs to carry out systematic and appropriate planning to overcome the above problems. Maintenance is carried out by preparation, topographic survey, traffic survey, and then the calculation of the pavement plan. From the analysis results obtained CBR subgrade = 3%; DDT = 4; IP = 2.5; FR = 1.0; LER = 2.18; ITP = 9.5; Ipo = 3.9 – 3.5. After the calculations, we obtained a 10 cm asphalt surface layer (4 cm ACWC, 6 cm ACBC) and 20 cm CTB fill for leveling.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"190 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125796813","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"STUDY OF DRAINAGE, PANORAMIC HOUSING, CEMENGKALANG VILLAGE, SIDOARJO DISTRICT","authors":"Ikko Bagus Ismanto, L. D. Nugroho, W. Oetomo","doi":"10.55047/ijateis.v1i3.458","DOIUrl":"https://doi.org/10.55047/ijateis.v1i3.458","url":null,"abstract":"Panorama Residence housing which has an area of 8000 m2 is located in a plain area with a slope of about 0-1%. The survey results on the Panorama Residence Housing, Cemengkalang Village, Sidoarjo District, have an elevation of -0.20 m, slightly above the flood level – 0.30 m. This area has a high probability of flooding due to overflow from the Pucang River, which runs off (run-off water) from other areas if it rains with high intensity. Moreover, the Panorama Residence area is a dense residential area with roads and parking lots, so rainwater has a smaller chance of infiltrating and running off. After analysis, The flood discharge at the 25-year return period on the Pucang River was 72,561 m3/sec. At the same time, the cross-sectional capacity of the Pucang River was 64,402 m3/sec, so the cross-section of the Pucang River at the Panorama Residence Housing location experienced overflow. The run-off volume is 102.6 m3, while the total capacity is 565.68 m3, so the extended storage capacity is quite adequate. In rainy conditions, t = 30 minutes, the run-off volume that occurs = 30.96 m3, and the total channel length = 493.12 m, the total drainage channel capacity = 184.92 m3 is greater than the run-off volume, 30.96 m3.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"231 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116679543","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"DRAINAGE STUDY OF WAREHOUSE DEVELOPMENT PT. ANEKA INDUSTRI, SIDOARJO DISTRICT","authors":"Ikko Bagus Ismanto, L. D. Nugroho, W. Oetomo","doi":"10.55047/ijateis.v1i4.459","DOIUrl":"https://doi.org/10.55047/ijateis.v1i4.459","url":null,"abstract":"The PT. Aneka Industri warehouse is located on a level with a slope of approximately 0-1%. Survey results from PT. Aneka Industri Warehouse in Tambaksawah Village, Waru District, Sidoarjo Regency, showed a height of -0.20m, slightly above the flood level of -0.10m. The area is likely to flood due to the overflow of Afvoer Bunung, which flows out from other areas (runoff water) during heavy rains. In addition, the storage area is a dense industrial area, and the chance of rainwater infiltration and loss is small. According to the analysis, the flood discharge of Afvoer Buntung during the 25-year return period is 193,305 m3/s. Meanwhile, the cross-sectional capacity of Afvoer Buntung is 25.707 m3/s, so the cross-section of Afvoer Buntung at the storage site of PT. Aneka Industri is flooded. It rains for t = 30 minutes, total volume = 297.57 m3.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127154230","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"THE ANALYSIS OF CONTRACTOR SELECTION PRIORITY DETERMINATION FOR THE LONG SEMAMU – LONG BAWAN 2 ROAD CONTRUCTION PROJECT, NORTH KALIMANTAN","authors":"Coki Adianta Nugraha, W. Oetomo, Haris Muhammadun","doi":"10.55047/ijateis.v1i4.460","DOIUrl":"https://doi.org/10.55047/ijateis.v1i4.460","url":null,"abstract":"Road construction is one of the fulfillment of the government's duties in providing mobility facilities for people's land transportation to move from one place to another. The government, through contractors as road construction implementers, must work carefully, so it is important for the government to select road construction contractors who meet predetermined criteria so that the road construction process can take place optimally. This study aims to find priority criteria and alternative contractors in the process of selecting Long Semamu – Long Bawan Road Construction Contractors. This study uses a quantitative descriptive approach with the aim of determining the Criteria and Alternative Variables. The population of this study were employees of the Public Works Department as the Tender Team for the Selection of Road Construction Contractors as many as 32 people with the research sample being the total population. Data collection techniques were carried out by distributing questionnaires and interviews. Data analysis techniques for research aids use the AHP method with AHP data processing software (Expert Choice version 11). The results of the study prove that the Price Criteria is a priority criterion in the selection of road construction contractors. In addition, Contractor C is an alternative priority in road construction.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"85 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126233532","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANALYSIS OF THE INFLUENCE AND RELATIONSHIP OF THE EFFECT OF PERFORMANCE FACTORS ON THE QUALITY PERFORMANCE OF SUPERVISORY CONSULTANTS","authors":"Mayogo Setyo, Haris Muhammadun, W. Oetomo","doi":"10.55047/ijateis.v1i4.472","DOIUrl":"https://doi.org/10.55047/ijateis.v1i4.472","url":null,"abstract":"Roads are the main means for the community to mobilize to carry out their respective activities. With the vital function of roads, it is important for roads to carry out regular road maintenance. Road maintenance carried out must also be of good quality so that road functions can continue to be used properly and have a durable condition. This study aims to analyze the influence and relationship of Influence factors on the Quality Performance of Supervisory Consultants. The research population was 75 Road Maintenance Supervisory Consultants with a total sample of the entire population. The research data collection technique used a questionnaire. The analytical technique chosen to analyze the data and test the hypothesis in this study used Partial Least Square (PLS). The results indicate that Human Resources and Work Execution Methods have no significant effect on the Quality Performance of Supervisory Consultants. Meanwhile, understanding of technical, environmental and managerial specifications has a significant effect on the Quality Performance of the Supervisory Consultant.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"63 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130815727","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"STUDY OF THE CAUSES OF ROAD DAMAGE TO CAPTAIN HARUN TOHIR STREET, GRESIK EAST JAVA","authors":"A. Ramadhani, Haris Muhammadun, W. Oetomo","doi":"10.55047/ijateis.v1i3.457","DOIUrl":"https://doi.org/10.55047/ijateis.v1i3.457","url":null,"abstract":"This study aims to make a study and technical planning of the road following the traffic of heavy vehicle loads through the Harun Tohir road. Road maintenance is an activity to maintain, repair, add or replace existing physical buildings so that their functions can be maintained or enhanced for a longer period. This maintenance guideline is intended to regulate the procedures for carrying out rigid pavement maintenance activities, and maintain stable serviceability conditions, to provide safety and comfort to road users. This guideline for the maintenance of rigid pavements includes descriptions of the types of damage that commonly occur in rigid pavements, their possible causes, follow-up consequences, recommendations for handling, and methods.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125489144","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANALYSIS OF FACTORS CAUSED FOR DELAYING CONSTRUCTION ROAD REHABILITATION AND MAINTENANCE IN KEJAYAN PURWOSARI’S (LINK 197) PROJECT DUE TO COVID-19 PANDEMIC","authors":"A. Ramadhani, Haris Muhammadun, W. Oetomo","doi":"10.55047/ijateis.v1i3.427","DOIUrl":"https://doi.org/10.55047/ijateis.v1i3.427","url":null,"abstract":"Implementation of Construction Projects that run within a limited time must be removed from the factors that cause project delays to run optimally and appropriately. This study aims to analyze the factors causing delays in road rehabilitation and maintenance in Kejayan Purwosari (Link 197) construction projects due to the Covid-19 pandemic. The study population consist of 80 people and the number of research samples is the total population. The data collection technique is done by distributing questionnaires. Techniques for analyzing research data using Partial Least Square (PLS). The results of the study prove that the factors of Manpower, Materials and Equipment have no significant effect on Project Delay. Meanwhile, the factors of Construction Method, Relationship and Time and Control have a significant effect on Project Delay.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125620888","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Medio Duddian Wahyu Rahman, W. Oetomo, L. D. Nugroho
{"title":"ANALYSIS OF THE EFFECT OF SUPERVISORY CONSULTANT PERFORMANCE FACTORS ON THE CONSTRUCTION OF THE TRANS STUDIO BUILDING SURABAYA","authors":"Medio Duddian Wahyu Rahman, W. Oetomo, L. D. Nugroho","doi":"10.55047/ijateis.v1i3.408","DOIUrl":"https://doi.org/10.55047/ijateis.v1i3.408","url":null,"abstract":"This study aims to determine impact of Understanding Contract Documents, Understanding of Technical Specifications, Use of Materials, Use of Labor, and Use of Equipment on the performance of supervisory consultants. This research conducted with a quantitative method. The sources of data using primary data from interviews. The research population is 70 Consultants for the Construction Project of the Trans Studi Surabaya Building with the sample being the entire population. The data analysis technique using PLS program. The results found that understanding of contract documents and technical specifications has a positive significant impact on the performance of the Supervisory Consultant. Meanwhile, the use of materials, labor and equipment has a positive significant impact on the performance of the Supervisory Consultant.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132214158","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"DECISION SUPPORT SYSTEM FOR SELECTING THE BEST TEACHER BASED ON PERFORMANCE APPRAISAL AT SMPIT AS SU'ADAA USING THE SIMPLE ADDITIVE WEIGHTING (SAW) METHOD","authors":"Ulfasari, Arif Ismail Husin","doi":"10.55047/ijateis.v1i2.372","DOIUrl":"https://doi.org/10.55047/ijateis.v1i2.372","url":null,"abstract":"One of the efforts in improving the quality of human resources is to measure the performance of a teacher through a teacher selection. One of the information systems needed is a decision support system for selecting the best teacher. This is needed because the Principal and the Curriculum Section in the process of assessing teacher performance and determining the results of the best teacher selection decisions still use manual methods and do not have a decision support system and there is no appropriate method in selecting the best teachers. This research aims to create a decision support system with the Simple Additive Weighting (SAW) method, and create a MySQL database to store all data. The selection of the best teacher is determined by summing up the results of the assessment of existing criteria with predetermined weight. The results will be ranked according to the calculations in the Simple Additive Weighting (SAW) method. By applying the basic additive weighting method, design systems support principals and the curriculum department in identifying the most effective teachers based on measurable, objective performance indicators.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116434992","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}