Geomechanik und Tunnelbau最新文献

筛选
英文 中文
Cover Picture: Geomechanics and Tunnelling 3/2024 封面图片:地质力学与隧道工程 3/2024
Geomechanik und Tunnelbau Pub Date : 2024-06-14 DOI: 10.1002/geot.202480301
{"title":"Cover Picture: Geomechanics and Tunnelling 3/2024","authors":"","doi":"10.1002/geot.202480301","DOIUrl":"https://doi.org/10.1002/geot.202480301","url":null,"abstract":"<p>In Stockholm, Implenia builds of one of the world's deepest metro stations. This new metro station is an extension of the Blue Line to Södermalm. Beside the station single-track tunnels for the subway, lift shafts, and a collateral service tunnel are constructed. Due to the difficult geological conditions and the bad quality rock, the AT – Pipe Umbrella System with squeeze connections were used to reinforce excavations and bolster safety during construction (photo: DSI Underground).</p>","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/geot.202480301","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141326609","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
News: Geomechanics and Tunnelling 3/2024 新闻:地质力学与隧道工程 3/2024
Geomechanik und Tunnelbau Pub Date : 2024-06-14 DOI: 10.1002/geot.202480371
{"title":"News: Geomechanics and Tunnelling 3/2024","authors":"","doi":"10.1002/geot.202480371","DOIUrl":"https://doi.org/10.1002/geot.202480371","url":null,"abstract":"","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 3","pages":"164-170"},"PeriodicalIF":0.0,"publicationDate":"2024-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141326612","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Imprint: Geomechanics and Tunnelling 3/2024 版本说明:地质力学与隧道工程 3/2024
Geomechanik und Tunnelbau Pub Date : 2024-06-14 DOI: 10.1002/geot.202480397
{"title":"Imprint: Geomechanics and Tunnelling 3/2024","authors":"","doi":"10.1002/geot.202480397","DOIUrl":"https://doi.org/10.1002/geot.202480397","url":null,"abstract":"","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/geot.202480397","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141326607","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Diary of Events: Geomechanics and Tunnelling 3/2024 活动日记:地质力学与隧道工程 3/2024
Geomechanik und Tunnelbau Pub Date : 2024-06-14 DOI: 10.1002/geot.202480379
{"title":"Diary of Events: Geomechanics and Tunnelling 3/2024","authors":"","doi":"10.1002/geot.202480379","DOIUrl":"https://doi.org/10.1002/geot.202480379","url":null,"abstract":"","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 3","pages":"242"},"PeriodicalIF":0.0,"publicationDate":"2024-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141326606","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Product Information: Geomechanics and Tunnelling 3/2024 产品信息:地质力学与隧道工程 3/2024
Geomechanik und Tunnelbau Pub Date : 2024-06-14 DOI: 10.1002/geot.202480378
{"title":"Product Information: Geomechanics and Tunnelling 3/2024","authors":"","doi":"10.1002/geot.202480378","DOIUrl":"https://doi.org/10.1002/geot.202480378","url":null,"abstract":"","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 3","pages":"233-241"},"PeriodicalIF":0.0,"publicationDate":"2024-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141326613","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Coupling process controlling data and numerical simulation in mechanised tunnelling 将机械化隧道施工中的过程控制数据与数值模拟结合起来
Geomechanik und Tunnelbau Pub Date : 2024-06-11 DOI: 10.1002/geot.202400011
M.Sc. Yaman Zendaki, Dr.-Ing. Ba-Trung Cao, Dr.-Ing. Janosch Stascheit, Dr.-Ing. Abdullah Alsahly, Prof. Dr.-Ing. Steffen Freitag, Dr.-Ing. Ulrich Maidl, Prof. Dr. techn. Günther Meschke
{"title":"Coupling process controlling data and numerical simulation in mechanised tunnelling","authors":"M.Sc. Yaman Zendaki,&nbsp;Dr.-Ing. Ba-Trung Cao,&nbsp;Dr.-Ing. Janosch Stascheit,&nbsp;Dr.-Ing. Abdullah Alsahly,&nbsp;Prof. Dr.-Ing. Steffen Freitag,&nbsp;Dr.-Ing. Ulrich Maidl,&nbsp;Prof. Dr. techn. Günther Meschke","doi":"10.1002/geot.202400011","DOIUrl":"10.1002/geot.202400011","url":null,"abstract":"<p>Nowadays, both process data management and numerical analysis are necessary for decision-making in a tunnel project from its early design stage to the construction phase. Traditional generation of simulation models largely depends on tunnel design and reports, which are error prone due to the involvement of manual intervention. This article presents the application of a digital workflow to efficiently transfer automatically acquired data from tunnel projects to computational simulations. The application workflow is developed and executed through a web-based environment. Project data from the Victory Boogie Woogie tunnel is retrieved from the process controlling software PROCON via web services to generate numerical simulations for settlement predictions at different tunnel sections. The simulated results are validated using real measured settlements in the project to prove the quality of the simulation model. Different scenarios of applying operational steering parameters are then investigated, utilising the simulation model, which can be used to support the on-site engineers as an assistance system to drive the tunnel boring machines. The work has been carried out within the framework of the transfer project T2 of the Collaborative Research Center “Interaction Modeling in Mechanized Tunneling” (SFB 837), which aims to implement and test a digital twin for process control under practical conditions in the tunnelling industry.</p>","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 4","pages":"324-331"},"PeriodicalIF":0.0,"publicationDate":"2024-06-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141358405","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Cetin Dam – stabilising troubled abutment slopes Cetin 大坝--加固有问题的台基斜坡
Geomechanik und Tunnelbau Pub Date : 2024-05-03 DOI: 10.1002/geot.202400007
Mag. Irmina Pöschl, Dr. Johannes Kleberger, MSc. João Dinis, MSc. Teoman Hizal
{"title":"Cetin Dam – stabilising troubled abutment slopes","authors":"Mag. Irmina Pöschl,&nbsp;Dr. Johannes Kleberger,&nbsp;MSc. João Dinis,&nbsp;MSc. Teoman Hizal","doi":"10.1002/geot.202400007","DOIUrl":"10.1002/geot.202400007","url":null,"abstract":"<p>The 420 MW Cetin Dam Project in Turkey was subject to severe setbacks, including substantial geotechnical problems. Since 2011, several concessionaires, contractors and designers were involved. In June 2016, a major failure occurred at a high cut slope of the right bank (RB) valley flank. In 2017, contractor Limak took over the project with a US$ 600 mio concession contract. To secure the contractual agreement for state-guaranteed energy remuneration, Cetin Dam and hydro hydroelectric power plant (HEPP) had to be operative in 2020. Missing the time target would have implied high economic losses for the concessionaire, and this set-in-stone deadline imposed extraordinary pressure for developing fast and reliable solutions. Worryingly, progressing failure became evident at the failed RB cut slope, while rehabilitation works were ongoing. In late December 2017, shortly after a review of geotechnical conditions and slope design for the troubled RB slope had started, also parts of the left bank (LB) cut slope failed below crest level and threatened to grow into a global slope failure. With only 26 months’ time left for starting energy production, the slope instabilities jeopardised the economic success of the entire project. Within a 3-month emergency mission for both RB and LB slopes, a dedicated team succeeded in understanding the geotechnical problems, planning and implementing immediate mitigation measures, and developing design solutions. Operation of Cetin Dam and HEPP commenced in 2020.</p>","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 3","pages":"184-194"},"PeriodicalIF":0.0,"publicationDate":"2024-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141016048","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Research and comparison of delivery models at the Gemeinschafts Kraftwerk Inn Untersuchung der Projektabwicklungsmodelle am Gemeinschaftskraftwerk Inn für die Bauzeit 研究和比较 Gemeinschafts Kraftwerk Inn 的交付模式
Geomechanik und Tunnelbau Pub Date : 2024-05-02 DOI: 10.1002/geot.202400008
Carl Philipp Friedinger, Simon Christian Becker, Univ.-Prof. Dipl.-Ing. Dr.techn. Philip Sander
{"title":"Research and comparison of delivery models at the Gemeinschafts Kraftwerk Inn\u0000 Untersuchung der Projektabwicklungsmodelle am Gemeinschaftskraftwerk Inn für die Bauzeit","authors":"Carl Philipp Friedinger,&nbsp;Simon Christian Becker,&nbsp;Univ.-Prof. Dipl.-Ing. Dr.techn. Philip Sander","doi":"10.1002/geot.202400008","DOIUrl":"10.1002/geot.202400008","url":null,"abstract":"","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 3","pages":"220-232"},"PeriodicalIF":0.0,"publicationDate":"2024-05-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141019653","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Considerations for the static and seismic design of pumped storage reservoirs in soft soils and seismic environments 软土和地震环境中抽水蓄能水库的静态和抗震设计考虑因素
Geomechanik und Tunnelbau Pub Date : 2024-04-24 DOI: 10.1002/geot.202400006
Manfred Scheikl
{"title":"Considerations for the static and seismic design of pumped storage reservoirs in soft soils and seismic environments","authors":"Manfred Scheikl","doi":"10.1002/geot.202400006","DOIUrl":"10.1002/geot.202400006","url":null,"abstract":"<p>For recent hydroelectric pumped storage projects, the construction of embankment dam structures on alluvial deposits consisting of exceptionally soft soil and in areas with high seismicity was required. This contribution shares experiences and challenges from the static and seismic design of embankment dam structures and ground treatment options. Finite element-based static and seismic analyses using the Hardening Soil Small Strain model (HSS) showed that preconsolidation has clear benefits compared to stone columns for ground improvement purposes. Regardless of general advantages of surface sealing systems for frequent and rapid impoundment level changes, it was found that clay core design options perform very well under seismic loading conditions and even better than surface-sealed structures. Seismic ground and structure response analyses involving soft soil considering shear strain-dependent stiffness degradation revealed that deamplification is expected in contrast to the rule-of-thumb amplification approaches enshrined in many seismic design guidelines and codes. It was found that this effect increases with seismic magnitudes and that saturation of peak ground acceleration (PGA) takes place. This results in relatively moderate structure excitations even under significant dynamic excitation.</p>","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 3","pages":"212-219"},"PeriodicalIF":0.0,"publicationDate":"2024-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140664608","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Cover Picture: Geomechanics and Tunnelling 2/2024 封面图片:地质力学与隧道工程 2/2024
Geomechanik und Tunnelbau Pub Date : 2024-04-12 DOI: 10.1002/geot.202480201
{"title":"Cover Picture: Geomechanics and Tunnelling 2/2024","authors":"","doi":"10.1002/geot.202480201","DOIUrl":"https://doi.org/10.1002/geot.202480201","url":null,"abstract":"<p>Lining stress controllers (LSC) have been developed as special supporting measure for tunnelling in zones with stress-induced failure involving large ground volumes and large deformations. The shotcrete lining is divided into several segments by longitudinal construction joints. The purpose of this segmentation is to absorb large deformations occurring during tunnel driving in weak ground. LSC elements are installed into these deformation joints. These elements have a defined workload during compression so the primary lining is not damaged (Source: DSI Underground).</p>","PeriodicalId":39412,"journal":{"name":"Geomechanik und Tunnelbau","volume":"17 2","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1002/geot.202480201","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140550091","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信