{"title":"简报:NEC3工程建设合同条款W1.3的时间条规定","authors":"Terrence Davis","doi":"10.1680/jmapl.18.00045","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":"35 3","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2019-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/jmapl.18.00045","citationCount":"0","resultStr":"{\"title\":\"Briefing: Time-bar provisions of NEC3 Engineering and Construction Contract clause W1.3\",\"authors\":\"Terrence Davis\",\"doi\":\"10.1680/jmapl.18.00045\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":44163,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"volume\":\"35 3\",\"pages\":\"\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2019-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1680/jmapl.18.00045\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jmapl.18.00045\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jmapl.18.00045","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}