{"title":"An application of fuzzy BWM for risk assessment in offshore oil projects","authors":"R. Ketabchi, M. Ghaeli","doi":"10.5267/J.JPM.2019.3.001","DOIUrl":null,"url":null,"abstract":"Article history: Received: November 28 2018 Received in revised format: December 25 2018 Accepted: March 1 2019 Available online: March 1 2019 The purpose of this paper is to examine the existing risks for the offshore project and risk weighting using the fuzzy best worst method (FBWM). In offshore oil projects, we face six major risks. Each of these risks is divided into smaller risks leaving us to have a total of 34 risks. Some of these risks are internal and some are external risks. In this method, first, the experts of this field determined the best and the worst type of risk. Then, using the experts’ opinions, the study compared the remaining risks with the two selected risks and the other weights are determined. In our survey, “Technical Risk and Project Execution” is the most important risk factor followed by “Political Risk and Sanctions”, “Market risk”, “Management risk”, “Financial risk and currency fluctuations” and “Environmental risk”. © 2019 by the authors; licensee Growing Science, Canada.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.3.001","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/J.JPM.2019.3.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 9
模糊BWM在海上石油工程风险评估中的应用
文章历史:收稿日期:2018年11月28日收稿日期:2018年12月25日收稿日期:2019年3月1日在线提供日期:2019年3月1日本文的目的是使用模糊最佳最差方法(FBWM)研究海上项目的现有风险和风险加权。在海上石油项目中,我们面临六大风险。这些风险中的每一个都被分成更小的风险,这样我们总共有34个风险。这些风险有些是内部风险,有些是外部风险。在该方法中,首先由该领域的专家确定最佳和最差的风险类型。然后,根据专家的意见,将剩余风险与选择的两个风险进行比较,并确定其他权重。在我们的调查中,“技术风险和项目执行”是最重要的风险因素,其次是“政治风险和制裁”、“市场风险”、“管理风险”、“财务风险和汇率波动”和“环境风险”。©2019作者所有;加拿大Growing Science公司
本文章由计算机程序翻译,如有差异,请以英文原文为准。