Cogeneration and Competitive Power Journal最新文献

筛选
英文 中文
Cogen in Europe: VOLATILE!: Is It “Green”? Is It “Brown?” 欧洲的Cogen:不稳定!它是“绿色的”吗?是“棕色”吗?
Cogeneration and Competitive Power Journal Pub Date : 2002-04-01 DOI: 10.1080/10668680209508974
F. Sioshansi
{"title":"Cogen in Europe: VOLATILE!: Is It “Green”? Is It “Brown?”","authors":"F. Sioshansi","doi":"10.1080/10668680209508974","DOIUrl":"https://doi.org/10.1080/10668680209508974","url":null,"abstract":"","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115547543","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
DOE/FEMP's New Program for: Affordable Distributed Energy Resources DOE/FEMP的新项目:可负担的分布式能源
Cogeneration and Competitive Power Journal Pub Date : 2002-04-01 DOI: 10.1092/XRAG-LMMJ-5HUA-YG0K
S. Herrera, Program
{"title":"DOE/FEMP's New Program for: Affordable Distributed Energy Resources","authors":"S. Herrera, Program","doi":"10.1092/XRAG-LMMJ-5HUA-YG0K","DOIUrl":"https://doi.org/10.1092/XRAG-LMMJ-5HUA-YG0K","url":null,"abstract":"","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125702428","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Distributed Cogeneration vs. Centralized Generation: A Technical Comparison 分布式热电联产与集中式热电联产:技术比较
Cogeneration and Competitive Power Journal Pub Date : 2002-03-01 DOI: 10.1080/10668680209508970
N. Strachan
{"title":"Distributed Cogeneration vs. Centralized Generation: A Technical Comparison","authors":"N. Strachan","doi":"10.1080/10668680209508970","DOIUrl":"https://doi.org/10.1080/10668680209508970","url":null,"abstract":"ABSTRACT Three distributed cogeneration (DG) and three centralized electricity technologies were compared for fuel use, private costs and externality costs from CO2, SO2 and NOX emissions. This generalized feasibility comparison investigated the benefits of Cogen/DG over a range of heat to power ratios (HPR). IC engines are found to be both economical and environmentally friendly. Micro-turbines are even better. Therefore, Cogen/DG provides economic, fuel use, and emissions savings in applications with well matched and consistent demands for electricity and heat.","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"83 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132110543","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Do You Have a Packaged Boiler?: Modify it to Cogenerate… and Profit! 你们有包装好的锅炉吗?:将其修改为Cogenerate…and Profit!
Cogeneration and Competitive Power Journal Pub Date : 2001-10-01 DOI: 10.1092/ABYG-AK7L-5CT7-54DU
R. Vetterick, Patrick G. Whitten
{"title":"Do You Have a Packaged Boiler?: Modify it to Cogenerate… and Profit!","authors":"R. Vetterick, Patrick G. Whitten","doi":"10.1092/ABYG-AK7L-5CT7-54DU","DOIUrl":"https://doi.org/10.1092/ABYG-AK7L-5CT7-54DU","url":null,"abstract":"ABSTRACT Competition from deregulation is driving utilities and consumers to seek out alternate means to reduce the cost of electricity. The utility industry is expected to shift generation away from the traditional central station philosophy to dispersed generation with the formerly wasted heat to be recovered and used for industrial steam or to heat commercial buildings.[1] Some experts suggest that the dispersed generation will take the form of cogeneration by locating thermal electric generators with heat recovery steam generators alongside the thermal host. Coincidentally, there are a large number of existing boilers that can serve as waste heat receivers if properly modified. This could result in substantial capital savings, further reducing the cost of the dispersed electrical generation. Repowering cold windbox industrial boilers complements and reinforces the dispersed generation philosophy. This article will compare the economic and technical advantages of repowering existing small industrial bo...","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133002756","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Comments on the Article “Cogeneration Blueprint for State Facilities” 对《国有设施热电联产蓝图》一文的评论
Cogeneration and Competitive Power Journal Pub Date : 2001-10-01 DOI: 10.1092/C1YT-DPPE-A6TE-J3GN
O. P. E. M. F. P. and
{"title":"Comments on the Article “Cogeneration Blueprint for State Facilities”","authors":"O. P. E. M. F. P. and","doi":"10.1092/C1YT-DPPE-A6TE-J3GN","DOIUrl":"https://doi.org/10.1092/C1YT-DPPE-A6TE-J3GN","url":null,"abstract":"","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134366349","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
What Happens If PURPA Goes Belly-Up? PURPA破产怎么办?
Cogeneration and Competitive Power Journal Pub Date : 2001-10-01 DOI: 10.1092/8LKV-VR7M-B9A0-28MU
L. Braquet
{"title":"What Happens If PURPA Goes Belly-Up?","authors":"L. Braquet","doi":"10.1092/8LKV-VR7M-B9A0-28MU","DOIUrl":"https://doi.org/10.1092/8LKV-VR7M-B9A0-28MU","url":null,"abstract":"","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131798151","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Using a "User's Group" to Save Electric Dollars 使用“用户小组”来节省电费
Cogeneration and Competitive Power Journal Pub Date : 2001-07-01 DOI: 10.1092/CH4W-LTEL-VT2G-VUFM
F. J. Richards
{"title":"Using a \"User's Group\" to Save Electric Dollars","authors":"F. J. Richards","doi":"10.1092/CH4W-LTEL-VT2G-VUFM","DOIUrl":"https://doi.org/10.1092/CH4W-LTEL-VT2G-VUFM","url":null,"abstract":"Group purchasing has become a widely used method for various and sundry groups to save money in many areas. This presentation will describe the development of an electric users’ group, its uniqueness from other types of groups, savings members of the group have achieved, problems encountered along the way, opportunities seized and prospects for the future.","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"98 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123079831","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
“Management Metrics”: A Way To Measure Global ESCO Effectiveness “管理指标”:一种衡量全球ESCO有效性的方法
Cogeneration and Competitive Power Journal Pub Date : 2001-07-01 DOI: 10.1092/QUMY-QDYA-HXRV-W8DY
M. Bobker
{"title":"“Management Metrics”: A Way To Measure Global ESCO Effectiveness","authors":"M. Bobker","doi":"10.1092/QUMY-QDYA-HXRV-W8DY","DOIUrl":"https://doi.org/10.1092/QUMY-QDYA-HXRV-W8DY","url":null,"abstract":"ABSTRACT In the de-regulated energy industry, energy service companies have become utility marketing subsidiaries, invading new markets, creating brand recognition, and transferring technology packages tailored to customer needs. They have been at the center of a kind of innovation which is new to the utility Industry: developing end-use “knowledge solutions,” or “Management Metrics.” As the utility industry moves towards business models built around information technology, knowledge management, and customer-focus at the same time as “going global,” conceptualizing and measuring progress in new markets is needed. “Metric Management Measurement Sets” are suggested, based on business data and geared to the process of innovation diffusion. From a technology platform this management information is readily disseminated throughout a globally networked firm, to improve innovation, technology transfer, corporate performance, and, ultimately, change in the global energy system.","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127986697","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
“Free” Money from Electric Deregulation: Getting Your Share of Public Benefit Funds 电力放松管制带来的“免费”资金:获得公共福利基金的份额
Cogeneration and Competitive Power Journal Pub Date : 2001-04-01 DOI: 10.1092/FK2G-P37P-G2NC-R56W
L. Audin
{"title":"“Free” Money from Electric Deregulation: Getting Your Share of Public Benefit Funds","authors":"L. Audin","doi":"10.1092/FK2G-P37P-G2NC-R56W","DOIUrl":"https://doi.org/10.1092/FK2G-P37P-G2NC-R56W","url":null,"abstract":"ABSTRACT Amidst the ballyhoo and confusion surrounding deregulation, there is an opportunity missed by many of those who have complained the loudest about what a bust utility competition has been so far. As part of that restructuring, money is now available for energy efficiency studies, upgrades, and R&D—but energy users should move swiftly before it's gone.","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"29 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2001-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129542278","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Electric Utility Deregulation: (Two Front-page Dreams) 解除电力管制:(两个头版梦想)
Cogeneration and Competitive Power Journal Pub Date : 2000-10-01 DOI: 10.1092/CXCR-HQ7F-5P30-62J9
R. Feldman
{"title":"Electric Utility Deregulation: (Two Front-page Dreams)","authors":"R. Feldman","doi":"10.1092/CXCR-HQ7F-5P30-62J9","DOIUrl":"https://doi.org/10.1092/CXCR-HQ7F-5P30-62J9","url":null,"abstract":"","PeriodicalId":374324,"journal":{"name":"Cogeneration and Competitive Power Journal","volume":"87 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2000-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133067259","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信