{"title":"Performance barriers and competence development of graduate architects in construction contract administration (CCA): the mediating role of CCA skills","authors":"Tiew Si Yee","doi":"10.1108/ecam-09-2023-0928","DOIUrl":"https://doi.org/10.1108/ecam-09-2023-0928","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Education focused on the creation of a knowledge base but not on how to bring such knowledge into practice had caused graduate architects to encounter reality shock and fail to perform during building contract administration. Although the effect of performance barriers on competence development is empirically supported, less is known about the mechanisms that explain this effect. Overcoming barriers for graduate architects is crucial while supporting building contract administrators and acquiring professional qualifications. To address this issue, we propose the mediating role of CCA skills as a possible explanation of the relationship between performance barriers and competence development of graduate architects.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A survey was conducted among graduate architects in Klang Valley. In total, one hundred and twenty-seven usable questionnaires were returned and analyzed using descriptive analysis and regression analysis.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Mediation results indicate that performance barriers have a significant positive influence on competence development through CCA skills in claims and legal matters management, project management, communication and relationship management, quality assessment and management, and design management.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The present study contributes to the construction contract administration literature by integrating performance barriers and the CCA skills model. This advances our understanding of performance barriers and CCA skills engendering competence development of graduate architects.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"68 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141253140","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Comprehensive evaluation of digital technology's effects on the supply chain of prefabricated construction","authors":"Tai Wai Kwok, SiWei Chang","doi":"10.1108/ecam-01-2024-0010","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0010","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Digital technology, which is regarded as a prominent and transformational force in modern society, encompasses a wide variety of technology that utilize digital data to process, store and transfer various types of information. Digital technologies have continually been introduced as cutting-edge information tools in order to achieve effective management of vast information that arises from the prefabrication supply chain. However, without a sufficient performance evaluation, drawbacks of technology investment, such as financial losses and ineffective resource allocation, keep occurring, which hinders the widespread implementation of digital technologies. This study demonstrates a comprehensive evaluation of digital technologies’ effects on the prefabrication supply chain based on multi-criteria decision analysis (MCDA) theory.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Specifically, the targeted digital technologies and project constraints were first identified through a systematic literature review. The effects of the digital technologies were then scored using a questionnaire survey. The TOPSIS model was established to quantitatively rank the effectiveness of selected digital technologies.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Overall, BIM technology shone out in the rankings and is regarded as the most beneficial digital solution by multi-stakeholders to the existing constraints, such as working efficiency. Collaboration patterns between different stakeholders and technology integration trend were also indicated.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Compared with existing outcomes, this study specifically focused on examining the effects of digital technologies on the prefabrication supply chain, the most significant link in the process for prefabricated structures. New findings indicate the overall performance that considered both multi-stakeholders’ preferences and project constraints. The quantitative evaluation presents a comprehensive understanding of digital technologies’ effects, enabling industrial participants to reach well-informed, strategic and profitable investment decisions.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"10 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141253136","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"An intelligent framework for rework risk identification in prefabricated construction processes based on compliance checking","authors":"Fanfan Meng, Xinying Cao","doi":"10.1108/ecam-06-2023-0645","DOIUrl":"https://doi.org/10.1108/ecam-06-2023-0645","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study establishes an ontology-based framework for rework risk identification (RRI) by integrating heterogeneous data from the information flow of the prefabricated construction (PC) process. The main objective is to enhance the automation level of rework management and reduce the degree of reliance on human factors and manual operations.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The proposed framework comprises four levels aimed at managing dispersed rework risk knowledge and integrating heterogeneous data. The functionalities were realised through an integrated ontology that aligned the rework risk ontology with the PC ontology. The ontologies were developed and edited with Protégé. Ultimately, the potential benefit of the framework was validated through a case study and an expert questionnaire survey.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The framework is proven to effectively manage rework risk knowledge and can identify risk objects, clarify risk factors, determine risk events, and retrieve risk measures, thereby enabling the pre-identification of prefabricated rework risk (PRR) and improving the automation level. This study is meaningful and lays the foundation for the application of other computer methods in rework management research and practice in the future.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This research provides insights into the application of ontology to solve rework risk issues in the PC process and introduces a novel risk management method for future prefabricated project research and practice. The findings have significant theoretical value in terms of enriching the methods of risk assessment and control and the information management system of prefabricated projects.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"191 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141188450","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Uncovering value creation factors for healthcare public-private partnership (PPP) projects","authors":"Cenk Budayan, Kerim Koc, Eralp Yüksel Erk, Onur Behzat Tokdemir","doi":"10.1108/ecam-07-2023-0759","DOIUrl":"https://doi.org/10.1108/ecam-07-2023-0759","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Many countries struggled to respond to the pandemic burden; in fact, most suffer from healthcare incapacity generally. Therefore, they need to find innovative systems to compensate for their deficiencies in dealing with current and future problems. One such goes down the public-private partnership (PPP) route. It is important to note, however, that PPP is not a magic wand, and some of these projects have been criticized for overruns that exceed the value created. Aiming to promote the value created in healthcare PPP projects, this study aims to identify factors and critical points related to their implementation.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A two-stage literature review was conducted to shape semi-structured interviews. Based on this, the questions to be asked in the interviews were prepared. The interviews were conducted with twelve experts. The transcripts of the twelve semi-structured interviews were analyzed using manual thematic analysis to reveal the most critical value-creation factors (VCFs). The VFCs were validated by comparing them with the studies in the literature and by having focus group discussions (FGDs) with the experts. Finally, in an FGD, the experts discussed how these factors affect value creation in healthcare PPP projects.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The findings show that VFCs can be categorized into four dimensions: assets, partnership synergy, cooperation environment and processes. Based on the frequency of codes during the thematic analysis, the most frequently addressed VFCs in each category were identified. These were complementary skills and resources, attitude, early establishment of the operational body and effective design development, respectively.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>This research contributes to both society and practice by unveiling VCFs and effective ways to achieve them in healthcare PPP projects. Thus, practitioners can generate more value and bring value to the forefront of healthcare PPPs, which can then enhance the value gained by society.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Studies to date have offered little about VCFs and how to realize value in PPP projects by considering the factors involved in them. Moreover, value creation in PPP healthcare projects has largely remained unexplored, despite PPPs being adopted and investigated quite commonly.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"42 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141188316","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Aided design decision-making framework for engineering projects considering cost and social benefits","authors":"Meng-Nan Li, Xueqing Wang, Ruo-Xing Cheng, Yuan Chen","doi":"10.1108/ecam-02-2024-0154","DOIUrl":"https://doi.org/10.1108/ecam-02-2024-0154","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Currently, engineering project design lacks a design framework that fully combines subjective experience and objective data. This study develops an aided design decision-making framework to automatically output the optimal design alternative for engineering projects in a more efficient and objective mode, which synthesizes the design experience.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A database of design components is first constructed to facilitate the retrieval of data and the design alternative screening algorithm is proposed to automatically select all feasible design alternatives. Then back propagation (BP) neural network algorithm is introduced to predict the cost of all feasible design alternatives. Based on the gray relational degree-particle swarm optimization (GRD-PSO) algorithm, the optimal design alternative can be selected considering multiple objectives.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The case study shows that the BP neural network-cost prediction algorithm can well predict the cost of design alternatives, and the framework can be widely used at the design stage of most engineering projects. Design components with low sensitivity to design objectives have been obtained, allowing for the consideration of disregarding their impacts on design objectives in such situations requiring rapid decisions. Meanwhile, design components with high sensitivity to design objective weights have also been obtained, drawing special attention to the effects of changes in the importance of design objectives on the selection of these components. Simultaneously, the framework can be flexibly adjusted to different design objectives and identify key design components, providing decision reference for designers.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The framework proposed in this paper contributes to the knowledge of design decision-making by emphasizing the importance of combining objective data and subjective experience, whose significance is ignored in the existing literature.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"88 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141062314","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Vu Hong Son Pham, Nghiep Trinh Nguyen Dang, Nguyen Van Nam
{"title":"Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning","authors":"Vu Hong Son Pham, Nghiep Trinh Nguyen Dang, Nguyen Van Nam","doi":"10.1108/ecam-07-2023-0672","DOIUrl":"https://doi.org/10.1108/ecam-07-2023-0672","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>For successful management of construction projects, a precise analysis of the balance between time and cost is imperative to attain the most effective results. The aim of this study is to present an innovative approach tailored to tackle the challenges posed by time-cost trade-off (TCTO) problems. This objective is achieved through the integration of the multi-verse optimizer (MVO) with opposition-based learning (OBL), thereby introducing a groundbreaking methodology in the field.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The paper aims to develop a new hybrid meta-heuristic algorithm. This is achieved by integrating the MVO with OBL, thereby forming the iMVO algorithm. The integration enhances the optimization capabilities of the algorithm, notably in terms of exploration and exploitation. Consequently, this results in expedited convergence and yields more accurate solutions. The efficacy of the iMVO algorithm will be evaluated through its application to four different TCTO problems. These problems vary in scale – small, medium and large – and include real-life case studies that possess complex relationships.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The efficacy of the proposed methodology is evaluated by examining TCTO problems, encompassing 18, 29, 69 and 290 activities, respectively. Results indicate that the iMVO provides competitive solutions for TCTO problems in construction projects. It is observed that the algorithm surpasses previous algorithms in terms of both mean deviation percentage (MD) and average running time (ART).</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This research represents a significant advancement in the field of meta-heuristic algorithms, particularly in their application to managing TCTO in construction projects. It is noteworthy for being among the few studies that integrate the MVO with OBL for the management of TCTO in construction projects characterized by complex relationships.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"8 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-05-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140931848","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Haonan Qi, Zhipeng Zhou, Javier Irizarry, Xiaopeng Deng, Yifan Yang, Nan Li, Jianliang Zhou
{"title":"Modification of HFACS model for path identification of causal factors of collapse accidents in the construction industry","authors":"Haonan Qi, Zhipeng Zhou, Javier Irizarry, Xiaopeng Deng, Yifan Yang, Nan Li, Jianliang Zhou","doi":"10.1108/ecam-02-2023-0101","DOIUrl":"https://doi.org/10.1108/ecam-02-2023-0101","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study aims to modify the human factors analysis and classification system (HFACS) to make it suitable for collapse accident analysis in construction. Based upon the modified HFACS, distribution patterns of causal factors across multiple levels were discerned among causal factors of various stakeholders at construction sites. It explored the correlations between two causal factors from different levels and further determined causation paths from two perspectives of level and stakeholder.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The main research framework consisted of data collection, coding and analysis. Collapse accident reports were collected with adequate causation information. The modified HFACS was utilized for coding causal factors across all five levels in each case. A hybrid approach with two perspectives of level and stakeholder was proposed for frequency analysis, correlation analysis and path identification between causal factors.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Eight causal factors from external organizations at the fifth level were added to the original HFACS. Level-based correlation analyses and path identification provided safety managers with a holistic view of inter-connected causal factors across five levels. Stakeholder-based correlation analyses between causal factors from the fifth level and its non-adjacent levels were implemented based on client, government and third parties. These identified paths were useful for different stakeholders to develop specific safety plans for avoiding construction collapse accidents.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This paper fulfils an identified need to modify and utilize the HFACS model for correlation analysis and path identification of causal factors resulting in collapse accidents, which can provide opportunities for tailoring preventive and protective measures at construction sites.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"82 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140888979","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Mikias Gugssa, Long Li, Lina Pu, Ali Gurbuz, Yu Luo, Jun Wang
{"title":"Enabling near-real-time safety glove detection through edge computing and transfer learning: comparative analysis of edge and cloud computing-based methods","authors":"Mikias Gugssa, Long Li, Lina Pu, Ali Gurbuz, Yu Luo, Jun Wang","doi":"10.1108/ecam-07-2023-0763","DOIUrl":"https://doi.org/10.1108/ecam-07-2023-0763","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Computer vision and deep learning (DL) methods have been investigated for personal protective equipment (PPE) monitoring and detection for construction workers’ safety. However, it is still challenging to implement automated safety monitoring methods in near real time or in a time-efficient manner in real construction practices. Therefore, this study developed a novel solution to enhance the time efficiency to achieve near-real-time safety glove detection and meanwhile preserve data privacy.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The developed method comprises two primary components: (1) transfer learning methods to detect safety gloves and (2) edge computing to improve time efficiency and data privacy. To compare the developed edge computing-based method with the currently widely used cloud computing-based methods, a comprehensive comparative analysis was conducted from both the implementation and theory perspectives, providing insights into the developed approach’s performance.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Three DL models achieved mean average precision (mAP) scores ranging from 74.92% to 84.31% for safety glove detection. The other two methods by combining object detection and classification achieved mAP as 89.91% for hand detection and 100% for glove classification. From both implementation and theory perspectives, the edge computing-based method detected gloves faster than the cloud computing-based method. The edge computing-based method achieved a detection latency of 36%–68% shorter than the cloud computing-based method in the implementation perspective. The findings highlight edge computing’s potential for near-real-time detection with improved data privacy.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study implemented and evaluated DL-based safety monitoring methods on different computing infrastructures to investigate their time efficiency. This study contributes to existing knowledge by demonstrating how edge computing can be used with DL models (without sacrificing their performance) to improve PPE-glove monitoring in a time-efficient manner as well as maintain data privacy.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"11 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-05-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140840163","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Luís Jacques de Sousa, João Poças Martins, Luís Sanhudo
{"title":"Predicting construction project compliance with machine learning model: case study using Portuguese procurement data","authors":"Luís Jacques de Sousa, João Poças Martins, Luís Sanhudo","doi":"10.1108/ecam-09-2023-0973","DOIUrl":"https://doi.org/10.1108/ecam-09-2023-0973","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s financial compliance. Predicting budget compliance in construction projects has been traditionally challenging, but Machine Learning (ML) techniques have revolutionised estimations.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>In this study, Portuguese Public Procurement Data (PPPData) was utilised as the model’s input. Notably, this dataset exhibited a substantial imbalance in the target feature. To address this issue, the study evaluated three distinct data balancing techniques: oversampling, undersampling, and the SMOTE method. Next, a comprehensive feature selection process was conducted, leading to the testing of five different algorithms for forecasting budget compliance. Finally, a secondary test was conducted, refining the features to include only those elements that procurement technicians can modify while also considering the two most accurate predictors identified in the previous test.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The findings indicate that employing the SMOTE method on the scraped data can achieve a balanced dataset. Furthermore, the results demonstrate that the Adam ANN algorithm outperformed others, boasting a precision rate of 68.1%.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>The model can aid procurement technicians during the tendering phase by using historical data and analogous projects to predict performance.</p><!--/ Abstract__block -->\u0000<h3>Social implications</h3>\u0000<p>Although the study reveals that ML algorithms cannot accurately predict budget compliance using procurement data, they can still provide project owners with insights into the most suitable criteria, aiding decision-making. Further research should assess the model’s impact and capacity within the procurement workflow.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>Previous research predominantly focused on forecasting budgets by leveraging data from the private construction execution phase. While some investigations incorporated procurement data, this study distinguishes itself by using an imbalanced dataset and anticipating compliance rather than predicting budgetary figures. The model predicts budget compliance by analysing qualitative and quantitative characteristics of public project contracts. The research paper explores various model architectures and data treatment techniques to develop a model to assist the Client in tender definition.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"185 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140931850","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri, Mohamed Ashraf Elsayad
{"title":"Introducing a novel decision support system to enhance performance in infrastructure sanitation projects within the construction industry","authors":"Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri, Mohamed Ashraf Elsayad","doi":"10.1108/ecam-12-2023-1249","DOIUrl":"https://doi.org/10.1108/ecam-12-2023-1249","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to identify these crucial PFs and secondly, to develop a robust performance model capable of effectively measuring and assessing the intricate interdependencies and correlations within ISSPs. By achieving these objectives, the study aimed to provide valuable insights into and tools for enhancing the efficiency and effectiveness of sanitation projects in the construction industry.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>To achieve the study's aim, the methodology for identifying the PFs for ISSPs involved several steps: extensive literature review, interviews with Egyptian industry experts, a questionnaire survey targeting industry practitioners and an analysis using the Relative Importance Index (RII), Pareto principle and analytic network process (ANP). The RII ranked factor importance, and Pareto identified the top 20% for ANP, which determined connections and interdependencies among these factors.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The literature review identified 36 PFs, and an additional 13 were uncovered during interviews. The highest-ranked PF is PF5, while PF19 is the lowest-ranked. Pareto principle selected 11 PFs, representing the top 20% of factors. The ANP model produced an application for measuring ISSP effectiveness, validated through two case studies. Application results were 92.25% and 91.48%, compared to actual results of 95.77% and 97.37%, indicating its effectiveness and accuracy, respectively.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study addresses a significant knowledge gap by identifying the critical PFs that influence ISSPs within the construction industry. Subsequently, it constructs a novel performance model, resulting in the development of a practical computer application aimed at measuring and evaluating the performance of these projects.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"115 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-04-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140635806","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}