提高英式粘结砖砌体的精度和效率:新型统一模板法

IF 3.6 2区 工程技术 Q1 ENGINEERING, CIVIL
Vikas Mehta, Mohindra Singh Thakur
{"title":"提高英式粘结砖砌体的精度和效率:新型统一模板法","authors":"Vikas Mehta, Mohindra Singh Thakur","doi":"10.1108/ecam-01-2024-0044","DOIUrl":null,"url":null,"abstract":"<h3>Purpose</h3>\n<p>This study aims to enhance the precision and efficiency of English Bond brick masonry by developing three unified templates: Tc, T1, and T2. These templates are designed to address the complexities in the placement of bricks, particularly queen closers and brickbats, in English Bond patterns.</p><!--/ Abstract__block -->\n<h3>Design/methodology/approach</h3>\n<p>The research introduces a unique numbering system integrated within each template to facilitate accurate brick placement. Template Tc is designed explicitly for corner masonry, while T1 and T2 are developed for linear masonry along the X and Y directions, respectively. The approach standardizes the bricklaying process, ensuring proper alignment and bricks overlap.</p><!--/ Abstract__block -->\n<h3>Findings</h3>\n<p>Applying these templates significantly improves the efficiency and pace of English bond brick masonry. They simplify the construction process, reduce errors, and enhance the overall quality of masonry work. The study demonstrates that using these templates results in consistent and high-quality brickwork, surpassing traditional speed, efficiency, and accuracy methods.</p><!--/ Abstract__block -->\n<h3>Originality/value</h3>\n<p>This study contributes a novel, systematic approach to bricklaying in English Bond masonry. The introduction of unified templates aids in skill acquisition for professionals and learners, ensuring flawless execution of masonry projects. This innovative approach holds great value in modern construction practices, promoting standardization and excellence in masonry work.</p><!--/ Abstract__block -->","PeriodicalId":11888,"journal":{"name":"Engineering, Construction and Architectural Management","volume":"139 1","pages":""},"PeriodicalIF":3.6000,"publicationDate":"2024-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Enhancing precision and efficiency in English bond brick masonry: novel unified templates approach\",\"authors\":\"Vikas Mehta, Mohindra Singh Thakur\",\"doi\":\"10.1108/ecam-01-2024-0044\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<h3>Purpose</h3>\\n<p>This study aims to enhance the precision and efficiency of English Bond brick masonry by developing three unified templates: Tc, T1, and T2. These templates are designed to address the complexities in the placement of bricks, particularly queen closers and brickbats, in English Bond patterns.</p><!--/ Abstract__block -->\\n<h3>Design/methodology/approach</h3>\\n<p>The research introduces a unique numbering system integrated within each template to facilitate accurate brick placement. Template Tc is designed explicitly for corner masonry, while T1 and T2 are developed for linear masonry along the X and Y directions, respectively. The approach standardizes the bricklaying process, ensuring proper alignment and bricks overlap.</p><!--/ Abstract__block -->\\n<h3>Findings</h3>\\n<p>Applying these templates significantly improves the efficiency and pace of English bond brick masonry. They simplify the construction process, reduce errors, and enhance the overall quality of masonry work. The study demonstrates that using these templates results in consistent and high-quality brickwork, surpassing traditional speed, efficiency, and accuracy methods.</p><!--/ Abstract__block -->\\n<h3>Originality/value</h3>\\n<p>This study contributes a novel, systematic approach to bricklaying in English Bond masonry. The introduction of unified templates aids in skill acquisition for professionals and learners, ensuring flawless execution of masonry projects. This innovative approach holds great value in modern construction practices, promoting standardization and excellence in masonry work.</p><!--/ Abstract__block -->\",\"PeriodicalId\":11888,\"journal\":{\"name\":\"Engineering, Construction and Architectural Management\",\"volume\":\"139 1\",\"pages\":\"\"},\"PeriodicalIF\":3.6000,\"publicationDate\":\"2024-06-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering, Construction and Architectural Management\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1108/ecam-01-2024-0044\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering, Construction and Architectural Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1108/ecam-01-2024-0044","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

目的 本研究旨在通过开发三种统一模板来提高英式粘结砖砌体的精度和效率:Tc、T1 和 T2。这些模板旨在解决英式邦德砖砌体图案中砖块(尤其是后收口砖和砖块)摆放的复杂性。模板 Tc 专为转角砌筑而设计,而 T1 和 T2 则分别为沿 X 和 Y 方向的线性砌筑而开发。这些模板的应用大大提高了英式粘结砖砌筑的效率和速度。它们简化了施工过程,减少了错误,并提高了砌筑工作的整体质量。研究表明,使用这些模板可以获得一致的高质量砖砌体,在速度、效率和准确性方面都超过了传统方法。统一模板的引入有助于专业人员和学习者掌握技能,确保完美无瑕地完成砌筑工程。这种创新方法在现代建筑实践中具有重要价值,可促进砌筑工作的标准化和卓越性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Enhancing precision and efficiency in English bond brick masonry: novel unified templates approach

Purpose

This study aims to enhance the precision and efficiency of English Bond brick masonry by developing three unified templates: Tc, T1, and T2. These templates are designed to address the complexities in the placement of bricks, particularly queen closers and brickbats, in English Bond patterns.

Design/methodology/approach

The research introduces a unique numbering system integrated within each template to facilitate accurate brick placement. Template Tc is designed explicitly for corner masonry, while T1 and T2 are developed for linear masonry along the X and Y directions, respectively. The approach standardizes the bricklaying process, ensuring proper alignment and bricks overlap.

Findings

Applying these templates significantly improves the efficiency and pace of English bond brick masonry. They simplify the construction process, reduce errors, and enhance the overall quality of masonry work. The study demonstrates that using these templates results in consistent and high-quality brickwork, surpassing traditional speed, efficiency, and accuracy methods.

Originality/value

This study contributes a novel, systematic approach to bricklaying in English Bond masonry. The introduction of unified templates aids in skill acquisition for professionals and learners, ensuring flawless execution of masonry projects. This innovative approach holds great value in modern construction practices, promoting standardization and excellence in masonry work.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Engineering, Construction and Architectural Management
Engineering, Construction and Architectural Management Business, Management and Accounting-General Business,Management and Accounting
CiteScore
8.10
自引率
19.50%
发文量
226
期刊介绍: ECAM publishes original peer-reviewed research papers, case studies, technical notes, book reviews, features, discussions and other contemporary articles that advance research and practice in engineering, construction and architectural management. In particular, ECAM seeks to advance integrated design and construction practices, project lifecycle management, and sustainable construction. The journal’s scope covers all aspects of architectural design, design management, construction/project management, engineering management of major infrastructure projects, and the operation and management of constructed facilities. ECAM also addresses the technological, process, economic/business, environmental/sustainability, political, and social/human developments that influence the construction project delivery process. ECAM strives to establish strong theoretical and empirical debates in the above areas of engineering, architecture, and construction research. Papers should be heavily integrated with the existing and current body of knowledge within the field and develop explicit and novel contributions. Acknowledging the global character of the field, we welcome papers on regional studies but encourage authors to position the work within the broader international context by reviewing and comparing findings from their regional study with studies conducted in other regions or countries whenever possible.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信