Engineering, Construction and Architectural Management最新文献

筛选
英文 中文
The relationship between construction workers’ emotional intelligence and safety performance 建筑工人的情商与安全绩效之间的关系
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-04-05 DOI: 10.1108/ecam-07-2023-0747
Wenwei Huang, Deyu Zhong, Yanlin Chen
{"title":"The relationship between construction workers’ emotional intelligence and safety performance","authors":"Wenwei Huang, Deyu Zhong, Yanlin Chen","doi":"10.1108/ecam-07-2023-0747","DOIUrl":"https://doi.org/10.1108/ecam-07-2023-0747","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Construction enterprises are achieving the goal of production safety by increasingly focusing on the critical factor of “human” and the impact of individual characteristics on safety performance. Emotional intelligence is categorized into three models: skill-based, trait-based and emotional learning systems. However, the mechanism of action and the internal relationship between emotional intelligence and safety performance must be further studied. This study intends to examine the internal mechanism of emotional intelligence on safety performance in construction projects, which would contribute to the safety management of construction enterprises.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A structural equation model exploring the relationship between emotional intelligence and safety performance is developed, with political skill introduced as an independent dimension, situational awareness presented as a mediator, and management safety commitment introduced as a moderator. Data were collected by a random questionnaire and analyzed by SPSS 24.0 and AMOS 26.0. The structural equation model tested the mediation hypothesis, and the PROCESS macro program tested the moderated mediation hypothesis.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results showed that construction workers' emotional intelligence directly correlates with safety performance, and situational awareness plays a mediating role in the relationship between emotional intelligence and the safety performance of construction workers. Management safety commitment weakens the positive predictive relationships between emotional intelligence and situational awareness and between emotional intelligence and safety performance.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This research reveals a possible impact of emotional intelligence on safety performance. Adding political skills to the skill-based model of emotional intelligence received a test pass. Political skill measures the sincere and cooperative skills of construction workers. Using people as a critical element plays a role in the benign mechanism of “Emotional Intelligence – Situational Awareness – Safety Performance.” Improving emotional intelligence skills through training, enhancing situational awareness, understanding, anticipation and coordination and activating management environment factors can improve safety performance. Construction enterprises should evaluate and train workers' emotional intelligence to improve workers' situational awareness and safety performance.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"263 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591142","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Dynamic assessment of the abatement effects of the low-carbon practices in the prefabricated building supply chain 对预制建筑供应链中低碳做法的减排效果进行动态评估
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-04-05 DOI: 10.1108/ecam-08-2023-0872
Qiang Du, Yerong Zhang, Lingyuan Zeng, Yiming Ma, Shasha Li
{"title":"Dynamic assessment of the abatement effects of the low-carbon practices in the prefabricated building supply chain","authors":"Qiang Du, Yerong Zhang, Lingyuan Zeng, Yiming Ma, Shasha Li","doi":"10.1108/ecam-08-2023-0872","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0872","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Prefabricated buildings (PBs) have proven to effectively mitigate carbon emissions in the construction industry. Existing studies have analyzed the environmental performance of PBs considering the shift in construction methods, ignoring the emissions abatement effects of the low-carbon practices adopted by participants in the prefabricated building supply chain (PBSC). Thus, it is challenging to exploit the environmental advantages of PBs. To further reveal the carbon reduction potential of PBs and assist participants in making low-carbon practice strategy decisions, this paper constructs a system dynamics (SD) model to explore the performance of PBSC in low-carbon practices.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This study adopts the SD approach to integrate the complex dynamic relationship between variables and explicitly considers the environmental and economic impacts of PBSC to explore the carbon emission reduction effects of low-carbon practices by enterprises under environmental policies from the supply chain perspective.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Results show that with the advance of prefabrication level, the carbon emissions from production and transportation processes increase, and the total carbon emissions of PBSC show an upward trend. Low-carbon practices of rational transportation route planning and carbon-reduction energy investment can effectively reduce carbon emissions with negative economic impacts on transportation enterprises. The application of sustainable materials in low-carbon practices is both economically and environmentally friendly. In addition, carbon tax does not always promote the implementation of low-carbon practices, and the improvement of enterprises' environmental awareness can further strengthen the effect of low-carbon practices.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study dynamically assesses the carbon reduction effects of low-carbon practices in PBSC, informing the low-carbon decision-making of participants in building construction projects and guiding the government to formulate environmental policies.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"6 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591469","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Using fuzzy cognitive maps to explore the dynamic impact on management team resilience in international construction projects 利用模糊认知图探索国际建筑项目对管理团队应变能力的动态影响
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-04-03 DOI: 10.1108/ecam-08-2023-0828
Lili Gao, Xicheng Zhang, Xiaopeng Deng, Na Zhang, Ying Lu
{"title":"Using fuzzy cognitive maps to explore the dynamic impact on management team resilience in international construction projects","authors":"Lili Gao, Xicheng Zhang, Xiaopeng Deng, Na Zhang, Ying Lu","doi":"10.1108/ecam-08-2023-0828","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0828","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study aims to investigate the relationship between individual-level psychological resources and team resilience in the context of expatriate project management teams. It seeks to understand how personal psychological resources contribute to team resilience and explore the dynamic evolution mechanism of team resilience. The goal is to enhance team resilience among expatriates in a BANI (Brittle, Anxious, Nonlinear, and Incomprehensible) world, where organizations face volatile and uncertain conditions.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>An online survey was applied for data collection, and 315 valid samples from Chinese expatriates in international construction projects were utilized for data analysis. A structural equation model (SEM) examines the relationships between personal psychological resources and team resilience. The study identifies five psychological factors influencing team resilience: Employee Resilience, Cross-cultural Adjustment, Self-efficacy, Social Support, and Team Climate. The hypothesized relationships are validated through the SEM analysis. Additionally, a fuzzy cognitive map (FCM) is constructed to explore the dynamic mechanism of team resilience formation based on the results of the SEM.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The SEM analysis confirms that employee resilience, cross-cultural adjustment, and team climate positively impact team resilience. Social support and self-efficacy also have positive effects on team climate. Moreover, team climate is found to fully mediate the relationship between self-efficacy and team resilience, as well as between social support and team resilience. The FCM model provides further insights into the dynamic evolution of team resilience, highlighting the varying impact effects of antecedents during the team resilience development process and the effectiveness of different combinations of intervention strategies.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study contributes to understanding team resilience by identifying the psychological factors influencing team resilience in expatriate project management teams. The findings emphasize the importance of social support and team climate in promoting team resilience. Interventions targeting team climate are found to facilitate the rapid development of team resilience. In contrast, interventions for social support are necessary for sustainable, long-term high levels of team resilience. Based on the dynamic simulation results, strategies for cultivating team resilience through external intervention and internal adjustment are proposed, focusing on social support and team climate. Implementing these strategies can enhance project management team resilience and improve the core competitiveness of contractors in the BANI era.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"118 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591145","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integrating GIS and BIM with MCDM for infrastructure planning: a comprehensive framework 将地理信息系统(GIS)和建筑信息模型(BIM)与城市设计、建造和维护(MCDM)结合起来进行基础设施规划:一个综合框架
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-04-02 DOI: 10.1108/ecam-08-2023-0830
Paulo Alberto Sampaio Santos, Breno Cortez, Michele Tereza Marques Carvalho
{"title":"Integrating GIS and BIM with MCDM for infrastructure planning: a comprehensive framework","authors":"Paulo Alberto Sampaio Santos, Breno Cortez, Michele Tereza Marques Carvalho","doi":"10.1108/ecam-08-2023-0830","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0830","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Present study aimed to integrate Geographic Information Systems (GIS) and Building Information Modeling (BIM) in conjunction with multicriteria decision-making (MCDM) to enhance infrastructure investment planning.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This analysis combines GIS databases with BIM simulations for a novel highway project. Around 150 potential alternatives were simulated, narrowed to 25 more effective routes and 3 options underwent in-depth analysis using PROMETHEE method for decision-making, based on environmental, cost and safety criteria, allowing for comprehensive cross-perspective comparisons.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>A comprehensive framework proposed was validated through a case study. Demonstrating its adaptability with customizable parameters. It aids decision-making, cost estimation, environmental impact analysis and outcome prediction. Considering these critical factors, this study holds the potential to advance new techniques for assessment and planning railways, power lines, gas and water.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>The study acknowledges limitations in GIS data quality, particularly in underdeveloped areas or regions with limited technology access. It also overlooks other pertinent variables, like social, economic, political and cultural issues. Thus, conclusions from these simulations may not entirely represent reality or diverse potential scenarios.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>The proposed method automates decision-making, reducing subjectivity, aids in selecting effective alternatives and considers environmental criteria to mitigate negative impacts. Additionally, it minimizes costs and risks while demonstrating adaptability for assessing diverse infrastructures.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>By integrating GIS and BIM data to support a MCDM workflow, this study proposes to fill the existing research gap in decision-making prioritization and mitigate subjective biases.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"11 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591148","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Key performance indicators of construction companies in branding products and construction projects for success in a competitive environment in Iran 建筑公司在伊朗竞争环境中成功打造产品和建筑项目品牌的关键绩效指标
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-03-27 DOI: 10.1108/ecam-08-2023-0852
Erfan Anjomshoa
{"title":"Key performance indicators of construction companies in branding products and construction projects for success in a competitive environment in Iran","authors":"Erfan Anjomshoa","doi":"10.1108/ecam-08-2023-0852","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0852","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Key performance indicators (KPIs) play a pivotal role in evaluating the level of success of an organization in achieving its business objectives. The objective of the current research is to identify and prioritize effective KPIs in branding products and construction projects, which contribute to the success of construction companies in a competitive environment.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The present research is of an inferential, descriptive and survey nature. In this study, we identified the influential key performance indicators of construction companies in branding products and construction projects for success in a competitive environment through a literature review and expert opinions. The data were collected using a questionnaire, and a combination of the one-sample <em>t</em>-test method with a 95% confidence level and the fuzzy multiple attribute decision-making (FMADM) method was employed for analysis.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicate that the most influential key performance indicators for construction companies in branding products and construction projects for success in a competitive environment are, in order of significance, the following indices: “Marketing and Advertising,” “Financial,” “Creativity,” “Technical and Operational” and “Social and Political.”</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The present research examines the importance of branding construction products and projects for the success of construction companies by improving their business objectives and utilizing key performance indicators throughout the product lifecycle (production and construction). This study provides solutions on how construction companies can increase their competitive advantage through branding and achieve long-term success in the global construction industry.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"16 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140324586","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Interaction mechanisms of interface management risks in complex systems of high-speed rail construction projects: an association rule mining-based modeling framework 高铁建设项目复杂系统中界面管理风险的交互机制:基于关联规则挖掘的建模框架
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-03-26 DOI: 10.1108/ecam-09-2023-0893
Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An, Xueying Bao
{"title":"Interaction mechanisms of interface management risks in complex systems of high-speed rail construction projects: an association rule mining-based modeling framework","authors":"Yuanwen Han, Jiang Shen, Xuwei Zhu, Bang An, Xueying Bao","doi":"10.1108/ecam-09-2023-0893","DOIUrl":"https://doi.org/10.1108/ecam-09-2023-0893","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study aims to develop an interface management risk interaction modeling and analysis methodology applicable to complex systems in high-speed rail construction projects, reveal the interaction mechanism of interface management risk and provide theoretical support for project managers to develop appropriate interface management risk response strategies.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This paper introduces the association rule mining technique to improve the complex network modeling method. Taking China as an example, based on the stakeholder perspective, the risk factors and significant accident types of interface management of high-speed rail construction projects are systematically identified, and a database is established. Then, the Apriori algorithm is used to mine and analyze the strong association rules among the factors in the database, construct the complex network, and analyze its topological characteristics to reveal the interaction mechanism of the interface management risk of high-speed rail construction projects.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results show that the network is both scale-free and small-world, implying that construction accidents are not random events but rather the result of strong interactions between numerous interface management risks. Contractors, technical interfaces, mechanical equipment, and environmental factors are the primary direct causal factors of accidents, while owners and designers are essential indirect causal factors. The global importance of stakeholders such as owners, designers, and supervisors rises significantly after considering the indirect correlations between factors. This theoretically explains the need to consider the interactions between interface management risks.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The interaction mechanism between interface management risks is unclear, which is an essential factor influencing the decision of risk response measures. This study proposes a new methodology for analyzing interface management risk response strategies that incorporate quantitative analysis methods and considers the interaction of interface management risks.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"45 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140324649","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Digital technology-enabled AEC project management: practical use cases, deployment patterns and emerging trends 数字技术辅助 AEC 项目管理:实际用例、部署模式和新兴趋势
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-03-26 DOI: 10.1108/ecam-09-2023-0962
Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi, Nan Yang
{"title":"Digital technology-enabled AEC project management: practical use cases, deployment patterns and emerging trends","authors":"Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi, Nan Yang","doi":"10.1108/ecam-09-2023-0962","DOIUrl":"https://doi.org/10.1108/ecam-09-2023-0962","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"70 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140300259","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Automatic lift path planning of prefabricated building components using semantic BIM, improved A* and GA 利用语义 BIM、改进的 A* 和 GA 实现预制建筑构件的自动电梯路径规划
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-03-26 DOI: 10.1108/ecam-11-2023-1119
Keyu Chen, Beiyu You, Yanbo Zhang, Zhengyi Chen
{"title":"Automatic lift path planning of prefabricated building components using semantic BIM, improved A* and GA","authors":"Keyu Chen, Beiyu You, Yanbo Zhang, Zhengyi Chen","doi":"10.1108/ecam-11-2023-1119","DOIUrl":"https://doi.org/10.1108/ecam-11-2023-1119","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Firstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements’ rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>In this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"183 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140300350","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Multi-objective planning for time-cost trade-offs in multi-project parallel environment 多项目并行环境中时间成本权衡的多目标规划
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-03-26 DOI: 10.1108/ecam-08-2023-0867
Jing An, Suicheng Li, Xiao Ping Wu
{"title":"Multi-objective planning for time-cost trade-offs in multi-project parallel environment","authors":"Jing An, Suicheng Li, Xiao Ping Wu","doi":"10.1108/ecam-08-2023-0867","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0867","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"127 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140198075","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic 模拟 COVID-19 大流行期间跨境建筑物流和供应链质量保证的关键挑战
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-03-26 DOI: 10.1108/ecam-01-2024-0016
Frank Ato Ghansah, Weisheng Lu, Benjamin Kwaku Ababio
{"title":"Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic","authors":"Frank Ato Ghansah, Weisheng Lu, Benjamin Kwaku Ababio","doi":"10.1108/ecam-01-2024-0016","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0016","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The COVID-19 pandemic has impacted the construction industry, yet still, it is unclear from existing studies about the critical challenges imposed on quality assurance (QA), particularly Cross-border Construction Logistics and Supply Chain (Cb-CLSC). Thus, this study aims to identify and examine the critical challenges of QA of Cb-CLSC during the COVID-19 pandemic.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The aim is achieved via an embedded mixed-method approach pragmatically involving a desk literature review and engaging 150 experts across the globe using expert surveys, and results confirmed by semi-structured interviews. The approach is based on Interpretive Structural Modelling (ISM) as its foundation.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The study revealed ten critical challenges of QA, with the top four including “the shortage of raw construction material (C7)”, “design changes (C6)”, “collaboration and communication difficulties (C1)” and “changes in work practices (C10)”. However, examining the interrelationships among the critical challenges using ISM confirmed C7 and C10 as the most critical challenges. The study again revealed that the critical challenges are sensitive and capable of affecting themselves due to the nature of their interrelationship based on MICMAC analysis. Hence, being consistent with why all the challenges were considered critical amid the pandemic. Sentiment analysis revealed that the critical challenges have not been entirely negative but also positive by creating three areas of opportunities for improvement: technology adoption, worker management, and work process management. However, four areas of challenges in the QA include cost, raw material, time, and work process, including inspection, testing, auditing, communication, etc.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>The finding provides a convenient point of reference to researchers, policymakers, practitioners, and decision-makers on formulating policies to enhance the effectiveness of construction QA during the pandemic through to the post-pandemic era.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The study enriches the extant literature on QA, Cb-CLSC, and the COVID-19 pandemic in the construction industry by identifying the critical challenges and examining the interrelationships among them. This provides a better understanding of how the construction QA has been affected by the pandemic and the opportunities created.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"91 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-03-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140325894","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信