{"title":"Computer vision-based real-time monitoring for swivel construction of bridges: from laboratory study to a pilot application","authors":"Shilong Zhang, Changyong Liu, Kailun Feng, Chunlai Xia, Yuyin Wang, Qinghe Wang","doi":"10.1108/ecam-10-2022-0992","DOIUrl":"https://doi.org/10.1108/ecam-10-2022-0992","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The swivel construction method is a specially designed process used to build bridges that cross rivers, valleys, railroads and other obstacles. To carry out this construction method safely, real-time monitoring of the bridge rotation process is required to ensure a smooth swivel operation without collisions. However, the traditional means of monitoring using Electronic Total Station tools cannot realize real-time monitoring, and monitoring using motion sensors or GPS is cumbersome to use.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This study proposes a monitoring method based on a series of computer vision (CV) technologies, which can monitor the rotation angle, velocity and inclination angle of the swivel construction in real-time. First, three proposed CV algorithms was developed in a laboratory environment. The experimental tests were carried out on a bridge scale model to select the outperformed algorithms for rotation, velocity and inclination monitor, respectively, as the final monitoring method in proposed method. Then, the selected method was implemented to monitor an actual bridge during its swivel construction to verify the applicability.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>In the laboratory study, the monitoring data measured with the selected monitoring algorithms was compared with those measured by an Electronic Total Station and the errors in terms of rotation angle, velocity and inclination angle, were 0.040%, 0.040%, and −0.454%, respectively, thus validating the accuracy of the proposed method. In the pilot actual application, the method was shown to be feasible in a real construction application.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>In a well-controlled laboratory the optimal algorithms for bridge swivel construction are identified and in an actual project the proposed method is verified. The proposed CV method is complementary to the use of Electronic Total Station tools, motion sensors, and GPS for safety monitoring of swivel construction of bridges. It also contributes to being a possible approach without data-driven model training. Its principal advantages are that it both provides real-time monitoring and is easy to deploy in real construction applications.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"21 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591128","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Yibin Ao, Panyu Peng, Mingyang Li, Jiayue Li, Yan Wang, Igor Martek
{"title":"Empowering architecture, engineering and construction students through building information modeling competitions: a deep dive into behavioral motivation","authors":"Yibin Ao, Panyu Peng, Mingyang Li, Jiayue Li, Yan Wang, Igor Martek","doi":"10.1108/ecam-10-2023-1076","DOIUrl":"https://doi.org/10.1108/ecam-10-2023-1076","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Building Information Modeling (BIM) competitions are a beneficial approach to enhance BIM education, offering students practical experience in BIM application, including mastering workflows and technical tools. However, research exploring the individual perceptions influencing participation intentions and behaviors in BIM competitions is limited. Therefore, this study aims to investigate the factors affecting university students' behavioral intention and behavior in BIM competitions, providing theoretical support for BIM competitions and educational reform.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This study employs the Structural Equation Modeling (SEM) based on the Unified Theory of Acceptance and Use of Technology (UTAUT) framework to analyze the factors influencing BIM competition participation among 970 Architecture, Engineering, and Construction (AEC) university students.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results of the study show that social influence, attitude, and self-efficacy play critical roles in shaping students' intentions to participate in BIM competitions. Furthermore, self-efficacy, facilitating conditions, and behavioral intention significantly influence students' actual engagement in such competitions. Surprisingly, effort expectancy negatively influences intentions, as less challenging tasks can lead students to perceive their participation as less impactful on their skills and learning, reducing their behavioral intention to participate.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This research provides valuable insights into the effectiveness of BIM competitions in enhancing BIM education for AEC students. Extending the UTAUT model to include self-efficacy and attitude, provides a novel perspective for understanding students' intentions and behaviors regarding BIM competitions. The study’s theoretical support proposes incorporating BIM competitions to augment BIM teaching methods and offers suggestions for advancing the efficacy of students' involvement in BIM competitions within higher education, thus contributing to educational reform in the AEC sector.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"11 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591144","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Construction industry changes induced by the COVID-19 pandemic","authors":"Kyudong Kim, Helena R. Tiedmann, Kasey M. Faust","doi":"10.1108/ecam-09-2023-0983","DOIUrl":"https://doi.org/10.1108/ecam-09-2023-0983","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related changes, how these changes may apply to different companies, and which changes should continue post-pandemic.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>We aim to identify pandemic-driven changes that have affected the construction workplace and the advantages and challenges associated with them. We then make recommendations for what could and should endure through the pandemic and beyond, and under what circumstances. To achieve this objective, we conducted both qualitative and quantitative analyses of 40 semi-structured interviews with US-based construction professionals.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Identified through these interviews were 21 pandemic-driven changes across six categories: management and planning, technology, workforce, health and safety, supply chain, and contracts. This study noted both positive and negative impacts of the changes on cost, schedule, productivity, collaboration, employee retention, flexibility, quality, and risk mitigation. Participants indicated that some changes should remain after the pandemic and others (e.g. select safety measures, schedule adjustments) should be temporary.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>By incorporating these lessons learned into recommendations, the findings of this study will help businesses identify and implement the most appropriate improvements for their organizations. The findings also provide policymakers with valuable insights on how to promote innovation in the construction industry and potentially enact more effective policies during crises to drive long-term improvements.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"48 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591129","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Work–family conflict and high-quality relationships in construction project management: the effect of job and life satisfaction","authors":"Handan Kunkcu, Kerim Koc, Asli Pelin Gurgun","doi":"10.1108/ecam-05-2023-0499","DOIUrl":"https://doi.org/10.1108/ecam-05-2023-0499","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking work–family conflict and high-quality relationships among project team members and explore mediating effects of life and job satisfactions.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A theoretical framework was established based on the spillover theory and social exchange theory. Data were obtained by a questionnaire survey conducted with 328 respondents working in construction projects. Structural equation modeling (SEM) was used to test interrelationships among work–family conflict, job satisfaction, life satisfaction and high-quality relationship.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicate that work–family conflict is negatively associated with both job and life satisfactions of construction professionals. In addition, there were direct and positive relationships between satisfaction domains and high-quality relationship capacity. The findings further support that job satisfaction plays a mediating role between work–family conflict and high-quality relationship among construction professionals, while life satisfaction does not mediate the relationship.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The effects of interrole conflicts on the context of satisfaction have been investigated previously; however, there is a lack of knowledge regarding its influence on high-quality relationship among project team members. This study extends the body of knowledge on high-quality relationships among project team members to understand how conflict and satisfaction factors influence interpersonal relationships in construction project management.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"36 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591149","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Working from home during the COVID-19 pandemic and gender differences: a case of construction workforce in Australia","authors":"Bee Lan Oo, Benson Teck-Heng Lim","doi":"10.1108/ecam-11-2023-1130","DOIUrl":"https://doi.org/10.1108/ecam-11-2023-1130","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study aims to explore the gender differences in working from home (WFH) experiences during the pandemic from the Australia’s construction workforce perspective. Specifically, it explores gender differences in terms of: (1) the respondents’ family responsibilities during the pandemic; (2) their WFH experiences prior to and during the pandemic; and (3) their perceptions of the impacts of challenges associated with WFH on their work activities and performance along with their self-reported work performance when WFH, overall satisfaction with WFH and preference for WFH post-COVID.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This study adopted a survey design to reach the targeted sample population, i.e. construction workforce in the Australian construction industry who has had experienced WFH during the pandemic. Data was collected using an online anonymous questionnaire survey.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results show notable gender differences in various aspects including family responsibilities, workplace arrangements and perceptions of the impacts of the challenges associated with WFH on work activities and performance. Also, statistically significant associations are detected between gender and the respondents’ self-reported work performance when WFH, overall satisfaction with WFH and preference for WFH post-COVID.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Even prior to the COVID-19 pandemic, little is known about WFH experiences among construction workforce due to the low prevalence of regular and planned remote working in the industry. This is the first study sheds light on construction workforce WFH experiences using gender lenses. The findings have implications for construction-related firms continuing with WFH arrangement post the pandemic, which may include the formulation of policy responses to re-optimize their present WFH practices.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"54 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591434","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Evolutionary game analysis of collaborative application of BIM platform from the perspective of value co-creation","authors":"Xiaowei An, Sicheng Ren, Lunyan Wang, Yehui Huang","doi":"10.1108/ecam-01-2024-0009","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0009","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The purpose of this paper is to explore the support for multi-party collaboration in project construction provided by building information modeling (BIM). Based on the perspective of value co-creation, the research results can provide support for the collaborative application and contract design of BIM platform.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>In this paper, an evolutionary game model involving the owner, designer and constructor is constructed by using prospect theory and evolutionary game theory. Through simulation analysis, the evolution law of the strategy choice of each party in the collaborative application of BIM platform is discussed and the key factors affecting the strategy choice of all parties are analyzed.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results show that there is an ideal local equilibrium point with progressive stability in the evolutionary game between the three parties: “the construction party shares information, the designer receives the information and optimizes the project and the owner does not provide incentives”; in addition, the opportunistic behaviors of the design and construction parties, as well as the probability of such behaviors being detected and the subsequent punishment have a significant impact on the evolutionary outcome.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This method can provide support for the collaborative application and contract design of BIM platform.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"28 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140590996","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Rita Peihua Zhang, Helen Lingard, Jack Clarke, Stefan Greuter, Lyndall Strazdins, Christine LaBond, Tinh Doan
{"title":"Supportive communication between apprentices and supervisors: development of a digital role play game","authors":"Rita Peihua Zhang, Helen Lingard, Jack Clarke, Stefan Greuter, Lyndall Strazdins, Christine LaBond, Tinh Doan","doi":"10.1108/ecam-11-2023-1157","DOIUrl":"https://doi.org/10.1108/ecam-11-2023-1157","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This paper describes the development of a digital role play game (RPG) designed to help construction apprentices to better communicate with their supervisors about issues with the potential to impact on their physical and psychological health and safety.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A participatory approach was adopted to utilise the knowledge and insights of the target users to inform the digital RPG development. Apprentices and supervisors were interviewed to identify characteristics of effective supervisor-apprentice communication, which became the RPG’s learning objectives. The scenarios constructed in the RPG were drawn from lived experiences shared by the apprentices in the interviews. During the development process, consultations were conducted with an advisory committee comprising of apprentices and supervisors to improve the realism of the RPG scenarios.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Three scenarios were developed for the RPG. In each scenario, players are asked to make decisions at various interaction points about how the characters should respond to the unfolding and challenging situations. Scripts were developed for the game, which were acted out and motion captured to animate digital MetaHuman characters embedded in a virtual construction site. Two example situations are introduced in this paper to illustrate the development process.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>To our knowledge, the RPG introduced is one of the first applications of digital game-based training in the construction industry. The adoption of a participatory design approach ensures that the game content relates to real-world experiences. The digital RPG is highly interactive and engaging in nature and presents a novel approach to developing “soft” skills in construction.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"63 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591153","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara, Hasith Chathuranga Victar
{"title":"Evaluation of time allocated for bid preparation in national competitive bidding in the Sri Lankan construction industry","authors":"Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara, Hasith Chathuranga Victar","doi":"10.1108/ecam-11-2023-1151","DOIUrl":"https://doi.org/10.1108/ecam-11-2023-1151","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"6 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591217","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Optimising construction waste management in Sri Lanka through Circular economy strategies: a focus on construction and renovation and use and operate stages","authors":"Hasith Chathuranga Victar, Anuradha Samarajeewa Waidyasekara","doi":"10.1108/ecam-06-2023-0608","DOIUrl":"https://doi.org/10.1108/ecam-06-2023-0608","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"54 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591147","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Exploring critical success factors for digital transformation in construction industry–based on TOE framework","authors":"Yi Zhong, Zhiqian Chen, Jinglei Ye, Na Zhang","doi":"10.1108/ecam-08-2023-0782","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0782","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study aims to investigate the critical success factors of digital transformation in the construction industry and identify whether the respondents' profiles influence their perceptions of critical success factors for digital transformation.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>To achieve the objectives, a literature review was first conducted based on technology-organization-environment (TOE) framework. Then a questionnaire survey was carried out. A total of 86 people were surveyed in this study, mainly from the construction industry. At the level of data processing, SPSS was used for analysis. Among the main tests used were the Shapiro–Wilk test, reliability analysis, mean rank analysis, Kruskal–Wallis test and Mann–Whitney <em>U</em> test.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The study identified 15 critical success factors of digital transformation and found the three most important factors of digital transformation. Furthermore, respondents with different years of experience, enterprises with different sizes and different years made no difference in the perception of factors. Respondents' different occupations and types of enterprises created a bias in the perception of factors for digital transformation.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>Firstly, the small sample size of the questionnaire limits the reference value of data analysis for certain groups. In addition, this study focuses broadly on construction enterprises without specifically examining different types of enterprises, thus lacking depth in its findings.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>This study establishes a connection between TOE theory and the construction industry through an extensive literature review, identifying relevant factors and providing a reference for future research.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The study's results would enrich the research on digital transformation in the construction industry and provide a reference for the digital transformation of construction enterprises.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"25 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140591131","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}