Proceedings of the Institution of Civil Engineers-Management Procurement and Law最新文献

筛选
英文 中文
Briefing: Time-bar provisions of NEC3 Engineering and Construction Contract clause W1.3 简报:NEC3工程建设合同条款W1.3的时间条规定
IF 1.8
Terrence Davis
{"title":"Briefing: Time-bar provisions of NEC3 Engineering and Construction Contract clause W1.3","authors":"Terrence Davis","doi":"10.1680/jmapl.18.00045","DOIUrl":"https://doi.org/10.1680/jmapl.18.00045","url":null,"abstract":"","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"35 3","pages":""},"PeriodicalIF":1.8,"publicationDate":"2019-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/jmapl.18.00045","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72486950","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Briefing: Time-bar provisions of the NEC3 Engineering and Construction Contract clause W1.3 简报:NEC3工程与建设合同条款W1.3的时间条规定
IF 1.8
Terrence Davis
{"title":"Briefing: Time-bar provisions of the NEC3 Engineering and Construction Contract clause W1.3","authors":"Terrence Davis","doi":"10.1680/jmapl.18.00008","DOIUrl":"https://doi.org/10.1680/jmapl.18.00008","url":null,"abstract":"","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"64 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79022038","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Disparity between the procurement process best practices for PPP projects in the UK and Malaysia 英国和马来西亚PPP项目采购流程最佳实践的差异
IF 1.8
F. Ghazali, Samsul Abd Rashid, A. M. Sadullah
{"title":"Disparity between the procurement process best practices for PPP projects in the UK and Malaysia","authors":"F. Ghazali, Samsul Abd Rashid, A. M. Sadullah","doi":"10.1680/jmapl.17.00057","DOIUrl":"https://doi.org/10.1680/jmapl.17.00057","url":null,"abstract":"","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"47 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"90905626","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Perceptions on safety climate: a case study in the Omani construction industry 对安全气候的看法:阿曼建筑业的案例研究
IF 1.8
T. Umar, C. Egbu
{"title":"Perceptions on safety climate: a case study in the Omani construction industry","authors":"T. Umar, C. Egbu","doi":"10.1680/JMAPL.18.00001","DOIUrl":"https://doi.org/10.1680/JMAPL.18.00001","url":null,"abstract":"© 2018 ICE Publishing. All rights reserved. Generally, a mature safety climate and a rich safety culture contribute to achieving a safe workplace. The purpose of this paper is to examine the understanding of using safety climate and to make explicit some of the main elements that have a greater impact in the construction industry in Oman. Relevant safety climate factors from literature have been identified using specific search criteria, which resulted in 62 factors spanning over a period of 37 years from 1980 to 2017. The results of face-to-face interviews with construction professionals from chosen construction companies in Oman that show a high level of safety performance are also presented. The result shows that management commitment; alignment and integration of safety as a value; accountability across the board; supervisory management; empowerment and involvement of workers; improvement of communication; and training and education are some of the main elements that significantly affect safety climate in Oman. The common safety climate factors reported in this research are based on the views of selected interviewees working in the construction industry in Oman. It is suggested that these factors may be validated further considering views of other members of the construction team, before being used for safety climate assessment.","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"148 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77579462","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 33
A cyber–physical system (CPS) for planning and monitoring mobile cranes on construction sites 用于规划和监测建筑工地移动式起重机的网络物理系统(CPS)
IF 1.8
Congwen Kan, Yihai Fang, C. Anumba, J. Messner
{"title":"A cyber–physical system (CPS) for planning and monitoring mobile cranes on construction sites","authors":"Congwen Kan, Yihai Fang, C. Anumba, J. Messner","doi":"10.1680/JMAPL.17.00042","DOIUrl":"https://doi.org/10.1680/JMAPL.17.00042","url":null,"abstract":"Various ways of improving mobile crane safety on construction sites have been introduced and adopted, such as visualisation of mobile crane operations, algorithm-based lift planning and spatial con...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"25 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86179696","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 18
Maintaining and widening the M25 motorway, UK: a private finance case study 维护和拓宽M25高速公路,英国:一个私人融资案例研究
IF 1.8
F. Rubio
{"title":"Maintaining and widening the M25 motorway, UK: a private finance case study","authors":"F. Rubio","doi":"10.1680/jmapl.17.00016","DOIUrl":"https://doi.org/10.1680/jmapl.17.00016","url":null,"abstract":"","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"96 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79418557","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Municipal bonds as a means of accelerating local infrastructure investment 市政债券作为加速地方基础设施投资的手段
IF 1.8
F. Medda, L. Cocconcelli
{"title":"Municipal bonds as a means of accelerating local infrastructure investment","authors":"F. Medda, L. Cocconcelli","doi":"10.1680/JMAPL.17.00018","DOIUrl":"https://doi.org/10.1680/JMAPL.17.00018","url":null,"abstract":"Even today, the 2007 financial crisis imposes negative impacts on the ability of local authorities to raise funds for capital investment, particularly for infrastructure. A fundamental need thus ex...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"33 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79637694","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Enhancing value for money in public procurement of Northern Ireland construction projects 提高北爱尔兰建筑项目公共采购的性价比
IF 1.8
Gary McArdle, J. G. Gunning
{"title":"Enhancing value for money in public procurement of Northern Ireland construction projects","authors":"Gary McArdle, J. G. Gunning","doi":"10.1680/JMAPL.17.00023","DOIUrl":"https://doi.org/10.1680/JMAPL.17.00023","url":null,"abstract":"The purpose of this research was to evaluate public procurement in Northern Ireland (NI) – more specifically, the achievement of value for money (VfM) in public construction projects. Other areas a...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"9 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76659410","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
A client’s perspective of design for manufacture and assembly in the UK water industry 客户对英国水务行业制造和装配设计的看法
IF 1.8
Lyndon Trinder, J. Browne, Kieran Brocklebank
{"title":"A client’s perspective of design for manufacture and assembly in the UK water industry","authors":"Lyndon Trinder, J. Browne, Kieran Brocklebank","doi":"10.1680/jmapl.17.00036","DOIUrl":"https://doi.org/10.1680/jmapl.17.00036","url":null,"abstract":"UK water companies are under increasing pressure from regulators, customers and tightening legislation to deliver more for less. Design for manufacture and assembly (DfMA) has proven to deliver efficiencies in other sectors including construction and manufacturing. Faced with increasing financial constraints, many water industry companies are now looking to gain the benefits of DfMA. A study was undertaken to summarise the processes adopted by one of the UK’s largest water companies to achieve the benefits of DfMA. The company sees DfMA as an efficiency strategy in delivering its investment programme. To enable, lead and drive this strategy, the company implemented a client-led DfMA change programme supported by collaboration with key supply partners including contractors, consultants and suppliers. DfMA forms part of a wider strategic shift at the company comprising better digital data management and a design-and-build contract strategy. These changes will drive efficiencies across the investment program...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"8 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86176595","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Design for manufacture and assembly: its benefits and risks in the UK water industry 为制造和装配设计:其在英国水务行业的利益和风险
IF 1.8
Lyndon Trinder
{"title":"Design for manufacture and assembly: its benefits and risks in the UK water industry","authors":"Lyndon Trinder","doi":"10.1680/jmapl.17.00021","DOIUrl":"https://doi.org/10.1680/jmapl.17.00021","url":null,"abstract":"","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"26 2 1","pages":""},"PeriodicalIF":1.8,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83502329","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信