{"title":"DAMPAK PEMBANGUNAN ABDUL RASYID TOWER TERHADAP PERUBAHAN ARUS LALU LINTAS DI KABUPATEN KOTAWARINGIN BARAT","authors":"Yudi Ribut Pamungkas, Pratikso, Rachmat Mudiyono","doi":"10.36728/jtsa.v29i1.2867","DOIUrl":"https://doi.org/10.36728/jtsa.v29i1.2867","url":null,"abstract":"In line with population growth, Pangkalan Bun City has now expanded to include linear pathways or the surrounding area, not only in the city center. This has resulted in the City of Pangkalan Bun having many large trading centers and one of them is the construction of the Abdul Rasyid Tower on Jalan Udan Said in front of the CBI Group head office, Pangkalan Bun, West Kotawaringin Regency, which will result in congestion / attraction of new trips in Pangkalan Bun City. \u0000Data collection was carried out by means of a direct survey at the Abdul Rasyid Tower intersection on Jalan Udan Said during peak hours in the morning, afternoon and evening from 06.00 – 18.00 WIB. From the survey results, grouping was carried out on each segment at the intersection and presented in the form of a vehicle table. In calculating the savings analysis using the 1997 Indonesian Highway Capacity Manual and Vissim Software. Traffic performance around the Abdul Rasyid Tower project site at the time prior to construction according to MKJI 1997 calculations, the biggest delay at the afternoon intersection at the first intersection was 7,45 second. The results of the Vissim Software the biggest intersection delay occurred in the morning at the first intersection, which was 7,98 second. Traffic performance around the Abdul Rasyid Tower project site during construction according to MKJI 1997 calculations, the largest intersection delay occurred in the afternoon at the first intersection of 9,47 second. The results of the Vissim Software, the biggest delay at the intersection occurred in the afternoon at the first intersection at 9,89 second. Traffic performance around the Abdul Rasyid Tower project site during post-construction according to MKJI 1997 calculations, the largest intersection delay during the day at the first intersection was 7,78 second. The results of the Vissim Software, the largest delay at the first intersection during the day is 8,21 second.","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139628113","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"PERENCANAAN STRUKTUR KANTOR PHICOS DENGAN SISTIM RANGKA BAJA PEMIKUL MOMEN KHUSUS","authors":"Rasyiid Lathiif Amhudo, Dwi Prasetyo Utomo","doi":"10.36728/jtsa.v29i1.3038","DOIUrl":"https://doi.org/10.36728/jtsa.v29i1.3038","url":null,"abstract":"Colomadu is the name of a district in Karanganyar Regency, Central Java. Colomadu's economic growth can grow through the goods and services business, tourism, and industry so that an office building is planned in the Colomadu area. Because the location of Colomadu District is not far from the province of Yogyakarta, where earthquakes often occur, an earthquake-resistant building is needed to anticipate a minimum number of casualties and material losses during an earthquake. Therefore, in planning this office, a special moment resisting frame system (SRPMK) is used. The building with the Special Moment Bearing Frame System (SRPMK) is planned with the concept of Strong Column and Weak Beam (strong column and weak beam). This planning aims to plan a building structure that is resistant to earthquake loads that will be received by the structure using a special moment-bearing frame structure system and refers to the applicable requirements in accordance with SNI 2847: 2019. Earthquake loads are reviewed using the spectrum response method and structural analysis is carried out with the help of the ETABS V9.7.4 program. From the planning results, the dimensions of the bondek floor plate thickness of 140 mm, beams B1A 150x400 mm, B2A 200x400 mm, B2B 200x400 mm, B2C 200x400 mm, B2D 200x400 mm, B2E 200x400 mm, B3A 200x500 mm, B3B 200x500 mm, B4A 300x150 mm, B5A 300x150 mm, BS 150x300 mm, and columns KP 150x150 mm, K1A 200x300 mm, K2A 400x550 mm, K3A 450x650 mm, and K4A 350x500 mm.","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139628094","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANALISIS PROSES PERENCANAAN DAN PENGANGGARAN BELANJA MODAL DPU KOTA SEMARANG TAHUN ANGGARAN 2019","authors":"Muji Bagus Prastyo, Antonius, Abdul Rochim","doi":"10.36728/jtsa.v29i1.2868","DOIUrl":"https://doi.org/10.36728/jtsa.v29i1.2868","url":null,"abstract":"Presidential Regulation No. 54 of 2010 concerning Government Procurement of Goods/Services which is relatively more comprehensive is expected to be able to regulate order in the implementation of government procurement of goods and services. The government provides the widest opportunity for small businesses, micro-enterprises and cooperatives to take part in tenders for goods/services procurement work packages. The purpose of this study is divided into 2 (two) which are research stages, namely analyzing the effectiveness of the regional financial performance of the Semarang City Government, analyzing the efficiency of the regional financial performance of the Semarang City Government with variables. \u0000The type of research used in this research is research using quantitative methods with SWOT analysis and questionnaire methods, qualitative descriptive analysis by measuring the financial performance of the DPU Semarang City Government through the concepts of effectiveness and efficiency. Measurement is measured through a comparison of actual revenue with revenue budget \u0000Based on the results of the analysis using SWOT analysis with IFAS and EFAS scores, it can be seen that the Planning and Budgeting of Capital Expenditures for the DPU for the City of Semarang for the 2019 Fiscal Year is located in Quadrant I. From the calculation of the effectiveness and efficiency of the DPU for the City of Semarang in 2019 it looks effective but not efficient, because it obtained the effectiveness value is 105.53% where the value indicates it is effective, and the efficiency value is 106.7% where the value indicates it is not efficient.","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139628302","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Andiko Irhash Putra, Kartono Wibowo, M. Faiqun Ni’am
{"title":"OPTIMASI WAKTU DAN BIAYA PADA PROYEK BENDUNGAN SELESAI (STUDI KASUS PADA PROYEK PEMBANGUNAN BENDUNGAN BENDO TAHAP 2)","authors":"Andiko Irhash Putra, Kartono Wibowo, M. Faiqun Ni’am","doi":"10.36728/jtsa.v29i1.2861","DOIUrl":"https://doi.org/10.36728/jtsa.v29i1.2861","url":null,"abstract":"The implementation of a project will not be separated from three factors, namely quality, time and cost. Time and cost factors can be calculated carefully and can be optimized. This needs to be done to evaluate the performance of a project, so that it becomes a lesson for the next project. This study aims to measure project performance, create optimal reschedules, optimal crash programs and calculate the time effectiveness and cost efficiency of rescheduling made in the Phase 2 Bendo Dam project. The method used in this study is the earned value and crash program with the data needed in this study is the Budget Plan (RAB), Time Schedule, Project Monthly Reports and Project Financial Reports. Then an analysis of the time and cost performance of the project is carried out, as well as calculating the optimization of alternatives for adding overtime hours and adding labor so that an optimal comparison of time and costs is obtained from the several alternatives. The results of the project performance using the earned value method in terms of costs are more accurate starting from the 18th month to the 25th month, as well as the completion time according to the planned time schedule. Meanwhile, the optimal rescheduling and crash program is adding workers with a cost efficiency of 0.66% of the total cost with a normal duration and time effectiveness of 88 calendar days.","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139628530","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Gunarso, Dian Arumningsih Diah Purnamawanti, Reki Arbianto
{"title":"INOVASI ECO-FRIENDLY SELF COMPACTING CONCRETE MENGGUNAKAN SERBUK CANGKANG TELUR, SERBUK GRANIT, DAN LIMBAH BETON UNTUK MENGURANGI LIMBAH DI INDONESIA","authors":"Gunarso, Dian Arumningsih Diah Purnamawanti, Reki Arbianto","doi":"10.36728/jtsa.v29i1.3027","DOIUrl":"https://doi.org/10.36728/jtsa.v29i1.3027","url":null,"abstract":"Perkembangan dunia teknik sipil mengalami kemajuan yang sangat pesat di era society 5.0 dan gencarnya pembangunan infrastruktur di tanah air. Beton SCC merupakan beton yang inovatif yang tidak memerlukan getaran ataupun alat pemadat karna baton SCC dapat memadat sendiri. Banyaknya kebutuhan akan material menyebabkan terjadinya penambangan ilegal yang akan merusak lingkungan. Oleh karena itu, perlu adanya alternatif lain untuk mengurangi eksploitasi alam yang semakin lama akan berdampak buruk bagi lingkungan. Tujuan dari penelitian ini yaitu pemanfaatan serbuk cangkang telur dan serbuk granit digunakan sebagai subtitusi agregat halus, limbah beton digunakan sebagai subtitusi agregat kasar. Material serbuk cangkang telur berasal dari limbah cangkang telur yang telah dihaluskan dan memiliki kandungan kalsium karbonat (CaCO3) tinggi. Dalam proses produksi granit, 30% dari setiap lempengan berubah menjadi lumpur batu. Limbah tersebut sering dimuat ke dalam truk untuk dibawa pergi dan dibuang ke alam. Limbah beton adalah material sisa beton yang sudah tidak terpakai lagi untuk konstruksi.. Hasil pengujian yang dilakukan menunjukan hasil optimum masing-masing inovasi adalah 40% serbuk cangkang telur, 20% serbuk granit dan 20% limbah beton. Okamura dan Ouichi menyatakan bahwa dalam pembuatan beton SCC, agregat halus harus lebih tinggi daripada agregat kasar. Inovasi beton SCC ramah lingkungan menggunakan serbuk cangkang telur, serbuk granit, dan limbah beton mampu menghasilkan kuat tekan >41,4 MPa dan dapat menghemat biaya Rp. 407.739 /m3 dari harga beton SCC tanpa menggunakan inovasi atau setara dengan 25,92 % lebih ekonomis. \u0000Kata kunci: Self compacting concrete, beton ramah lingkungan, serbuk cangkang telur, serbuk granit, limbah beton, ekonomis.","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-01-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139628857","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"EVALUASI KUALITAS UDARA PADA PEKERJAAN TEROWONGAN PENGAMBILAN (STUDI KASUS K3 PROYEK BENDUNGAN JLANTAH KARANGANYAR)","authors":"Ruli Wijayanto, Herman Susila, Suryo Handoyo","doi":"10.36728/jtsa.v29i1.2879","DOIUrl":"https://doi.org/10.36728/jtsa.v29i1.2879","url":null,"abstract":"Angka kecelakaan kerja di Indonesia cukup tinggi, pada tahun 2018 data BPJS menunjukan angka 157.313 kasus, salah satunya kasus kecelakaan kerja pada pekerjaan area ruang terbatas. Pelaksanaan pekerjaan ruang terbatas harus dilaksanakan sesuai dengan standar operasional prosedur keselamatan kerja yaitu pengendalian kualitas udara seperti kandungan O2, CO, H2S, dan gas pemicu ledakan (LEL), dipastikan tidak melebihi nilai ambang batas sesuai peraturan agar terhindar dari accident. Penelitian ini dilakukan di PT Waskita Karya-Adhi Karya, KSO, pada pekerjaan terowongan pengambilan Proyek Bendungan Jlantah yang terletak di kecamatan Jatiyoso kabupaten Karanganyar. Objek yang diteliti sendiri merupakan salah satu pekerjaan konstruksi yang merupakan pekerjaan beresiko tinggi yaitu pekerjaan pembangunan terowong pengambilan yang dikategorikan sebagai ruang terbatas atau confined space. Data-data diperoleh dari data riwayat pengukuran kualitas udara menggunakan alat Gas Detector pada saat pekerjaan galian terowong intake pada rentang waktu November 2020. Hasil pengukuran kadar O2 didalam area kerja menunjukan fluktuasi antara 20,8% – 21% namun tidak signifikan dan masih dalam ambang batas normal 19,5% - 23%. Hasil pengukuran kadar CO selama masa penelitian terdapat beberapa kali peningkatan diatas ambang batas sampai dengan 38 ppm dan 40 ppm dari nilai ambang batas yang diijinkan sebesar 35 ppm. Hasil pengukuran gas H2S dan LEL tidak terdeteksi adanya gas tersebut. \u0000Kata kunci: Keselamatan dan Kesehatan Kerja, Kecelakaan Kerja, Terowongan Pengambilan, Bendungan Jlantah","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2024-01-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139628911","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANALISA PERBANDINGAN BIAYA DAN WAKTU METODE KOSTRUKSI TOP-DOWN DAN BOTTOM-UP PADA PEKERJAAN BASEMENT GEDUNG TENTREM SEMARANG","authors":"S. Manggolo, Antonius, Kartono Wibowo","doi":"10.36728/jtsa.v28i2.2512","DOIUrl":"https://doi.org/10.36728/jtsa.v28i2.2512","url":null,"abstract":"Tentrem Semarang Building is one of the tallest buildings in Semarang with 4 basement floors and 17 top floors. The construction of basements in high-rise buildings is currently being carried out a lot, one of the factors is due to the limited land to be built, in general, the construction of basements is used for parking lots. The basement to be built has different depths and conditions, so it takes the right method according to the conditions in the field. There are 2 methods for implementing basement construction, namely bottom-up and top-down. In the basement structure work of the existing Tentrem Semarang Building construction project, the basement construction used the bottom-up construction method. In this study, the method will be modified using the top-down construction method. Information regarding work methods, worker productivity was obtained by interviewing field supervisors from the owner, interviews with supervisors from the main contractor and direct field observations. Calculation of costs and time is carried out by analyzing the capacity and productivity of labor and heavy equipment, comparing the normal time with the time after changes in construction methods. The results of the modification of the construction method using the top-down construction method for the basement structure of the Tentrem Semarang Building project took 510 days to complete and cost IDR 205,059,861,826. Whereas for the bottom-up method it takes 685 days with a total cost of IDR 253,609,405,225. The application of the Top-Down method to the implementation of the basement structure of the Tentrem Semarang building project is more effective and efficient than the implementation of the Bottom-Up method and produces a time effectiveness value of 25.55% and a cost efficiency of 19.14% compared to the Bottom-Up method \u0000 ","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124530596","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"FAKTOR-FAKTOR YANG MEMPENGARUHI PERILAKU MASYARAKAT TERHADAP EARLY WARNING SYSTEM SAAT MELINTAS DI PERLINTASAN SEBIDANG TANPA PALANG PINTU","authors":"Nurmeindah Pujindasiwi, Arinda Leliana, Muhardono","doi":"10.36728/jtsa.v28i2.2593","DOIUrl":"https://doi.org/10.36728/jtsa.v28i2.2593","url":null,"abstract":"Improving safety at railroad level crossings is continually conducted to reduce accidents rate at railroad level crossings, especially unguarded official railroad level crossings where accidents often occur. Railroad level crossings are prone to accidents and it mainly caused by accidents that occur at level crossings. Accidents at level crossing are caused by several factors such as human error, crossing guards who are late to lower the barrier, and inferior public awareness to comply with signs at level crossings. This research is located at the railroad level crossing KM 31+988 in Taman District, Sidoarjo. The analysis result shows that the influence factors of people violating the train early warning system are the frequency of random crossings in a day which affects the committing violations with a probability value of 60.72%, and the waiting time before a train passes which takes too long promote committing violations with a probability value of 32 .7%.","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139356991","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"PENGARUH ABU TULANG SAPI SEBAGAI BAHAN TAMBAH AGREGAT HALUS DALAM PEMBUATAN BETON READY MIX","authors":"Satria Agung Wibawa","doi":"10.36728/jtsa.v28i2.2613","DOIUrl":"https://doi.org/10.36728/jtsa.v28i2.2613","url":null,"abstract":"ABSTRACT \u0000In this study the authors aimed to determine the effect of using beef bone aggregate as an added ingredient for sand (fine aggregate) as well as an added ingredient for making ready mix concrete. The percentage levels of beef bones used in this study were 4%, 6% and 17%. In the manufacture of the test object is done by mixing the binder (cement), sand (fine aggregate and cow bone ash), gravel (coarse aggregate) and water using the experimental method. Samples of specimens were made using cylindrical molds (molds) and treated. The concrete compression test was carried out using a press machine, the mix design plan for making concrete was planned at 30 MPa. The total test objects made in this study were 20 pieces. The results of the test object with a cow bone ash content of 4% obtained compressive strength results of 7.58MPa 8.775 MPa 11.21 MPa 10.92 MPa and 10 MPa with an average value of 9.7 MPa. From the results of the addition of 6% beef bone ash, the results were 9.79 MPa, 9.73 MPa, 8.03 MPa, 9.23 MPa and 13.36 MPa and an average value of 10 MPa, for results with an addition of 17% cow bone ash was 10.3 MPa, 18.11 MPa, 15.28 MPa, 16.53 MPa and 19.13 MPa with an average yield of 15.87 MPa \u0000Keyword: Concrete, Cow Bone Ash, Compresive masive, Aggregate.","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126335220","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"THE PERFORMANCE AND THE INFLUENCE OF PHYSICAL INFRASTRUCTURES ON THE PLANT PRODUCTIVITY: A CASE STUDY APPROACH","authors":"Muhamad Hendrie Soesanto, S. Wahyudi, M. F. Niam","doi":"10.36728/jtsa.v28i2.2582","DOIUrl":"https://doi.org/10.36728/jtsa.v28i2.2582","url":null,"abstract":"Irrigation System Performance Index (ISPI) is often used as a parameter in making decisions about the use of irrigation canals. The increase in rice production is dependent on a good condition of physical infrastructures, including the main building, the carrier canal and the buildings on the carrier canal. Performance assessment of Physical Infrastructure and Plant Productivity in Sungapan irrigation area of Pemalang Regency indicated that the physical infrastructure performance in 2012 - 2022 was 38.42%, increasing 3.22%. While the performance assessment of Plant Productivity was 14.96%, increasing 2.99%. Based on the multiple regression analysis using simultaneous test (F), the Physical Infrastructure component was indicated to influence the plant productivity. Meanwhile, based on the partial test (t), the physical infrastructure component partially did not have a significant influence on the plant productivity \u0000 \u0000 ","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0,"publicationDate":"2023-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116064785","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}