{"title":"英国和马来西亚PPP项目采购流程最佳实践的差异","authors":"F. Ghazali, Samsul Abd Rashid, A. M. Sadullah","doi":"10.1680/jmapl.17.00057","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"47 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Disparity between the procurement process best practices for PPP projects in the UK and Malaysia\",\"authors\":\"F. Ghazali, Samsul Abd Rashid, A. M. Sadullah\",\"doi\":\"10.1680/jmapl.17.00057\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":44163,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"volume\":\"47 1\",\"pages\":\"\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jmapl.17.00057\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jmapl.17.00057","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}