OPTIMASI WAKTU DAN BIAYA PADA PROYEK BENDUNGAN SELESAI (STUDI KASUS PADA PROYEK PEMBANGUNAN BENDUNGAN BENDO TAHAP 2)

Andiko Irhash Putra, Kartono Wibowo, M. Faiqun Ni’am
{"title":"OPTIMASI WAKTU DAN BIAYA PADA PROYEK BENDUNGAN SELESAI (STUDI KASUS PADA PROYEK PEMBANGUNAN BENDUNGAN BENDO TAHAP 2)","authors":"Andiko Irhash Putra, Kartono Wibowo, M. Faiqun Ni’am","doi":"10.36728/jtsa.v29i1.2861","DOIUrl":null,"url":null,"abstract":"The implementation of a project will not be separated from three factors, namely quality, time and cost. Time and cost factors can be calculated carefully and can be optimized. This needs to be done to evaluate the performance of a project, so that it becomes a lesson for the next project. This study aims to measure project performance, create optimal reschedules, optimal crash programs and calculate the time effectiveness and cost efficiency of rescheduling made in the Phase 2 Bendo Dam project. The method used in this study is the earned value and crash program with the data needed in this study is the Budget Plan (RAB), Time Schedule, Project Monthly Reports and Project Financial Reports. Then an analysis of the time and cost performance of the project is carried out, as well as calculating the optimization of alternatives for adding overtime hours and adding labor so that an optimal comparison of time and costs is obtained from the several alternatives. The results of the project performance using the earned value method in terms of costs are more accurate starting from the 18th month to the 25th month, as well as the completion time according to the planned time schedule. Meanwhile, the optimal rescheduling and crash program is adding workers with a cost efficiency of 0.66% of the total cost with a normal duration and time effectiveness of 88 calendar days.","PeriodicalId":120082,"journal":{"name":"Jurnal Teknik Sipil dan Arsitektur","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-01-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Sipil dan Arsitektur","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36728/jtsa.v29i1.2861","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The implementation of a project will not be separated from three factors, namely quality, time and cost. Time and cost factors can be calculated carefully and can be optimized. This needs to be done to evaluate the performance of a project, so that it becomes a lesson for the next project. This study aims to measure project performance, create optimal reschedules, optimal crash programs and calculate the time effectiveness and cost efficiency of rescheduling made in the Phase 2 Bendo Dam project. The method used in this study is the earned value and crash program with the data needed in this study is the Budget Plan (RAB), Time Schedule, Project Monthly Reports and Project Financial Reports. Then an analysis of the time and cost performance of the project is carried out, as well as calculating the optimization of alternatives for adding overtime hours and adding labor so that an optimal comparison of time and costs is obtained from the several alternatives. The results of the project performance using the earned value method in terms of costs are more accurate starting from the 18th month to the 25th month, as well as the completion time according to the planned time schedule. Meanwhile, the optimal rescheduling and crash program is adding workers with a cost efficiency of 0.66% of the total cost with a normal duration and time effectiveness of 88 calendar days.
大坝竣工项目的时间和成本优化(本多大坝建设项目第 2 阶段案例研究)
项目的实施离不开三个因素,即质量、时间和成本。时间和成本因素可以仔细计算并优化。这就需要对项目绩效进行评估,以便为下一个项目提供借鉴。本研究旨在衡量项目绩效,制定最佳重新安排时间表、最佳碰撞方案,并计算本多大坝二期工程重新安排时间表的时间效率和成本效率。本研究采用的方法是挣值和碰撞程序,所需的数据包括预算计划(RAB)、时间进度表、项目月度报告和项目财务报告。然后,对项目的时间和成本绩效进行分析,并对增加加班时间和增加劳动力的备选方案进行优化计算,以便从多个备选方案中获得时间和成本的最佳比较。从第 18 个月开始到第 25 个月,使用挣值法计算成本的项目绩效结果较为准确,根据计划时间进度表计算的完工时间也较为准确。同时,最优的重新安排和碰撞方案是增加工人,成本效率为总成本的 0.66%,正常工期和时间效率为 88 个日历日。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
文献相关原料
公司名称 产品信息 采购帮参考价格
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信