Industry XplorePub Date : 2022-03-31DOI: 10.36805/teknikindustri.v7i1.1897
Andar Dhini
{"title":"PERAN PEMULUNG DALAM SISTEM PENGELOLAAN SAMPAH DI TEMPAT PENAMPUNGAN SEMENTARA (TPS) SLEMAN YOGYAKARTA","authors":"Andar Dhini","doi":"10.36805/teknikindustri.v7i1.1897","DOIUrl":"https://doi.org/10.36805/teknikindustri.v7i1.1897","url":null,"abstract":"Every year, Indonesia faces the population growth that impacted to public growth consumption and it is conduces the amount of litters. The scavenger indicated as an important role to detract the volume of litter from the initial sources. The research aims to indicate the scavengers performances who are responsible to reduce and sort the litters. The temporary disposal garbage known as TPS is one of the initial sources take place. TPS Condongcatur, TPS Tridadi and TPS Tambakboyo have the highest volume litters in Sleman, Yogyakarta. These three places used as the samples to this research. \u0000The method was adapted through SNI 19-3964-1994 followed by interview sections and questionnaires. This study took 8 days sequential and the total scavengers has interviewed was 17 people for all the places. \u0000The outcome of this study shown that the average of garbage volume in TPS Condongcatur was 18,86m³/days. TPS Tridadi has 16,31m³/days and TPS Tambakboyo 25,66m³/days for the average of garbage volumes. Whilst, The garbage percentage volume that sorted by scavengers in TPS Condongcatur was 5,4% meanwhile in TPS Tridadi was 8,23% and Tambakboyo was 22,1%. The average litter residues was 8,44% for TPS Condongcatur, TPS Tridadi was 8,05% and TPS Tambakboyo was 7,94%. The residuals garbage was opium by trucks while picked the garbage up. \u0000 ","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116145079","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2022-03-31DOI: 10.36805/teknikindustri.v7i1.1816
Yudha Pratama Adi Negoro
{"title":"SERVQUAL ANALYSIS TERHADAP KEPUASAN PELANGGAN DI BENGKEL OMEGA LESTARI MANDIRI","authors":"Yudha Pratama Adi Negoro","doi":"10.36805/teknikindustri.v7i1.1816","DOIUrl":"https://doi.org/10.36805/teknikindustri.v7i1.1816","url":null,"abstract":"Dalam usaha melayani kebutuhan pelanggan, Bengkel Omega Lestari selalu ingin meningkatkan kualitas pelayanannya. Dengan banyaknya kompetitor yang ada membuat Bengkel Omega Lestari harus dapat mempertahankan pelanggan yang diinginkan. Tujuan penelitian ini adalah untuk mengetahui tingkat kepuasan konsumen Bengkel Omega Lestari. Penelitian ini dilakukan dengan menyebarkan kuesioner kepada 85 pelanggan bengkel. Hasil kuesioner tersebut dianalisis dengan menggunakan metode SERVQUAL dan IPA. Terdapat 5 dimensi yang diukur yaitu tangibles, reliability, responsiveness, assurance, dan emphaty.hasil, berdasarkan usulan perbaikan yang Bengkel Omega Lestari adalah evaluasi dan perbaikan dari para pekerja bengkel dan melakukan kegiatan bersih-bersih lingkungan bengkel maupun peralatan yang lain agar terlihat rapi, \u0000 \u0000Kata kunci : Importance Performance Analysis; kepuasan pelanggan; SERVQUAL","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"34 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114542706","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2022-03-31DOI: 10.36805/teknikindustri.v7i1.2217
Farida Risqi Nur Safitri
{"title":"IDENTIFIKASI PROSES PRODUKSI TROLI PADA KEGIATAN PRAKTIKUM SISTEM PRODUKSI PRODI TEKNIK INDUSTRI UBP KARAWANG","authors":"Farida Risqi Nur Safitri","doi":"10.36805/teknikindustri.v7i1.2217","DOIUrl":"https://doi.org/10.36805/teknikindustri.v7i1.2217","url":null,"abstract":"Suatu produk atau komponen akan dibuat sendiri, maka diperlukan tahapan untuk menentukan bagaimana produk atau komponen tersebut akan diproduksi. Produk atau komponen yang berbeda, biasanya membutuhkan teknologi, mesin, peralatan dan proses kerja yang berbeda. Analisis proses produk memberikan deskripsi secara detil tentang proses produksi dan perakitan setiap komponen, waktu produksi, material serta peralatan yang dibutuhkan. Dalam melakukan analisis proses, selain assembly chart dan route sheet,diperlukan alat analisis lainnya seperti peta proses operasi (operation process chart/OPC). Peta kerja ini merupakan salah satu alat yang digunakan untuk memberikan informasi kegiatan kerja produksi secara sistematis. Melalui peta ini,setiap langkah dan perlakuan terhadap suatu benda kerja dapat dianalisis. Para pekerja dan operator akan mengetahui kapan harus memulai aktifitas berikutnya dengan menngacu kepada penanda yang diberikan sistem Kanban, yang dapat berupa kartu, kontainer, email, atau pesan elektronik lainnya","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127341717","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2022-03-31DOI: 10.36805/teknikindustri.v7i1.2215
Fadli Perdana
{"title":"ANALISIS RISIKO KECELAKAAN KERJA PADA STASIUN PENGISIAN LPG DENGAN MENGGUNAKAN METODE FUZZY","authors":"Fadli Perdana","doi":"10.36805/teknikindustri.v7i1.2215","DOIUrl":"https://doi.org/10.36805/teknikindustri.v7i1.2215","url":null,"abstract":"Keselamatan dan kesehatan kerja merupakan hal yang penting dan perlu diperhatikan oleh perusahaan. Terutama dalam melakukan pekerjaan yang memiliki potensi kecelakaan kerja yang cukup besar, yaitu aktifitas pengisian tabung gas LPG. Perlunya sebuah manajemen risiko pada area kerja tersebut guna untuk melakukan identifikasi dan analisa terhadap potensi kecelakaan kerja yang terdapat pada stasiun pengisian tabung gas LPG. Pada penelitian ini identifikasi risiko dilakukan dengan menggunakan metode Hazard Identification, Risk Assessment, and Risk Control (HIRARC). Dan pada tahap analisis risiko dilakukan dengan menggunakan metode Fault Tree Analysis, Event Tree Analysis dan Fuzzy untuk mendapatkan nilai risiko yang lebih akurat. Pada tahap selanjutnya yaitu menentukan prioritas risiko sebelum menerapkan mitigasi untuk pencegahan risiko yaitu dengan matriks risiko. Hasil dari analisis risiko yang telah dilakukan kemudian akan dilakukan penerapan proses mitigasi atau tindakan prefentif yang diterapkan berdasarkan matriks risiko yang pada penelitian ini didapatkan sejumlah 5 jenis risiko utama dengan 13 faktor yang teridentifikasi. Berdasarkan hasil identifikasi risiko potensi kecelakaan kerja, analisis, dan mitigasi yang dilakukan maka diharapkan penelitian ini dapat dikembangkan lebih lanjut.","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117049975","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2022-03-31DOI: 10.36805/teknikindustri.v7i1.2110
S. Aji
{"title":"IMPLEMENTASI ARC DAN ARD UNTUK MENURUNKAN OMH PADA DESAIN ULANG TATA LETAK FASILITAS LABORATORIUM","authors":"S. Aji","doi":"10.36805/teknikindustri.v7i1.2110","DOIUrl":"https://doi.org/10.36805/teknikindustri.v7i1.2110","url":null,"abstract":"Penelitian ini dilakukan dengan tujuan untuk mengetahui aliran perpindahan material untuk menghasilkan tata letak fasilitas laboratorium Quality Control pada perusahaan farmasi, untuk mengurangi jarak perpindahan dan ongkos material handling (OMH) atau biaya penanganan material. Permasalahan yang dihadapi pada tata letak awal laboratorium ini adalah aliran proses pada area kerja laboratorium yang tidak tersusun dengan baik. Jarak antar area masih belum efisien sehingga berpengaruh pada integrasi pekerjaan yang ada pada aliran proses kerja. Ketidakefisienan akibat jarak antar area ini mengakibatkan timbulnya biaya penanganan material yang cukup besar. Activity Relationship Chart (ARC) dan Activity Relationship Diagram (ARD) dilakukan berdasarkan derajat kedekatan antar fasilitas untuk kemudian dibuat tata letak usulan. Desain ulang tata letak fasilitas laboratorium dilakukan untuk menurunkan jarak perpindahan dan biaya penanganan material. Hasil penelitian dengan menggunakan ARC dan ARD didapatkan penurunan jarak perpindahan menjadi 1.718,10 meter dan biaya penanganan material (OMH) sebesar Rp2.772.240,26. Efisiensi yang dihasilkan pada layout usulan adalah sebesar 42,24% dari layout awal.","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"50 20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117174390","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2022-03-31DOI: 10.36805/teknikindustri.v7i1.2220
Iskandar Zulkarnaen
{"title":"Industry Xplore","authors":"Iskandar Zulkarnaen","doi":"10.36805/teknikindustri.v7i1.2220","DOIUrl":"https://doi.org/10.36805/teknikindustri.v7i1.2220","url":null,"abstract":"Penelitian ini membahas tentang identifikasi serta eliminasi waste (waste) di produksi akhir Perusahaan Manufacturing Casting, untuk meningkatkan produktivitas serta mengoptimalkan sumber daya yang ada pada proses produksi. Tujuan dilakukannya penelitian ini adalah untuk mengidentifikasi waste pada proses produksi, proses identifikasi waste dilakukan dengan metode waste assessment model dengan tujuan menyederhanakan pencarian permasalahan dan obyektifitas penelitian, selanjutnya untuk menentukan tools yang tepat dalam melakukan analisis dan eliminasi waste secara lebih detail digunakan metode value stream analysis tools. Hasil dari penelitian ini adalah teridentifikasi 3 waste terbesar di finishing line yaitu waste defect dengan persentase 20.61% kemudian waste over production dengan persentase 16.3 % serta waste inventory dengan persentase 15.3% berdasarkan metode waste assessment model. Selanjutnya berdasarkan metode value stream analysis tools, proses activity mapping menempati urutan pertama dengan persentase 32.96%. Rekomendasi perbaikannya adalah penggabungan quality control Inspeksi 1 dan quality control sampling Inpeksi crack pada proses produksi Fly wheel dan big hub dengan relayout line finishing big hub serta menerapkan konsep fifo pada penempatan dan pengambilan produk WIP. Metode waste assessment model dan value stream analysis tools menjadi salah satu usulan dalam mengidentifikasi serta mengeliminasi waste di finishing line Perusahaan Manufacturing Casting \u0000 ","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129019782","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2021-09-16DOI: 10.36805/teknikindustri.v6i2.1458
Muhamad Fahrurroji Muhamad Fahrurroji
{"title":"Proposed Maintenance Planning Using Reliability Centered Maintenance (RCM) at PT. Djabesmen","authors":"Muhamad Fahrurroji Muhamad Fahrurroji","doi":"10.36805/teknikindustri.v6i2.1458","DOIUrl":"https://doi.org/10.36805/teknikindustri.v6i2.1458","url":null,"abstract":"Problems that occur in the production machine at PT. Djabesmen is the frequent occurrence of engine failure that causes low engine reliability. The purpose of this study is to find out causes high breakdown in Royal Board division of PT. Djabesmen, minimize the occurrence of a breakdown on the Main machine unit, as well as recommendations on the types of appropriate maintenance actions for the machine components being examined. \u0000In this study the analytical method used is Reliability Centered Maintenance (RCM), which is a maintenance analysis method used to determine critical components and improve maintenance systems that focus on improving engine reliability. \u0000The results of this study indicate that in the main machine unit there are 15 failure modes classified into category B, 5 failure modes classified as category C, and 24 modes belonging to the D / B category. In selecting treatment actions, 23 failure modes used directed task conditions, 15 failure modes used finding filure and 6 other failure modes using the run to failure task. \u0000Keywords : Maintenance, Reliability, RCM, Main Machine, Failure","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"55 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115090054","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2021-09-16DOI: 10.36805/teknikindustri.v6i2.1749
N. Triana, Riza Muztaba, M. Sayuti, Afif Hakim
{"title":"ANALISIS OPTIMALISASI MANAJEMEN PERSEDIAAN PADA BAHAN BAKU BIJIH PLASTIK (DI PT. NISSEN CHEMITEC INDONESIA)","authors":"N. Triana, Riza Muztaba, M. Sayuti, Afif Hakim","doi":"10.36805/teknikindustri.v6i2.1749","DOIUrl":"https://doi.org/10.36805/teknikindustri.v6i2.1749","url":null,"abstract":"Material inventory as a very important thing for every company. Manufacturing companies generally have inventory to be able to provide the best service to customers. The purpose of this study is to try to achieve the minimum inventory levels possible, reduce storage costs, maximize material storage space for materials fast moving. The author uses ABC Analysis to determine the plastic ore material that is fast moving and is in class A. Then proceed with forecasting the needs of plastic ore raw materials for 2019. The Economic Order Quantity (EOQ) method is used in this study after knowing the material in class A with a percentage value of 64.20% of material requirements and to determine the quantity of inventory orders that minimize the direct cost of storing inventory, ordering costs and optimizing the frequency of ordering materials. This research is useful for companies by minimizing direct costs of inventory storage, ordering costs and optimizing the frequency of ordering materials. PT. Nissen Chemitec Indonesia usually orders material in 1 year, 12 times material orders, which means that every month the company will order materials. In this analysis, forecasting of material needs is carried out for September 2019 to December 2019 because from the January to August period the company has purchased material. Material purchase with a lead time of 14 days for all types of material. Before using the EOQ method, the total inventory cost of raw materials is Rp. 2,286,376.58 and the company does not have a safety stock. If using the EOQ method the total inventory cost of raw materials is Rp. 812,009 with a frequency of ordering 1 time in 4 months period. The safety stock is 1,095 kg, and the reorder point is if the raw material is at the amount of 2,618 kg. This research is expected to minimize procurement costs and optimize the number of purchases that can be used at PT. Nissen Chemitec Indonesia so that all raw material procurement processes can be better for the company. \u0000 ","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116742111","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2021-09-16DOI: 10.36805/teknikindustri.v6i2.1475
Beni Beni
{"title":"ANALISIS PERANCANGAN ALAT BANTU BONGKAR YANG ERGONOMIS DAN MENGURANGI BIAYA DEBIT NOTE UNTUK PRODUK REMOT MODEL V6 DI PT. HEI","authors":"Beni Beni","doi":"10.36805/teknikindustri.v6i2.1475","DOIUrl":"https://doi.org/10.36805/teknikindustri.v6i2.1475","url":null,"abstract":"Di berbagai industri, banyak proses produksi yang masih dikerjakan secara manual sehingga tenaga kerja manusia merupakan peranan yang sangat penting. Terkadang pada perancangan sistem kerjanya, beban dan yang diterima pekerja kurang diperhitungkan apakah dalam batas aman artinya sesuai dengan keterbatasan dan kemampuan manusia atau tidak. Penelitian ini dilakukan di PT.HEI yang bergerak dalam bidang industri elektronik. Berdasarkan hasil penelitian dan pengolahan data dengan metode ergonomi maka diketahui data antropometri yang digunakan untuk merancang perancangan alat bantu bongkaran remote v6 yang ergonomis adalah Tp, Tsb dan Ps. Besar ukuran antropometri tubuh pekerja setelah pengolahan data dengan menggunakan persentil 5, persentil 50 dan persentil 95 yang digunakan untuk acuan perancangan didapatlah dimensi ukuran masing-masing yaitu: Tp 94,2cm, Tsb 100,2 cm dan Ps 20,4 cm. Selain itu dari hasil perhitungan, rata-rata selisih penurunan NG bongkaran remot v6 didapat rata-rata sebelum menggunakan alat jumlah NG 12,3 dan sesudah menggunakan alat menjadi rata-rata 1,5 jumlah NG. Biaya debit note yang dikeluarkan perusahaan per 10 hari pengerjaan bongkaran remote v6 sebelum menggunakan alat sebesar Rp. 2.583.000 dan setelah .menggunakan alat sebesar Rp.378.000. Maka untuk memecahkan masalah tersebut perlu dirancang perancangan alat yang sesuai dimana hasil data ukuran persentil digunakan dalam perancangan alat dan dalam rancangan pembuatan alat bahan yang digunakan adalah As Alumunium Ø 10 mm x p 350 mm, Plat Besi 100 x 100 x 1,5 mm, Plat Dural Alumunium 155 x 70 x 140 mm dan Stainless Ø 0.8 x 50 mm dengan total harga pembuatan alat sebesar Rp.1.276.060. \u0000 ","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"147 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129104175","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Industry XplorePub Date : 2021-09-16DOI: 10.36805/teknikindustri.v6i2.1538
Aminah Haddadde, Muhamad Sayuti, Dicky Suryapranatha, Karya Hidayat
{"title":"PENENTUAN KEBUTUHAN PERSEDIAAN OBAT GENERIK DENGAN METODE MATERIAL REQUIRMENT PLANING DAN MODEL OPTIMASI PADA LOGISTIK FARMASI DI RUMAH SAKIT DELIMA ASIH KARAWANG","authors":"Aminah Haddadde, Muhamad Sayuti, Dicky Suryapranatha, Karya Hidayat","doi":"10.36805/teknikindustri.v6i2.1538","DOIUrl":"https://doi.org/10.36805/teknikindustri.v6i2.1538","url":null,"abstract":"Penelitian ini membahas tentang pengaruh manajemen logistik farmasi terhadap pengelolaan persediaan obat di rumah sakit untuk mengoptimalkan perencanaan dan persediaan obat di rumah sakit.. Salah satu strategi untuk memperolehnya adalah dengan merencanakan keputusan yang efisien mengenai kuantitas obat yang dipesan dan waktu pemesanan dapat mencapai total biaya seminimal mungkin dalam pengelolaan persediaan obat dan terpenuhinya permintaan obat dari pasien. Rumah sakit penting melakukan pengelolaan persediaan obat karena sifat obat pada penelitian ini yang sering digunakan maka persediaan harus terkontrol untuk menghindari kehabisan obat atau stockout. Metode yang digunakan dalam penelitian ini adalah Material Requirement Planning (MRP) untuk mengetahui permintaan persediaan obat generik model optimasi dengan Mixed Integer Linear Programming (MILP) dan Analisis Sensitivitas. Hasil dari penelitian ini adalah manajemen logistik farmasi di RS delima asih karawang masih terjadi kekurangan obat sehingga pihak rumah sakit mengambil tindakan dalam pembelian obat secara urgensi ke pihak-3 dengan biaya lebih besar. Pengendalian persediaan obat di RS delima asih belum memenuhi kebutuhan persediaan obat dengan dilihat dari 10 obat generik yang diteliti dan 3 diantaranya mengalami kehabisan yaitu Ethambutol 500 Mg (-827 pcs), Pyrazinamide 500 Mg (-513 pcs), Simvastatin 20 Mg (-141 pcs), dan sisianya mengalami stagnan. Motode MRP dan model optimasi menjadi salah satu usulan dalam pengendalian persediaan dimana hasil dari peritungan keduanya telah memenuhi kebutuhan persediaan obat di RS delima asih karawang.","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"22 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121045006","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}