Engineering, Construction and Architectural Management最新文献

筛选
英文 中文
Measuring the impact of lean implementation on BIM and project success: case of construction firms 衡量精益实施对 BIM 和项目成功的影响:建筑公司案例
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-07-01 DOI: 10.1108/ecam-02-2024-0204
Furkan Polat, Sevilay Demirkesen
{"title":"Measuring the impact of lean implementation on BIM and project success: case of construction firms","authors":"Furkan Polat, Sevilay Demirkesen","doi":"10.1108/ecam-02-2024-0204","DOIUrl":"https://doi.org/10.1108/ecam-02-2024-0204","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The main purpose of this study is to reveal the degree of association between lean, building information modeling (BIM) and construction project success. The study further intends to provide strategies for high and low associations of the factors.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Lean construction and BIM are two important applications that have recently gained popularity in terms of enhancing project success. Considering this impact, this study investigates the synergy between lean construction and BIM and determines to what extent these two contribute to the success of the projects. As a first step, lean, BIM and project success were examined based on an in-depth literature review. In the second stage, a structural equation model (SEM) was established to reflect the relationship among these three through hypotheses. Then, a questionnaire was designed and administered to the construction professionals experienced in both lean and BIM implementation. The SEM was tested using Analysis of Moment Structures (AMOS), an SPSS tool.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicated that lean implementation has a significant and positive impact on BIM implementation and project success. On the other hand, BIM implementation had a lower significant impact on project success than lean implementation construct.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>The results of this study can be used by both policymakers and industry practitioners in terms of developing strategies for effectively using both lean and BIM. The researchers can further develop other implementation models to investigate whether these concepts are more effective in increasing project success when used integratively.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study considers both the impact of lean and BIM on project success through input from construction practitioners working on large projects. This way, the study fosters the use of lean, BIM or lean–BIM together in construction projects to enhance project success.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"27 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513597","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Determinants for megaproject knowledge innovation management: a Bayesian network analysis 巨型项目知识创新管理的决定因素:贝叶斯网络分析
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-28 DOI: 10.1108/ecam-03-2023-0244
Lin-lin Xie, Yifei Luo, Lei Hou, Jianqiang Yu
{"title":"Determinants for megaproject knowledge innovation management: a Bayesian network analysis","authors":"Lin-lin Xie, Yifei Luo, Lei Hou, Jianqiang Yu","doi":"10.1108/ecam-03-2023-0244","DOIUrl":"https://doi.org/10.1108/ecam-03-2023-0244","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Megaproject knowledge innovation (MKI) is perceived as a critical strategy for engineering value co-creation and industrial chain upgrading. Ascertaining the impact mechanism of MKI is a crucial initial step towards improving management practices. Within the framework of complex systems in megaprojects, factors exhibit intricate interdependencies. However, the current domain of knowledge has either overlooked or oversimplified this relationship and therefore cannot propose pragmatic and efficacious strategies for enhancing MKI. To close this gap, this study develops a Bayesian network (BN) model aiming to investigate the interdependencies among MKI-related factors and their impact on MKI.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>First, this study implements literature review, expert interview and field investigation to identify the influencing factor nodes for the network model development. Second, a Bayesian network was constructed by integrating the expert knowledge with Dempster-Shafer theory. Next, a MKI measurement model was established using 253 training samples. Finally, the factor significance and optimal MKI improvement strategies are identified from the sensitivity analysis and probabilistic reasoning within the BNs.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicate that (1) the BN model exhibits significant reliability and holds promotion and application value in formulating MKI management strategies; (2) knowledge sharing, shared vision and leadership are the key influencing factors of MKI; and (3) simultaneously improving institutional pressure, leadership and knowledge sharing is the most optimal strategy to enhance MKI.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study innovatively introduced the BN method into the domain of MKI management, providing an appropriate approach for modelling complex relationships among factors and investigate nonlinear influences. The developed model raises megaproject stakeholders’ awareness about factors influencing MKI and presents quantified strategies that increase the likelihood of maximising MKI levels. Its ease of generalisability positions it as a promising decision support tool, facilitating the implementation of sustainable MKI practices.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"91 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502952","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A generative design-based optimization model for multi-objective construction site layout planning 基于生成设计的多目标建筑工地布局规划优化模型
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-26 DOI: 10.1108/ecam-11-2023-1193
Hossam Wefki, Mona Salah, Emad Elbeltagi, Asser Elsheikh, Rana Khallaf
{"title":"A generative design-based optimization model for multi-objective construction site layout planning","authors":"Hossam Wefki, Mona Salah, Emad Elbeltagi, Asser Elsheikh, Rana Khallaf","doi":"10.1108/ecam-11-2023-1193","DOIUrl":"https://doi.org/10.1108/ecam-11-2023-1193","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Given the growing interest in modern construction techniques and the emergence of innovative technologies, construction site layout planning research has progressively been investigating approaches to adopt innovative concepts and incorporate renewed approaches to improve widespread efficiency. This research develops a decision-making tool that optimizes construction site layout plans. The developed model targets two main objectives: minimizing material transportation costs and maximizing safety by optimally placing facilities on construction sites.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>A novel approach is devised based on the integration of Building Information Modeling and Generative Design (BIM-GD). This engine is used to optimize the multi-objective site layout problems to identify layout alternatives in the early project stages. Parametric modeling uses Dynamo to construct the model and explore constraints initially. Finally, the GD environment is utilized to create different design alternatives, and then the decision-making procedure selects the most appropriate design alternative. Additionally, a case study is applied to validate the effectiveness of the developed model.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results indicate the effectiveness of the proposed GD tool and its potential for more complex applications. The GD engine examined optimal layout plans, balancing different objectives and adhering to appointed geometric constraints. A case study was conducted to assess the model's effectiveness and showcase its suitability. Construction Site Layout Planning (CSLP) is an essential step in design that can influence considerable aspects, such as material transportation expenses and different safety standards on the site. Employing visual programming for parametric modeling within Dynamo-Revit creates an expedient and user-friendly platform for planning engineers who may require more programming expertise to create and program algorithmic models visually. Utilizing GD in CSLP has proven to be a powerful tool with consequential prospects for improving applications and executing more models.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>The findings from this framework are intended to help construction practitioners select the most appropriate site layout during early project stages while incorporating different safety criteria inside construction sites to alleviate actual safety risks.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>A new approach is proposed that utilizes an integrated BIM-GD engine to optimize multi-objective site layout problems. This approach targets two main objectives: minimizing material transportation costs and maximizing safety by optimally placing facilities in construction sites.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"13 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513598","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods 通过项目交付方法对交通项目进行施工后评估,监督学习成本风险
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-25 DOI: 10.1108/ecam-01-2024-0136
Junseo Bae
{"title":"Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods","authors":"Junseo Bae","doi":"10.1108/ecam-01-2024-0136","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0136","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The main objectives of this study are to (1) develop and test a cost contingency learning model that can generalize initially estimated contingency amounts by analyzing back the multiple project changes experienced and (2) uncover the hidden link of the learning networks using a curve-fitting technique for the post-construction evaluation of cost contingency amounts to cover cost risk for future projects.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>Based on a total of 1,434 datapoints collected from DBB and DB transportation projects, a post-construction cost contingency learning model was developed using feedforward neural networks (FNNs). The developed model generalizes cost contingencies under two different project delivery methods (i.e. DBB and DB). The learning outputs of generalized contingency amounts were curve-fitted with the post-construction schedule and cost information, specifically aiming at uncovering the hidden link of the FNNs. Two different bridge projects completed under DBB and DB were employed as illustrative examples to demonstrate how the proposed modeling framework could be implemented.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>With zero or negative values of change growth experienced, it was concluded that cost contingencies were overallocated at the contract stage. On the other hand, with positive values of change growth experienced, it was evaluated that set cost contingencies were insufficient from the post-construction standpoint. Taken together, this study proposed a tangible post-construction evaluation technique that can produce not only the plausible ranges of cost contingencies but also the exact amounts of contingency under DBB and DB contracts.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>As the first of its kind, the proposed modeling framework provides agency engineers and decision-makers with tangible assessments of cost contingency coupled with experienced risks at the post-construction stage. Use of the proposed model will help them evaluate the allocation of appropriate contingency amounts. If an agency allocates a cost contingency benchmarked from similar projects on aspects of the base estimate and experienced risks, a set contingency can be defended more reliably. The main findings of this study contribute to post-construction cost contingency verification, enabling agency engineers and decision-makers to systematically evaluate set cost contingencies during the post-construction assessment stage and achieving further any enhanced level of confidence for future cost contingency plans.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"9 2 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502953","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Duration and resource constraint prediction models for construction projects using regression machine learning method 使用回归机器学习方法的建筑项目工期和资源限制预测模型
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-25 DOI: 10.1108/ecam-06-2023-0582
Gopinath Selvam, Mohan Kamalanandhini, Muthuvel Velpandian, Sheema Shah
{"title":"Duration and resource constraint prediction models for construction projects using regression machine learning method","authors":"Gopinath Selvam, Mohan Kamalanandhini, Muthuvel Velpandian, Sheema Shah","doi":"10.1108/ecam-06-2023-0582","DOIUrl":"https://doi.org/10.1108/ecam-06-2023-0582","url":null,"abstract":"&lt;h3&gt;Purpose&lt;/h3&gt;\u0000&lt;p&gt;The construction projects are highly subjected to uncertainties, which result in overruns in time and cost. Realistic estimates of workforce and duration are imperative for construction projects to attain their intended objectives. The aim of this study is to provide accurate labor and duration estimates for the construction projects, considering actual uncertainties.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Design/methodology/approach&lt;/h3&gt;\u0000&lt;p&gt;The dataset was formulated from the information collected from 186 construction projects through direct interviews, group discussions and questionnaire methods. The actual uncertainties and exposure conditions of construction activities were recorded. The data were verified with the standard guideline to remove the outliers. The prediction model was developed using support vector regression (SVR), a machine learning (ML) method. The performance was evaluated using the widely adopted regression metrics. Further, the cross validation was made with the visualization of residuals and predicted errors, ridge regression with transformed target distribution and a Gaussian Naive Bayes (NB) regressor.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Findings&lt;/h3&gt;\u0000&lt;p&gt;The prediction models predicted the duration and labor requirements with the consideration of actual uncertainties. The residual plot indicated the appropriate use of SVR to develop the prediction model. The duration (DC) and resource constraint (RC) prediction models obtained 80 and 82% accuracy, respectively. Besides, the developed model obtained better accuracy for the training and test scores than the Gaussian NB regressor. Further, the range of the explained variance score and R&lt;sup&gt;2&lt;/sup&gt; was from 0.95 to 0.97, indicating better efficiency compared with other prediction models.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Research limitations/implications&lt;/h3&gt;\u0000&lt;p&gt;The researchers will utilize the research findings to estimate the duration and labor requirements under uncertain conditions and further improve the construction project management practices.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Practical implications&lt;/h3&gt;\u0000&lt;p&gt;The research findings will enable industry practitioners to accurately estimate the duration and labor requirements, considering historical uncertain conditions. A precise estimation of resources will ensure the attainment of the intended project outcomes.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Social implications&lt;/h3&gt;\u0000&lt;p&gt;Delays in construction projects will be reduced by implementing the research findings, which significantly ensures the effective utilization of resources and attainment of other economic benefits. The policymakers will develop a guideline to develop a database to collect the uncertainties of the construction projects and relatively estimate the resource requirements.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Originality/value&lt;/h3&gt;\u0000&lt;p&gt;This is the first study to consider the actual uncertainties of construction projects to develop RC and DC prediction","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"45 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502954","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Research on technical suitability analysis and scheme selection of prefabricated buildings in China 中国预制装配式建筑技术适用性分析与方案选择研究
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-20 DOI: 10.1108/ecam-01-2024-0049
Layin Wang, Rongfang Huang, Xiaoyu Li
{"title":"Research on technical suitability analysis and scheme selection of prefabricated buildings in China","authors":"Layin Wang, Rongfang Huang, Xiaoyu Li","doi":"10.1108/ecam-01-2024-0049","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0049","url":null,"abstract":"&lt;h3&gt;Purpose&lt;/h3&gt;\u0000&lt;p&gt;China is a large country with different regions due to regional differences and project characteristics, and the selection of prefabricated building technology according to local conditions is the key to its sustainable development in China. The purpose of this paper is to develop the suitability evaluation system of prefabricated building technology from the perspective of the suitability concept and to analyze the selection path of prefabricated building technology and to provide a reference for selecting and developing prefabricated building technology schemes that meet regional endowments.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Design/methodology/approach&lt;/h3&gt;\u0000&lt;p&gt;Based on relevant literature, technical specifications, and standards, this paper constructs an index system for analyzing the technical suitability of prefabricated buildings. It includes 23 indicators, 7 dimensions, and 3 aspects through the semantic clustering method. Following this, the comprehensive weight of each index is determined using the order relation method (G1) and the continuous ordered weighted averaging (COWA). The selection of technical schemes is comprehensively evaluated using Visekriterjumska Optimizacija Ikompromisno Resenje (VIKOR) and Fuzzy Comprehensive Evaluation Method.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Findings&lt;/h3&gt;\u0000&lt;p&gt; (1) The technical suitability of prefabricated buildings is influenced by 7 core factors, such as adaptability of resources and environment, project planning and design level, and economic benefit; (2) When selecting the appropriate technology for prefabricated buildings, economic suitability should be considered first, followed by regional suitability, and then technical characteristic; (3) The prefabricated building technology suitability evaluation model constructed in this paper has high feasibility in the technical suitability selection of the example project.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Research limitations/implications&lt;/h3&gt;\u0000&lt;p&gt;The comprehensive evaluation model of prefabricated building technology suitability constructed in this paper provides technical selection support for the promotion and development of prefabricated buildings in different regions. In addition, the model can also be widely used in areas related to prefabricated building consulting and decision-making, and provides theoretical support for subsequent research.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Practical implications&lt;/h3&gt;\u0000&lt;p&gt;This study provides a new decision support tool for prefabricated building technology suitability selection, which helps decision makers to make more rational technology choices.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Social implications&lt;/h3&gt;\u0000&lt;p&gt;This study has a positive impact on the advancement of prefabricated building technology, the improvement of construction industry standards, and the promotion of sustainable development.&lt;/p&gt;&lt;!--/ Abstract__block --&gt;\u0000&lt;h3&gt;Originality/value&lt;/h3&gt;\u0000&lt;p&gt;The contribution of this study is twofold: (1) ","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"30 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513599","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Enhancing precision and efficiency in English bond brick masonry: novel unified templates approach 提高英式粘结砖砌体的精度和效率:新型统一模板法
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-19 DOI: 10.1108/ecam-01-2024-0044
Vikas Mehta, Mohindra Singh Thakur
{"title":"Enhancing precision and efficiency in English bond brick masonry: novel unified templates approach","authors":"Vikas Mehta, Mohindra Singh Thakur","doi":"10.1108/ecam-01-2024-0044","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0044","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>This study aims to enhance the precision and efficiency of English Bond brick masonry by developing three unified templates: Tc, T1, and T2. These templates are designed to address the complexities in the placement of bricks, particularly queen closers and brickbats, in English Bond patterns.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>The research introduces a unique numbering system integrated within each template to facilitate accurate brick placement. Template Tc is designed explicitly for corner masonry, while T1 and T2 are developed for linear masonry along the X and Y directions, respectively. The approach standardizes the bricklaying process, ensuring proper alignment and bricks overlap.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Applying these templates significantly improves the efficiency and pace of English bond brick masonry. They simplify the construction process, reduce errors, and enhance the overall quality of masonry work. The study demonstrates that using these templates results in consistent and high-quality brickwork, surpassing traditional speed, efficiency, and accuracy methods.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study contributes a novel, systematic approach to bricklaying in English Bond masonry. The introduction of unified templates aids in skill acquisition for professionals and learners, ensuring flawless execution of masonry projects. This innovative approach holds great value in modern construction practices, promoting standardization and excellence in masonry work.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"139 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502955","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A green project scheduling with material ordering problem considering cost constraints and quality of materials 考虑成本约束和材料质量的绿色项目材料订购调度问题
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-18 DOI: 10.1108/ecam-01-2024-0004
Omid Kebriyaii, Ali Heidari, Mohammad Khalilzadeh, Dragan Pamucar
{"title":"A green project scheduling with material ordering problem considering cost constraints and quality of materials","authors":"Omid Kebriyaii, Ali Heidari, Mohammad Khalilzadeh, Dragan Pamucar","doi":"10.1108/ecam-01-2024-0004","DOIUrl":"https://doi.org/10.1108/ecam-01-2024-0004","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>Integrating project scheduling and material ordering problems is vital in realistically estimating project cost and duration. Also, the quality level of materials is important as one of the key project success factors.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>In this paper, a three-objective mathematical model is presented for green project scheduling with materials ordering problems considering rental resources. The first objective is to minimize the total cost of the project site and logistics. The second objective is to minimize the environmental impacts of producing materials and the third objective is to maximize the total quality of materials. Since costs trigger several challenges in projects, cost constraints are considered in this model for the first time and also the cost of delay in supplying of materials by the suppliers has been deducted from the project costs. Subsequently, the model was implemented in a real case and solved by the Lagrangian Relaxation algorithm as an exact method on GAMS software for model validation.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>Based on sensitivity analysis of some parameters, the findings indicate that the cost constraint and lead time have considerable effects on the project duration. Also, integrating project scheduling and material ordering improves the robustness of the project schedule.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The primary contributions of the present research can be stated as follows: considering the cost constraints in the project scheduling with material ordering problem, incorporating the rental resources and taking the quality levels of materials as well as the environmental impacts into account.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"21 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502892","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Schedule-cost optimization in high-rise buildings considering uncertainty 考虑不确定性的高层建筑进度成本优化
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-18 DOI: 10.1108/ecam-12-2023-1217
Jinting Huang, Ankang Ji, Zhonghua Xiao, Limao Zhang
{"title":"Schedule-cost optimization in high-rise buildings considering uncertainty","authors":"Jinting Huang, Ankang Ji, Zhonghua Xiao, Limao Zhang","doi":"10.1108/ecam-12-2023-1217","DOIUrl":"https://doi.org/10.1108/ecam-12-2023-1217","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>The paper aims to develop a useful tool that can reliably and accurately find the critical paths of high-rise buildings and provide optimal solutions considering the uncertainty based on Monte Carlo simulation (MCS) to enhance project implementation performance by assisting site workers and project managers in high-rise building engineering.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This research proposes an approach integrating the improved nondominated sorting genetic algorithm II (NSGA-II) considering uncertainty and delay scenarios simulated by MCS with the technique for order preference by similarity to an ideal solution.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>The results demonstrate that the proposed approach is capable of generating optimal solutions, which can improve the construction performance of high-rise buildings and guide the implementation management for shortening building engineering project schedule and cost under the delay conditions.</p><!--/ Abstract__block -->\u0000<h3>Research limitations/implications</h3>\u0000<p>In this study, only the construction data of the two floors was focused due to the project at the construction stage, and future work can analyze the whole construction stage of the high-rise building to examine the performance of the approach, and the multi-objective optimization (MOO) only considered two factors as objectives, where more objectives, such as schedule, cost and quality, can be expanded in future.</p><!--/ Abstract__block -->\u0000<h3>Practical implications</h3>\u0000<p>The approach proposed in this research can be successfully applied to the construction process of high-rise buildings, which can be a guidance basis for optimizing the performance of high-rise building construction.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>The innovations and advantages derived from the proposed approach underline its capability to handle project construction scheduling optimization (CSO) problems with different performance objectives under uncertainty and delay conditions.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"20 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141502956","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Knowledge fusion-driven sustainable decision-making for mega transportation infrastructure projects 超大型交通基础设施项目的知识融合驱动可持续决策
IF 4.1 2区 工程技术
Engineering, Construction and Architectural Management Pub Date : 2024-06-14 DOI: 10.1108/ecam-08-2023-0817
Long Li, Haiying Luan, Mengqi Yuan, Ruiyan Zheng
{"title":"Knowledge fusion-driven sustainable decision-making for mega transportation infrastructure projects","authors":"Long Li, Haiying Luan, Mengqi Yuan, Ruiyan Zheng","doi":"10.1108/ecam-08-2023-0817","DOIUrl":"https://doi.org/10.1108/ecam-08-2023-0817","url":null,"abstract":"<h3>Purpose</h3>\u0000<p>As the scale of mega transportation infrastructure projects (MTIs) continues to expand, the complexity of engineering construction sharply increases and decision-making sustainability faces severe challenges. Decision-making for mega transportation infrastructure projects unveils the knowledge-intensive characteristic, requiring collaborative decisions by cross-domain decision-makers. However, the exploration of heterogeneous knowledge fusion-driven decision-making problems is limited. This study aims to improve the deficiencies of existing decision-making by constructing a knowledge fusion-driven multi-attribute group decision model under fuzzy context to improve the sustainability of MTIs decision-making.</p><!--/ Abstract__block -->\u0000<h3>Design/methodology/approach</h3>\u0000<p>This study utilizes intuitionistic fuzzy information to handle uncertain information; calculates decision-makers and indicators weights by hesitation, fuzziness and intuitionistic fuzzy entropy; applies the intuitionistic fuzzy weighted averaging (IFWA) operator to fuse knowledge and uses consensus to measure the level of knowledge fusion. Finally, a calculation example is given to verify the rationality and effectiveness of the model.</p><!--/ Abstract__block -->\u0000<h3>Findings</h3>\u0000<p>This research finally constructs a two-level decision model driven by knowledge fusion, which alleviates the uncertainty and fuzziness of decision knowledge, promotes knowledge fusion among cross-domain decision-makers and can be effectively applied in practical applications.</p><!--/ Abstract__block -->\u0000<h3>Originality/value</h3>\u0000<p>This study provides an effective decision-making model for mega transportation infrastructure projects and guides policymakers.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"7 1","pages":""},"PeriodicalIF":4.1,"publicationDate":"2024-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141513600","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信