A scientometrics survey on project scheduling

IF 1.3 Q4 ENGINEERING, INDUSTRIAL
M. Ghaeli, S. Sadi-Nezhad
{"title":"A scientometrics survey on project scheduling","authors":"M. Ghaeli, S. Sadi-Nezhad","doi":"10.5267/J.JPM.2019.1.006","DOIUrl":null,"url":null,"abstract":"Article history: Received: October 28 2018 Received in revised format: November 25 2018 Accepted: January 23 2019 Available online: January 23 2019 In project management, a schedule is considered as a list a project's milestones, activities, and deliverables, normally with some start and finish time schedule, which are estimated by some information incorporated in the project schedule including resource allocation, budget, task duration, and linkages of dependencies and scheduled events. This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Scopus database as a primary search engine and covers 3370 records over the period 1963-2019. The records are statistically analyzed and categorized in terms of different criteria. Based on the survey, \"decision support systems\" is the keyword which has carried the highest densities followed by heuristics methods. Among the most cited articles, papers published by researchers in Germany have received the highest citations (9084), followed by United States (7058) and Belgium with 4853 citations.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.1.006","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/J.JPM.2019.1.006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

Article history: Received: October 28 2018 Received in revised format: November 25 2018 Accepted: January 23 2019 Available online: January 23 2019 In project management, a schedule is considered as a list a project's milestones, activities, and deliverables, normally with some start and finish time schedule, which are estimated by some information incorporated in the project schedule including resource allocation, budget, task duration, and linkages of dependencies and scheduled events. This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Scopus database as a primary search engine and covers 3370 records over the period 1963-2019. The records are statistically analyzed and categorized in terms of different criteria. Based on the survey, "decision support systems" is the keyword which has carried the highest densities followed by heuristics methods. Among the most cited articles, papers published by researchers in Germany have received the highest citations (9084), followed by United States (7058) and Belgium with 4853 citations.
项目进度的科学计量学调查
文章历史:收到:2018年10月28日收到修订格式:2018年11月25日接受:2019年1月23日在线提供:2019年1月23日在项目管理中,时间表被认为是项目的里程碑,活动和可交付成果的列表,通常具有一些开始和完成时间表,这些时间表由项目时间表中包含的一些信息估计,包括资源分配,预算,任务持续时间以及依赖关系和计划事件的联系。本文对项目进度的相关研究进行了综述。该研究使用Scopus数据库作为主要搜索引擎,涵盖了1963年至2019年期间的3370条记录。对这些记录进行统计分析,并根据不同的标准进行分类。根据调查结果,“决策支持系统”是密度最高的关键词,其次是启发式方法。在被引次数最多的论文中,德国发表的论文被引次数最多(9084次),其次是美国(7058次)和比利时(4853次)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信