Journal of Project Management最新文献

筛选
英文 中文
Bibliometric evaluation of research on political risks in construction projects 建设项目政治风险研究的文献计量评价
IF 1.7
Journal of Project Management Pub Date : 2021-01-01 DOI: 10.5267/J.JPM.2021.5.003
Chunling Wei, Xiaopeng Deng, Tengyuan Chang, A. Mahmoudi, Safi Ullah
{"title":"Bibliometric evaluation of research on political risks in construction projects","authors":"Chunling Wei, Xiaopeng Deng, Tengyuan Chang, A. Mahmoudi, Safi Ullah","doi":"10.5267/J.JPM.2021.5.003","DOIUrl":"https://doi.org/10.5267/J.JPM.2021.5.003","url":null,"abstract":"The current study aims to provide an overview of the research on political risk using the Web of Science(WoS)database as well as summarize research results and put forward some suggestions for research directions of political risk in international construction projects. It is the first time scientometric analysis of political risk research is executed. In this regard, the papers related to political risk in the WoS database have been retrieved and the literature is sorted out by visual and content analysis methods. Visual analysis is used to analyze the research overview, knowledge base, and research hotspots of this field. The content analysis method is adopted to expound the current research focus from three perspectives inducing the influence of political risk, risk assessment, and risk management measures. The results show that in the political risk context, the number of publications has experienced an increasing trend in recent years. Based on the existing literature on political risk for all companies, this overview provides some suggestions to address the political risk in international construction projects in the future. The results contribute to the scholars understanding of the research overview, research hotspots, and future research directions of political risk research in construction projects.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780926","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Risk management and risk management performance measurement in the construction projects of Finland 芬兰建设项目风险管理与风险管理绩效评估
IF 1.7
Journal of Project Management Pub Date : 2020-01-01 DOI: 10.5267/j.jpm.2020.5.001
M. Rahman, T. Adnan
{"title":"Risk management and risk management performance measurement in the construction projects of Finland","authors":"M. Rahman, T. Adnan","doi":"10.5267/j.jpm.2020.5.001","DOIUrl":"https://doi.org/10.5267/j.jpm.2020.5.001","url":null,"abstract":"Distinguishing and diminishing risks in today’s projects are crucial for project success. Al- most every project is facing several risks throughout the project timeline. Construction projects in Finland are also facing project risks due to the complexity of the project. To minimize the impact of risks, an effective risk management approach must be incorporated into every project which also includes the effectiveness and measurement of its performance. Managing the risks is an important job but measuring the RM performance is crucial. Thus, the objective of this study is to analyze the risk management (RM) and risk management performance measurement (RMPM) through an in-depth empirical analysis of two complex construction projects of Finland. To achieve the objective, a qualitative case study is followed by the authors of this article to identify the RM processes, major and minor risks of the projects, RM strategies to mitigate them and RM performance measurement strategies. Overall, this article provides a comparative analysis of RM and RMPM for construction projects and it can be used as a basis for further research into RM perspective in complex construction projects.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/j.jpm.2020.5.001","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70781164","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
An application of fuzzy BWM for risk assessment in offshore oil projects 模糊BWM在海上石油工程风险评估中的应用
IF 1.7
Journal of Project Management Pub Date : 2019-01-01 DOI: 10.5267/J.JPM.2019.3.001
R. Ketabchi, M. Ghaeli
{"title":"An application of fuzzy BWM for risk assessment in offshore oil projects","authors":"R. Ketabchi, M. Ghaeli","doi":"10.5267/J.JPM.2019.3.001","DOIUrl":"https://doi.org/10.5267/J.JPM.2019.3.001","url":null,"abstract":"Article history: Received: November 28 2018 Received in revised format: December 25 2018 Accepted: March 1 2019 Available online: March 1 2019 The purpose of this paper is to examine the existing risks for the offshore project and risk weighting using the fuzzy best worst method (FBWM). In offshore oil projects, we face six major risks. Each of these risks is divided into smaller risks leaving us to have a total of 34 risks. Some of these risks are internal and some are external risks. In this method, first, the experts of this field determined the best and the worst type of risk. Then, using the experts’ opinions, the study compared the remaining risks with the two selected risks and the other weights are determined. In our survey, “Technical Risk and Project Execution” is the most important risk factor followed by “Political Risk and Sanctions”, “Market risk”, “Management risk”, “Financial risk and currency fluctuations” and “Environmental risk”. © 2019 by the authors; licensee Growing Science, Canada.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.3.001","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780385","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
A hybrid of Delphi, AHP and TOPSIS Methods for project portfolio management 项目组合管理的Delphi、AHP和TOPSIS混合方法
IF 1.7
Journal of Project Management Pub Date : 2019-01-01 DOI: 10.5267/j.jpm.2019.1.004
Ahmad Borjy, V. Baradaran, Peyman Zandi, Milad Taheri
{"title":"A hybrid of Delphi, AHP and TOPSIS Methods for project portfolio management","authors":"Ahmad Borjy, V. Baradaran, Peyman Zandi, Milad Taheri","doi":"10.5267/j.jpm.2019.1.004","DOIUrl":"https://doi.org/10.5267/j.jpm.2019.1.004","url":null,"abstract":"Article history: Received: October 2 2018 Received in revised format: November 19 2018 Accepted: January 1","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/j.jpm.2019.1.004","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780629","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
A new methodology in generating Digital Plants in AVEVA PDMS from Navisworks® model 从Navisworks®模型在AVEVA PDMS中生成数字植物的新方法
IF 1.7
Journal of Project Management Pub Date : 2019-01-01 DOI: 10.5267/J.JPM.2019.6.002
Reyhaneh Nasirifar, Shahram Shafeghati, Iman Valipour
{"title":"A new methodology in generating Digital Plants in AVEVA PDMS from Navisworks® model","authors":"Reyhaneh Nasirifar, Shahram Shafeghati, Iman Valipour","doi":"10.5267/J.JPM.2019.6.002","DOIUrl":"https://doi.org/10.5267/J.JPM.2019.6.002","url":null,"abstract":"","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.6.002","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70781013","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
A scientometrics survey on project scheduling 项目进度的科学计量学调查
IF 1.7
Journal of Project Management Pub Date : 2019-01-01 DOI: 10.5267/J.JPM.2019.1.006
M. Ghaeli, S. Sadi-Nezhad
{"title":"A scientometrics survey on project scheduling","authors":"M. Ghaeli, S. Sadi-Nezhad","doi":"10.5267/J.JPM.2019.1.006","DOIUrl":"https://doi.org/10.5267/J.JPM.2019.1.006","url":null,"abstract":"Article history: Received: October 28 2018 Received in revised format: November 25 2018 Accepted: January 23 2019 Available online: January 23 2019 In project management, a schedule is considered as a list a project's milestones, activities, and deliverables, normally with some start and finish time schedule, which are estimated by some information incorporated in the project schedule including resource allocation, budget, task duration, and linkages of dependencies and scheduled events. This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Scopus database as a primary search engine and covers 3370 records over the period 1963-2019. The records are statistically analyzed and categorized in terms of different criteria. Based on the survey, \"decision support systems\" is the keyword which has carried the highest densities followed by heuristics methods. Among the most cited articles, papers published by researchers in Germany have received the highest citations (9084), followed by United States (7058) and Belgium with 4853 citations.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.1.006","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780690","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Project scheduling and forecasting by laws of physical movement 根据物理运动规律进行项目调度和预测
IF 1.7
Journal of Project Management Pub Date : 2019-01-01 DOI: 10.5267/j.jpm.2019.1.001
M. Bagherpour, Hamidreza Mardimamaqani, Amirhossein Fallahdizcheh, H. Steyn
{"title":"Project scheduling and forecasting by laws of physical movement","authors":"M. Bagherpour, Hamidreza Mardimamaqani, Amirhossein Fallahdizcheh, H. Steyn","doi":"10.5267/j.jpm.2019.1.001","DOIUrl":"https://doi.org/10.5267/j.jpm.2019.1.001","url":null,"abstract":"Article history: Received: October 24 2018 Received in revised format: November 15 2018 Accepted: January 2 2019 Available online: January 4 2019 Measuring actual project progress and comparing it with the planned time schedule is essential in controlling of a project. The outcome of the latter follows the s-curve diagram, which compares actual progress with the planned amount and finally analyzing any gap between them to draw directions for project scheduling. However, final duration of the project cannot be either estimated or predicted through conventional methods. The new method, using Rules of kinematics, can calculate the final duration of the project. This novel approach is successfully implemented on a construction project. The first objective in new method is forecasting final duration of the project, finding equation path and draw a new s-curve diagram for actual status during the execution process. The second objective is to evaluate schedule performance of the project and report the status of the project at each period which is a useful tool for managers. © 2019 by the authors; licensee Growing Science, Canada.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/j.jpm.2019.1.001","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70779983","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
A dynamic programming approach for resource allocation in oil and gas industry 油气行业资源配置的动态规划方法
IF 1.7
Journal of Project Management Pub Date : 2019-01-01 DOI: 10.5267/J.JPM.2019.3.004
M. Ghaeli
{"title":"A dynamic programming approach for resource allocation in oil and gas industry","authors":"M. Ghaeli","doi":"10.5267/J.JPM.2019.3.004","DOIUrl":"https://doi.org/10.5267/J.JPM.2019.3.004","url":null,"abstract":"","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.3.004","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780542","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources 基于遗传算法的多模式资源约束调度问题
IF 1.7
Journal of Project Management Pub Date : 2019-01-01 DOI: 10.5267/j.jpm.2019.3.005
Aidin Delgoshaei, Sepehr Esmaeili Hanjani, Amirhasan Nasiri
{"title":"A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources","authors":"Aidin Delgoshaei, Sepehr Esmaeili Hanjani, Amirhasan Nasiri","doi":"10.5267/j.jpm.2019.3.005","DOIUrl":"https://doi.org/10.5267/j.jpm.2019.3.005","url":null,"abstract":"Article history: Received: January 8 2019 Received in revised format: January 27 2019 Accepted: March 19 2019 Available online: March 19 2019 In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF). The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in backward mode. For this purpose, a Genetic Algorithm is applied to solve experimental cases with 50 variables and the results are compared with forward serial programming method. The remarkable results reveal that the backward approach is an effective way to maximize NPV in MRCPSP-DC while activity splitting is allowed. The algorithm is flexible enough to be used in real project. © 2019 by the authors; licensee Growing Science, Canada.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/j.jpm.2019.3.005","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70780605","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Multi objective project portfolio selection 多目标项目组合选择
IF 1.7
Journal of Project Management Pub Date : 2019-01-01 DOI: 10.5267/J.JPM.2019.6.003
Kamal Baqeri, Emran Mohammadi, Mahsa Mofrad Gilani
{"title":"Multi objective project portfolio selection","authors":"Kamal Baqeri, Emran Mohammadi, Mahsa Mofrad Gilani","doi":"10.5267/J.JPM.2019.6.003","DOIUrl":"https://doi.org/10.5267/J.JPM.2019.6.003","url":null,"abstract":"Article history: Received: May 8 2019 Received in revised format: June 2 2019 Accepted: June 9 2019 Available online: June 1","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.7,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.6.003","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"70781058","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信