A client’s perspective of design for manufacture and assembly in the UK water industry

IF 1.3 Q3 MANAGEMENT
Lyndon Trinder, J. Browne, Kieran Brocklebank
{"title":"A client’s perspective of design for manufacture and assembly in the UK water industry","authors":"Lyndon Trinder, J. Browne, Kieran Brocklebank","doi":"10.1680/jmapl.17.00036","DOIUrl":null,"url":null,"abstract":"UK water companies are under increasing pressure from regulators, customers and tightening legislation to deliver more for less. Design for manufacture and assembly (DfMA) has proven to deliver efficiencies in other sectors including construction and manufacturing. Faced with increasing financial constraints, many water industry companies are now looking to gain the benefits of DfMA. A study was undertaken to summarise the processes adopted by one of the UK’s largest water companies to achieve the benefits of DfMA. The company sees DfMA as an efficiency strategy in delivering its investment programme. To enable, lead and drive this strategy, the company implemented a client-led DfMA change programme supported by collaboration with key supply partners including contractors, consultants and suppliers. DfMA forms part of a wider strategic shift at the company comprising better digital data management and a design-and-build contract strategy. These changes will drive efficiencies across the investment program...","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"8 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jmapl.17.00036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

Abstract

UK water companies are under increasing pressure from regulators, customers and tightening legislation to deliver more for less. Design for manufacture and assembly (DfMA) has proven to deliver efficiencies in other sectors including construction and manufacturing. Faced with increasing financial constraints, many water industry companies are now looking to gain the benefits of DfMA. A study was undertaken to summarise the processes adopted by one of the UK’s largest water companies to achieve the benefits of DfMA. The company sees DfMA as an efficiency strategy in delivering its investment programme. To enable, lead and drive this strategy, the company implemented a client-led DfMA change programme supported by collaboration with key supply partners including contractors, consultants and suppliers. DfMA forms part of a wider strategic shift at the company comprising better digital data management and a design-and-build contract strategy. These changes will drive efficiencies across the investment program...
客户对英国水务行业制造和装配设计的看法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.00
自引率
16.70%
发文量
32
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信