Alvin Januar Haryono, Njo Anastasia, Jani Rahardjo
{"title":"EFFECT OF FINANCIAL ABILITY OF FIRST-TIME HOME BUYERS ON HOUSE PRICES WITH PARENTAL FINANCIAL ASSISTANCE","authors":"Alvin Januar Haryono, Njo Anastasia, Jani Rahardjo","doi":"10.9744/duts.6.2.14-25","DOIUrl":"https://doi.org/10.9744/duts.6.2.14-25","url":null,"abstract":"Rumah merupakan salah satu kebutuhan primer. Membeli rumah merupakan salah satu keputusan penting dalam rumah tangga karena nilainya yang besar dan merupakan nilai terbesar dalam portofolio aset keluarga. Namun keterbatasan finansial menjadi salah satu penghambat dalam suatu keluarga untuk membeli rumah. Oleh sebab itu perlunya bantuan finansial orang tua dalam pembelian rumah pertama anaknya. Sehingga penelitian ini bertujuan untuk mengetahui keterlibatan orang tua dalam proses pendanaan pembelian rumah pertama anaknya serta seberapa besar pengaruh bantuan finansial orang tua kepada anaknya dalam membeli rumah pertama kali. Hasil dari penelitian ini menunjukkan bahwa orang tua terlibat dalam pembelian rumah pertama kali untuk anaknya sesuai dengan pendapatannya dan bentuk bantuan yang diberikan. Dari 212 responden, sebagian besar yaitu sebanyak 72,2% orang tua terlibat dalam proses pendanaan rumah pertama anaknya. Rata-rata besar kontribusi bantuan finansial orang tua sebesar 44,4% dari harga rumah. \u0000 \u0000The house is one of the primary needs. Buying a home is one of the important decisions in a household because it has a large value and is the biggest value in a family's asset portfolio. But financial limitations become one of the obstacles in a family to buy a house. Therefore the need for financial assistance from parents for the first time buying a home for their children. So this study aims to determine the involvement of parents in the process of funding their first-time home purchase and how much influence the financial assistance of parents to their children in first-time buying a home. The results of this study indicate that parents are involved in first-time home purchases for their children according to their income and the form of assistance provided. From 212 respondents, the majority of which is as much as 72.2% of parents involved in the first-time home funding process for their children. The average contribution of parents' financial assistance was 44.4% of the price of the house.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"100 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127205969","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Faktor-Faktor Yang Mempengaruhi Keputusan Calon Pembeli Dalam Melakukan Pembelian Apartemen Mewah di Surabaya","authors":"Williams Dennis Masamitsu","doi":"10.9744/duts.6.2.38-48","DOIUrl":"https://doi.org/10.9744/duts.6.2.38-48","url":null,"abstract":"Williams Dennis Masamitsu: \u0000Postgraduate Thesis \u0000Factors That Influence Prospective Buyer's Decisions to Buy Luxury Apartment in Surabaya \u0000 \u0000This research aims to find out factors that influence prospective buyer’s decision to buy luxury apartment in Surabaya. Data which were collected through online survey from 68 respondent from various city in Indonesia who have the desire to buy luxury apartments in Surabaya. Research gap in this study is that researchers add 2 new variables that have not been studied before. These variables are the another apartments costs and property management. \u0000This type of research is quantitative causal. This research used regression models to analyze the effect of price and scheme, another apartment costs, motivation, lifestyle, environment and relation, location, facility, building design and structure, property management, and promotion on prospective buyers to buying decision to luxury apartment in Surabaya. The result showed that simultaneously all the variable have positive and significant influence on consumer buying decision. Partially, the result showed that environment and relation, building design and structure, and property management has the most dominant effect on prospective buying","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126812557","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"OPTIMASI TOPOLOGI DAN UKURAN PENAMPANG STRUKTUR RANGKA BATANG BAJA DENGAN METODE METAHEURISTIK","authors":"Ricky Hartono","doi":"10.9744/duts.6.1.33-42","DOIUrl":"https://doi.org/10.9744/duts.6.1.33-42","url":null,"abstract":"Optimasi topologi dari struktur rangka batang baja memberikan hasil yang lebih optimal dibandingkan optimasi ukuran penampang karena batang dan nodes yang tidak berguna pada struktur dapat dihilangkan. Fungsi objektif dari algoritma metaheuristik adalah untuk meminimalkan massa struktur rangka batang baja terhadap constraints statis dan dinamis berdasarkan studi kasus dan spesifikasi bangunan baja struktural Indonesia, SNI 1729:2015. Empat algoritma yang digunakan pada studi ini adalah: Particle Swarm Optimization, Differential Evolution, Teaching-Learning-Based Optimization, dan Symbiotic Organisms Search. Keempat algoritma tersebut diuji pada studi kasus 24-bar truss. Performa dari algoritma diukur dari lima kriteria massa, yaitu: massa terbaik, terburuk, rata-rata, standar deviasi, dan median dari struktur rangka batang baja. Hasil penelitian menunjukkan SOS menunjukkan performa terbaik pada studi kasus 24-bar truss.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126070241","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Faktor-Faktor yang Mempengaruhi Kualitas Konstruksi Rumah Menengah dan Mewah di Surabaya","authors":"Ambrosius Mintardjo","doi":"10.9744/duts.6.1.17-24","DOIUrl":"https://doi.org/10.9744/duts.6.1.17-24","url":null,"abstract":"The quality factor is considered when people will buy a house. People are willing to pay more for good quality house, as it will have high value to resell. Hence, it is important to realize quality factor in construction. The respondent answered how was the house construction quality in Surabaya and factors affecting it. The result of this research found 8 expected factors that affects the middle and high-end landed house construction quality in Surabaya. These factors were budget allocation for quality management and occupational health and safety, comprehensive review to the architecture and structure design, supplier management, process management, human resource management, written working standard, customer satisfaction oriented, and proper construction specification and drawing. Out of 8 factor, there was only 1 factor that affects the most, it was proper construction specification and drawing. This research also found there was a difference in factors affecting middle & high-end landed house construction quality in Surabaya.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129460120","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"PENGGUNAAN METODE TAKT TIME UNTUK PERENCANAAN JADWAL PEKERJAAN FINISHING DAN MEKANIKAN ELEKTRIKAL PLUMBING PADA SEBUAH PROYEK APARTEMEN","authors":"Vedi Wihono Susilo","doi":"10.9744/duts.6.1.25-32","DOIUrl":"https://doi.org/10.9744/duts.6.1.25-32","url":null,"abstract":"ABSTRAK: Penjadwalan merupakan suatu hal yang sangat penting karena akan menentukan sebuah proyek selesai pada waktu yang ditentukan atau malah melebihi dari yang ditentukan, apabila melebihi dari yang ditentukan maka akan terkena sanksi. Penelitian ini dilakukan studi kasus pada proyek apartemen yang berlokasi di Surabaya bagian barat dimana metode yang dilakukan adalah dengan menggunakan takt time planning pada pekerjaan finishing dan MEP. Data-Data yang dibutuhkan didapatkan dengan cara meminta kepada chief engineering dan setelah data tersebut didapatkan maka diolah menjadi suatu perencanaan baru dengan menggunakan metode takt time planning. Dalam pengolahannya dibutuhkan koordinasi dengan orang-orang dilapangan supaya tidak terjadi kendala pada saat pelaksanaan nya sehingga dapat menghasilkan hasil yang diharapkan. Hasil dari penelitian ini didapatkan bahwa perencanaan dengan menggunakan metode takt time yaitu terjadinya keselarasan dalam tiap-tiap pekerjaan selain itu juga dapat mempercepat durasi proyek sebesar 1 minggu dari perencaan awal.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"106 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129882007","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANALISA ASPEK-ASPEK DALAM PROSEDUR CHANGE ORDER PADA PROYEK KONSTRUKSI","authors":"Michael Halmar Kosasi, Andi Andi, Lie Arijanto","doi":"10.9744/DUTS.6.1.9-16","DOIUrl":"https://doi.org/10.9744/DUTS.6.1.9-16","url":null,"abstract":"Change order merupakan perubahan kondisi kontrak yang mengubah harga, dan schedule proyek. Penelitian sebelumnya menunjukan claim change order mencapai 50% dari keseluruhan claim, dimana 76% diantaranya merupakan change order lisan dan separuhnya mengalami kegagalan claim. Tujuan penelitian adalah mengetahui berbagai aspek dalam prosedur change order. Metode penelitian yaitu dengan membuat kuesioner berdasarkan literatur terhadap “frekuensi kejadian” dan “tingkat kepentingan”. Data dianalisa deskriptif untuk mendalami kondisi proyek dan literatur beserta penyebabnya secara mendalam, yang kemudian dilakukan analisa perbedaan kontraktor dan MK melalui uji T-Test. Berdasarkan analisa diketahui saat identifikasi, change order diprakarsai owner, kontraktor, MK dengan site instruction, selanjutnya kontraktor harus mengajukan proposal gambar, spesifikasi, harga, dokumentasi. Selanjutnya owner akan mengevaluasi harga satuan dan mengukur volume bersih berdasar perubahan gambar. Pada tahapan approval, owner memberikan tanda tangan berdasarkan harga yang disetujui. Payment dilakukan dengan invoice terpisah sesuai progress change order beserta biaya tidak langsung, sedangkan tambahan waktu diberikan dalam hari kalender \u0000 \u0000Change orders are changes in contract conditions change prices, and the project schedule. Previous research shows change order claims reaches 50% of total claim, where 76% given in verbal, and half have failed. The research objective is to determine the various aspects of the change order procedure. The research method is to create a questionnaire based on the literature of the \"frequency of occurrence\" and \"level of interest\". Data were analyzed descriptively to explore the conditions of the project and literature and how it happens, analyzed the differences contractors and MK through T-Test. Based on the analysis found that identification phase, change orders initiated by the owner, the contractor, MK with site instruction, then the contractor must submit a proposal drawings, specifications, price, documentation. Next phase, owner will evaluate the unit price and measuring the net volume based on changes drawing. At approval phase, owner provides a signature based on the agreed price. Payment is done by a separate invoice based on progress including indirect costs, while additional time is given in calendar days.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"106 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133433259","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ANALISA QUANTITY TAKE-OFF DENGAN MENGGUNAKAN AUTODESK REVIT","authors":"Danny Laorent, Paulus Nugraha, Januar Budiman","doi":"10.9744/DUTS.6.1.1-8","DOIUrl":"https://doi.org/10.9744/DUTS.6.1.1-8","url":null,"abstract":"Quantity Take-Off merupakan salah satu upaya dari kontraktor dengan melakukan perhitungan volume, yang nantinya akan digunakan sebagai bahan untuk menyusun BQ dalam tender dan nantinya juga dijadikan bahan untuk melakukan procurement. Oleh sebab kontraktor yang dapat melakukan quantity take-off dengan akurat akan mendapatkan beberapa keuntungan seperti pengefisiensian material yang datang karena sesuai dengan aktual. Autodesk Revit merupakan sebuah tools atau aplikasi yang berbasis Building Information Modeling (BIM) yang mampu melakukan quantity take-off. Dalam penelitian ini akan dibahas bagaimana kelebihan dan kelemahan dari Autodek Revit dalam melakukan quantity take-off pada volume beton, bila dibandingkan dengan metode yang selama ini dipakai, yaitu menghitung volume dengan menggunakan gambar dari Autocad dan dengan bantuan Microsoft Excel. Hasil dari penelitian ini menunjukkan bahwa Autodesk Revit dapat melakukan quantity take-off dengan baik dan memiliki beberapa kelebihan seperti, memiliki efisiensi terhadap waktu karena dapat menghitung volume dengan lebih cepat dibandingkan dengan metode sebelumnya, apalagi bila terdapat perubahan desain. Akan tetapi dalam membuat permodelan pada Revit membutuhkan waktu yang cukup lama dan harus teliti agar memperoleh hasil yang akurat. \u0000 \u0000Quantity Take-Off is one of the efforts of contractors to make calculations volume, which will be used as the object for making Bill of Quantity in the tender and will also be made to make procurement. Therefore contractors who can do quantity take-off accurately will get some advantages such as efficiency material that came as it was in accordance with the actual. Autodesk Revit is a tools or application based on Building Information Modeling (BIM) which is capable of performing quantity take-off. In this research will be discussed how advantages and deficiency of Autodek Revit in quantity take-off to calculate concrete volume, when compared with the method that have been used, it is calculating volume using image from Autocad and help with Microsoft Excel. Result of this research showed that Autodesk Revit can do quantity take-off with good and has a number of advantages such as, have efficiency to the time because they can calculate volume with more rapidly than method before, especially if there is a redesign. But in making modeling in Revit takes a lot of time for a long time to have a careful and is to be accurate results. ","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"21 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132538475","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"KAJIAN PENERAPAN PRINSIP WATER CONSERVATION SESUAI STANDAR GREENSHIP NEW BUILDING VERSI 1.2 STUDI KASUS: GEDUNG P1 DAN P2 UNIVERSITAS KRISTEN PETRA SURABAYA","authors":"S. Teddy","doi":"10.9744/DUTS.5.2.9-16","DOIUrl":"https://doi.org/10.9744/DUTS.5.2.9-16","url":null,"abstract":"Isu green building dewasa ini menjadi sangat penting untuk diterapkan. Alasan utamanya adalah karena bangunan mengkonsumsi begitu banyak sumber daya alam, di tengah-tengah krisis energi dan air yang sedang melanda dunia. Penelitian ini dimaksudkan untuk mengetahui seberapa besar penghematan air yang dapat dicapai oleh gedung P1 dan P2 dengan menerapkan konsep penggunaan fitur hemat air, rainwater harvesting, serta daur ulang grey water. Penghematan ini berkaitan dengan jumlah poin yang berpotensi diperoleh gedung P1 dan P2 untuk credit WAC 1 sampai dengan WAC 6 menurut Greenship New Building Versi 1.2. \u0000 \u0000Untuk memprediksi penggunaan air di gedung P1 dan P2, dilaksanakan survei melalui kuesioner. Pengguna gedung P, W, dan T Universitas Kristen Petra Surabaya dipilih secara acak sebagai responden. Dari hasil kajian, desain asli gedung P1 dan P2 berpotensi memperoleh 17 poin untuk kategori water conservation dari total 20 poin. Usulan-usulan diberikan untuk menyempurnakan desain gedung P1 dan P2 sehingga bisa mencapai perolehan 20 poin maksimum. \u0000 \u0000Nowadays, green building issue has become very important. The main reason is that buildings consume much of natural resources, in the middle of world energy and water crisis which is happening around the world. The goal of this research is to find out how much water saving that P1 and P2 building can achieve by applying the concepts of water saving fixture usage, rainwater harvesting, and grey water recycling. This saving is related to how many points that bulding can potentially achieve for WAC 1 to WAC 6 credit according to Greenship for New Building version 1.2 standard. \u0000 \u0000To predict water consumption at P1 and P2 buildings, a questionnaire survey was conducted. Occupants of P, W, and T buildings of Petra Christian University Surabaya were randomly chosen as respondents. As the result of this research, P1 and P2 building original design is potential to achieve 17 points out of total 20 points. Suggestions are proposed to perfect the design of P1 and P2 building in order to achieve maximum 20 points.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129285520","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"PEMANFAATAN INFORMASI BERDASARKAN PORTER’S FIVE FORCES DALAM BISNIS FABRIKASI BAJA UNTUK MENDAPATKAN KEUNGGULAN BERSAING","authors":"Kristiawan Hengki Kusuma","doi":"10.9744/DUTS.5.2.26-33","DOIUrl":"https://doi.org/10.9744/DUTS.5.2.26-33","url":null,"abstract":"Saat ini perusahaan fabrikasi baja telah menyadari pentingnya penggunaan informasi sebagai sebuah tools baru untuk mendapatkan keunggulan bersaing dengan kompetitor. Namun sayangnya penggunaan informasi ini masih diterapkan secara konvensional, yaitu penggunaan informasi yang hanya terbatas pada penggunaan IT, tanpa menyadari sebenarnya penggunaan informasi masih menyimpan banyak potensi besar jika digunakan secara optimal. \u0000Penggunaan Informasi yang “asal pakai” tidak hanya kurang efektif namun juga seringkali menimbulkan permasalahan baru. Hasil penyajian data yang diolah oleh orang IT seringkali tidak sesuai dengan tujuan yang ingin dicapai oleh manajemen perusahaan karena perbedaan penafsiran, adapun hasil pengolahan data seringkali juga dapat menimbulkan kesalahpahaman antar pihak manajemen. \u0000Pada penelitian ini akan dicoba pemanfaatan Informasi dengan menggunakan bantuan Porter’s Five Forces sebagai alat bantu untuk mendapatkan keunggulan bersaing. Akan dijelaskan juga bagaimana cara untuk mengumpulkan informasi apa saja yang ada di dalam business process yang dibutuhkan dalam perusahaan dan bagaimana cara mengolah data ini menjadi keunggulan bersaing bagi perusahaan fabrikasi. \u0000 \u0000Nowadays, steel fabricator has realized the importance of the use of information as a new tools to gain the competitive advantages with competitors. Unfortunely the use odf the information is still applied in an unconventional manner, the use of information are limited only to IT, without realizing actual use information has a lot of great potential if used optimally. \u0000The “reckless” use of information was not only less effective but also often lead to new problems. The result of data processed by IT’s, usually are not in line with the purpose to be achieved by company management due the differences in the interpretation of the concept, and as for the results of data processing can also cause misunderstanding between management. \u0000On this research will try the utilization of information by using Porter’s Five Forces as the tools to gain the competitive advantages. It will be explained also how to collect all information in business process that required in company and how to process this data to be competitive advantages for steel fabrication company.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"74 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124848868","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"PEMODELAN PENJADWALAN LINIER DENGAN ALOKASI SUMBER DAYA MANUSIA PADA PROYEK PERUMAHAN","authors":"Hedwig Angdiarto Tan, R. S. Alifen","doi":"10.9744/DUTS.5.2.41-47","DOIUrl":"https://doi.org/10.9744/DUTS.5.2.41-47","url":null,"abstract":"Metode penjadwalan linier cocok untuk proyek dengan aktivitas sederhana, dan repetitif dengan jumlah unit yang tipikal, seperti proyek jalan, irigasi, tunnel, apartment, dan perumahan sederhana. Pada penelitian ini dilakukan pemodelan penjadwalan linier proyek pembangunan perumahan sebanyak 50 unit tipikal. Simulasi alokasi sumber daya manusia dan penggunaan buffer agar penggunaan sumber daya manusia dapat seefisien mungkin. \u0000Hasil penelitian diperoleh bahwa simulasi ke-8 dengan menggunakan buffer memiliki durasi 314 hari dengan 18 kelompok kerja, apabila dibandingkan dengan simulasi ke-9 tanpa menggunakan buffer memiliki durasi 180 hari dan idle time 134 hari inefisiensi 1522 orang hari. \u0000 \u0000Linear scheduling method is suitable for projects with repetitive activities, as well as tipical mass product units such as a road, apartment, and residential housings. In this research linear schedule modeling was carried out on residential typical housings project of 50 units. The simulation of linear scheduling is to minimize the idle times by using time buffers and human resources allocation so that the usage of human resources can be as efficient as possible. \u0000The research findings show that the 8th simulation by using buffers has a project duration of 314 days were chosen with 18 working groups, compares to 9th simulation without buffers that has a duration of 180 days and 134 days of idle time which with 1522 man day of inefficient.","PeriodicalId":187066,"journal":{"name":"Dimensi Utama Teknik Sipil","volume":"108 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115157535","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}