2009 Agile Conference最新文献

筛选
英文 中文
Adopting an Agile Culture 采用敏捷文化
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.47
Lily Cho
{"title":"Adopting an Agile Culture","authors":"Lily Cho","doi":"10.1109/AGILE.2009.47","DOIUrl":"https://doi.org/10.1109/AGILE.2009.47","url":null,"abstract":"Success in adopting an agile culture depends on the organization’s ability to adapt, while at the same time establishing common objectives and principles across the organization. This experience report observes this theme via the lens of a project team at Liquidnet, specifically through the user experience group.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"54 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128814408","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 19
Influence of Large-Scale Organization Structures on Leadership Behaviors 大型组织结构对领导行为的影响
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.14
Erik L. Moore
{"title":"Influence of Large-Scale Organization Structures on Leadership Behaviors","authors":"Erik L. Moore","doi":"10.1109/AGILE.2009.14","DOIUrl":"https://doi.org/10.1109/AGILE.2009.14","url":null,"abstract":"In a large agile organization (more than three teams or 30 team members) with self-organized empowered teams, R&D leadership roles are still needed to support teams through topics including resource management and strategic vision. This experience report will highlight these R&D leadership roles, describe flat, hierarchical, and matrix R&D organization structures, and then illustrate the influence of these organizational structures on key leaderships behaviors for an agile environment. These behaviors include leading versus managing, flexing existing team boundaries, driving both team and project success, and balancing team versus individual needs. The report concludes that while some organizations structures are more supportive in an agile environment, the organization structure is less important than identifying leaders who demonstrate those key leadership behaviors.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126695981","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Adopting Agile in an FDA Regulated Environment 在FDA监管的环境中采用敏捷
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.50
R. Rasmussen, T. Hughes, J. Jenks, J. Skach
{"title":"Adopting Agile in an FDA Regulated Environment","authors":"R. Rasmussen, T. Hughes, J. Jenks, J. Skach","doi":"10.1109/AGILE.2009.50","DOIUrl":"https://doi.org/10.1109/AGILE.2009.50","url":null,"abstract":"This paper is an experience report describing Abbott’s adoption of agile software development practices in its molecular diagnostics division. We will compare two medical device projects; one before agile and one after. Both of these projects required submission to the FDA (the U.S. Food and Drug Administration). We will describe the adoption of agile practices from realization of the need to the selection of a mentor to implementation and fine-tuning and finally to results and lessons learned. This experience has convinced us that an agile approach is the approach best suited to development of FDA-regulated medical devices.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"12 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116773200","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 59
The Amazing Team Race A Team Based Agile Adoption 基于团队的敏捷采用
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.67
Gabino M. Roche, Belkis Vasquez-McCall
{"title":"The Amazing Team Race A Team Based Agile Adoption","authors":"Gabino M. Roche, Belkis Vasquez-McCall","doi":"10.1109/AGILE.2009.67","DOIUrl":"https://doi.org/10.1109/AGILE.2009.67","url":null,"abstract":"In 2008, our organization successfully implemented an agile software development approach (Scrum) across the Application Development department after piloting Scrum in 2007 with a few projects. In just four months, our department consisting of over 200 contractors and 70 full time employees transitioned from a traditional waterfall-style approach (RUP) to Scrum. Less then 2 months later, we were running 40 development projects that were time boxed to three months. In the previous year, we had 20 active projects with duration of 9 to 18 months. After a year of introducing Agile, members of our organization were well aware of what Scrum was, but growing weary of training. There was a clear need to create excitement around the adoption and scaling of Scrum within the application development group. This led us to develop what we called ‘The Amazing Team Race.’ This experience report is about how an agile transition team used a team-based approach for creating excitement while scaling Scrum in a globally distributed organization.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123681647","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Roadmap Transformation: From Obstacle to Catalyst 路线图转型:从障碍到催化剂
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.71
David Wilby
{"title":"Roadmap Transformation: From Obstacle to Catalyst","authors":"David Wilby","doi":"10.1109/AGILE.2009.71","DOIUrl":"https://doi.org/10.1109/AGILE.2009.71","url":null,"abstract":"When charting new territory – enterprise-scale Agile – traditional roadmaps only take you so far. When landscapes change in weeks, product management must find a way to reconcile sprint plans and backlogs from multiple teams with longer-term product direction. In this paper, I will share how my teams tackled the roadmap challenge during Borland’s Agile transformation. I’ll cover how roadmaps became a barrier to scaling Agile, how we adopted Agile road mapping, the challenges we faced and the impact the new practices have had on our Agile transformation.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"61 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129352151","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Feature Teams Collaboratively Building Products from READY to DONE 功能团队协作构建产品从准备到完成
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.51
André Frank, Charles Hartel
{"title":"Feature Teams Collaboratively Building Products from READY to DONE","authors":"André Frank, Charles Hartel","doi":"10.1109/AGILE.2009.51","DOIUrl":"https://doi.org/10.1109/AGILE.2009.51","url":null,"abstract":"In this paper we describe our Project Team’s journey from a process where design and planning work was performed away from development team to one where small cross-functional Feature Teams self-organized to complete design, planning, and construction within the same sprint. We introduced a process that allows User Interaction Designers and Business Analysts to work in sync with the Developers and QA Analysts within a sprint. Each member of the Feature Team is involved in getting READY, planning, executing and being DONE. By introducing this process, we observed an increase in team morale, better, more predictable results and accumulation of less debt, while at the same time maintaining a constant velocity. Our process is a deviation from the established approach where upfront work needs to be ready before starting a sprint.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121039445","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Shock Therapy: A Bootstrap for Hyper-Productive Scrum 休克疗法:高效Scrum的引导
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.28
J. Sutherland, Scott Downey, Bjorn Granvik
{"title":"Shock Therapy: A Bootstrap for Hyper-Productive Scrum","authors":"J. Sutherland, Scott Downey, Bjorn Granvik","doi":"10.1109/AGILE.2009.28","DOIUrl":"https://doi.org/10.1109/AGILE.2009.28","url":null,"abstract":"A properly implemented Scrum framework enforces a few simple constraints that cause a team to self-organize into a state that achieves 5 to 10 times waterfall performance. Yet the majority of Scrum teams never achieve this design goal. Teams do not know how to sequence work to deliver working software at the end of a sprint. They do not know how to work with a Product Owner to get the backlog in a ready state before bringing it into a sprint and do not know how to self-organize into a hyper-productive state during a sprint. A pattern is emerging at MySpace in California and Jayway in Sweden, for bootstrapping high performing Scrum teams. Rigorous implementation of Scrum by an experienced coach creates a total immersion experience akin to Shock Therapy. Teams are trained on exactly how to implement Scrum with no deviations for several sprints. These teams consistently achieve better than 240% improvement in velocity within a few weeks. They are then able to self-organize on their own to continue to improve performance. For many developers and managers, the experience is a wake up call to agile awareness. Unfortunately, management tends to disrupt hyper-productive teams by disabling key constraints in the Scrum framework. Team velocity then falls back into mediocrity. Velocity data is provided on five hyper-productive teams at MySpace and one team at Jayway. In all but one case, management “killed the golden goose.”","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"24 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116900029","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 29
Iterating a Team in Flux 在Flux中迭代团队
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.39
Sharlene McKinnon
{"title":"Iterating a Team in Flux","authors":"Sharlene McKinnon","doi":"10.1109/AGILE.2009.39","DOIUrl":"https://doi.org/10.1109/AGILE.2009.39","url":null,"abstract":"Imagine yourself with a team that flies in from AU, the UK, and the US in bi-weekly shifts to work with a communications firm. Mix in inexperience, bad behaviours, vague program direction, and a mandated intro to Agile in a silo-ed non-agile environment. Couple this with a capability driven team whose focus is to assist other teams to drive out SOA: and you have a recipe for a Team in Flux.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"33 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134031756","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Strategies for Replacing Systems in Agile Projects 敏捷项目中替换系统的策略
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.15
Niklas Bjornerstedt
{"title":"Strategies for Replacing Systems in Agile Projects","authors":"Niklas Bjornerstedt","doi":"10.1109/AGILE.2009.15","DOIUrl":"https://doi.org/10.1109/AGILE.2009.15","url":null,"abstract":"In replacement projects one of the biggest questions is what strategy to use in replacing the old system. The simplest strategy is to wait until the new system is “at least as good as the old one” before switching. Although this strategy sounds compelling it has many serious drawbacks. An alternative strategy is based on what I call a “Minimal Deployable Entity”. Switch systems when you have just enough to be able to survive with the new system. The concept is similar to “Minimal Marketable Feature” but more focused on deployment strategy. This paper uses two projects as concrete examples of patterns and principles that can be used to define a strategy for a Minimal deployable entity.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122703974","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
How Being Agile Changed Our Human Resources Policies 敏捷如何改变我们的人力资源政策
2009 Agile Conference Pub Date : 2009-08-24 DOI: 10.1109/AGILE.2009.49
Clement James Goebel
{"title":"How Being Agile Changed Our Human Resources Policies","authors":"Clement James Goebel","doi":"10.1109/AGILE.2009.49","DOIUrl":"https://doi.org/10.1109/AGILE.2009.49","url":null,"abstract":"Menlo Innovations adopted agile software development practices in order to build highly effective software development teams that could produce software for Menlo’s clients. As client needs changed during projects, it was often appropriate to change the size of the team working on the project. In order to accommodate the effective integration of new staff, and to remain productive when staffing was reduced, knowledge transfer skills became critical. Menlo found that many of the agile engineering practices, when performed well, form the basis for effective knowledge transfer. What Menlo did not expect was that the flexibility provided by being able to move resources from project to project would ultimately allow the ability to offer creative human resource policies. These policies have resulted in Menlo winning many awards, including the Alfred P Sloan Award for Workforce Flexibility.","PeriodicalId":280848,"journal":{"name":"2009 Agile Conference","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123949853","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信