北加里曼丹长semamu - long baawan 2公路建设项目承包商选择优先级确定分析

Coki Adianta Nugraha, W. Oetomo, Haris Muhammadun
{"title":"北加里曼丹长semamu - long baawan 2公路建设项目承包商选择优先级确定分析","authors":"Coki Adianta Nugraha, W. Oetomo, Haris Muhammadun","doi":"10.55047/ijateis.v1i4.460","DOIUrl":null,"url":null,"abstract":"Road construction is one of the fulfillment of the government's duties in providing mobility facilities for people's land transportation to move from one place to another. The government, through contractors as road construction implementers, must work carefully, so it is important for the government to select road construction contractors who meet predetermined criteria so that the road construction process can take place optimally. This study aims to find priority criteria and alternative contractors in the process of selecting Long Semamu – Long Bawan Road Construction Contractors. This study uses a quantitative descriptive approach with the aim of determining the Criteria and Alternative Variables. The population of this study were employees of the Public Works Department as the Tender Team for the Selection of Road Construction Contractors as many as 32 people with the research sample being the total population. Data collection techniques were carried out by distributing questionnaires and interviews. Data analysis techniques for research aids use the AHP method with AHP data processing software (Expert Choice version 11). The results of the study prove that the Price Criteria is a priority criterion in the selection of road construction contractors. In addition, Contractor C is an alternative priority in road construction.","PeriodicalId":188915,"journal":{"name":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","volume":"85 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"THE ANALYSIS OF CONTRACTOR SELECTION PRIORITY DETERMINATION FOR THE LONG SEMAMU – LONG BAWAN 2 ROAD CONTRUCTION PROJECT, NORTH KALIMANTAN\",\"authors\":\"Coki Adianta Nugraha, W. Oetomo, Haris Muhammadun\",\"doi\":\"10.55047/ijateis.v1i4.460\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Road construction is one of the fulfillment of the government's duties in providing mobility facilities for people's land transportation to move from one place to another. The government, through contractors as road construction implementers, must work carefully, so it is important for the government to select road construction contractors who meet predetermined criteria so that the road construction process can take place optimally. This study aims to find priority criteria and alternative contractors in the process of selecting Long Semamu – Long Bawan Road Construction Contractors. This study uses a quantitative descriptive approach with the aim of determining the Criteria and Alternative Variables. The population of this study were employees of the Public Works Department as the Tender Team for the Selection of Road Construction Contractors as many as 32 people with the research sample being the total population. Data collection techniques were carried out by distributing questionnaires and interviews. Data analysis techniques for research aids use the AHP method with AHP data processing software (Expert Choice version 11). The results of the study prove that the Price Criteria is a priority criterion in the selection of road construction contractors. In addition, Contractor C is an alternative priority in road construction.\",\"PeriodicalId\":188915,\"journal\":{\"name\":\"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)\",\"volume\":\"85 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55047/ijateis.v1i4.460\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM (IJATEIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55047/ijateis.v1i4.460","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

道路建设是履行政府职责的一种方式,为人们的陆地交通从一个地方移动到另一个地方提供流动设施。政府,通过承包商作为道路建设的实施者,必须认真工作,因此,政府选择符合预定标准的道路建设承包商,使道路建设过程能够进行优化,这一点很重要。本研究旨在找出龙士木-龙巴湾公路工程承建商选择的优先标准和备选承建商。本研究采用定量描述方法,目的是确定标准和替代变量。本研究的研究对象为工务署道路工程承建商甄选招标队伍的32名雇员,研究样本为总人数。数据收集技术是通过分发问卷和访谈进行的。研究辅助的数据分析技术使用AHP方法和AHP数据处理软件(Expert Choice version 11)。研究结果表明,价格标准是道路施工承包商选择的优先标准。此外,承包商C是道路建设的另一个优先选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
THE ANALYSIS OF CONTRACTOR SELECTION PRIORITY DETERMINATION FOR THE LONG SEMAMU – LONG BAWAN 2 ROAD CONTRUCTION PROJECT, NORTH KALIMANTAN
Road construction is one of the fulfillment of the government's duties in providing mobility facilities for people's land transportation to move from one place to another. The government, through contractors as road construction implementers, must work carefully, so it is important for the government to select road construction contractors who meet predetermined criteria so that the road construction process can take place optimally. This study aims to find priority criteria and alternative contractors in the process of selecting Long Semamu – Long Bawan Road Construction Contractors. This study uses a quantitative descriptive approach with the aim of determining the Criteria and Alternative Variables. The population of this study were employees of the Public Works Department as the Tender Team for the Selection of Road Construction Contractors as many as 32 people with the research sample being the total population. Data collection techniques were carried out by distributing questionnaires and interviews. Data analysis techniques for research aids use the AHP method with AHP data processing software (Expert Choice version 11). The results of the study prove that the Price Criteria is a priority criterion in the selection of road construction contractors. In addition, Contractor C is an alternative priority in road construction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信