A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources

IF 1.3 Q4 ENGINEERING, INDUSTRIAL
Aidin Delgoshaei, Sepehr Esmaeili Hanjani, Amirhasan Nasiri
{"title":"A genetic algorithm for scheduling multimode resource-constrained project problem in the presence of preemptive resources","authors":"Aidin Delgoshaei, Sepehr Esmaeili Hanjani, Amirhasan Nasiri","doi":"10.5267/j.jpm.2019.3.005","DOIUrl":null,"url":null,"abstract":"Article history: Received: January 8 2019 Received in revised format: January 27 2019 Accepted: March 19 2019 Available online: March 19 2019 In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF). The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in backward mode. For this purpose, a Genetic Algorithm is applied to solve experimental cases with 50 variables and the results are compared with forward serial programming method. The remarkable results reveal that the backward approach is an effective way to maximize NPV in MRCPSP-DC while activity splitting is allowed. The algorithm is flexible enough to be used in real project. © 2019 by the authors; licensee Growing Science, Canada.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/j.jpm.2019.3.005","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2019.3.005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 3

Abstract

Article history: Received: January 8 2019 Received in revised format: January 27 2019 Accepted: March 19 2019 Available online: March 19 2019 In this paper, a backward approach is proposed for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF). The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in backward mode. For this purpose, a Genetic Algorithm is applied to solve experimental cases with 50 variables and the results are compared with forward serial programming method. The remarkable results reveal that the backward approach is an effective way to maximize NPV in MRCPSP-DC while activity splitting is allowed. The algorithm is flexible enough to be used in real project. © 2019 by the authors; licensee Growing Science, Canada.
基于遗传算法的多模式资源约束调度问题
文章历史:收稿日期:2019年1月27日收稿日期:2019年3月19日在线发布日期:2019年3月19日本文提出了一种反向方法,用于在假设贴现正现金流(MRCPSP-DCF)的情况下,最大化多模式资源约束项目调度问题的净现值(NPV)。使用进度付款法,所有资源都被认为是优先的。该方法通过向后模式的资源日历,利用未调度的资源实现NPV最大化。为此,应用遗传算法求解了50个变量的实验案例,并与前向串行规划方法进行了比较。结果表明,在允许活性分裂的情况下,反向方法是最大化MRCPSP-DC NPV的有效方法。该算法具有一定的灵活性,可以在实际工程中应用。©2019作者所有;加拿大Growing Science公司
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信