T. Ahonen, Joonas Lehtovaara, A. Peltokorpi, P. Uusitalo
{"title":"Continuous Improvement of Takt Production With Data-Driven Knowledge Management Approach","authors":"T. Ahonen, Joonas Lehtovaara, A. Peltokorpi, P. Uusitalo","doi":"10.24928/2022/0140","DOIUrl":"https://doi.org/10.24928/2022/0140","url":null,"abstract":"This study investigates how data-based continuous improvement could be applied in construction projects utilizing takt production. The purpose is to define a process model that will guide how such a continuous improvement system can be created in an organization utilizing takt production methods, and how the system can then be improved. This research follows design science approach to highlight the practicality of the solution. Research consists of diagnosis, process model creation, validation of the process model, discussion, and conclusion. Diagnosis is performed with a literature review and empirical research, including interviews and observations of current practices in a case company. Validation is performed by collecting external feedback and by organizing internal interviews. The findings indicate that the created process model provides a system that can be used to improve the takt production process with data, and that the process can be supported by also handling tacit knowledge. A defined learning system will help in tackling the current barriers facing the construction industry related to inefficient data processing and unclear knowledge management. As the system utilizes the terminology and theory of takt production, it is proposed that the system can be expanded to other projects and construction functions with further research.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116900061","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Lynn Shehab, Elyar Pourrahimian, Diana Salhab, F. Hamzeh
{"title":"LPS Performance Diagnosis Model Using Fuzzy Inference System","authors":"Lynn Shehab, Elyar Pourrahimian, Diana Salhab, F. Hamzeh","doi":"10.24928/2022/0206","DOIUrl":"https://doi.org/10.24928/2022/0206","url":null,"abstract":"The Last Planner System (LPS) has long been used in construction projects to promote reliable planning and enhance productivity. However, despite various attempts to evaluate LPS implementation efforts, the human aspect of the evaluation attempts has not been given enough attention. This issue may be tackled through Fuzzy Inference Systems (FIS) to capture more information regarding the gradual and intricate changes in scoring systems. Therefore, this paper aims to offer a standardized diagnosis model for LPS performance in construction projects. This model employs an FIS that analyzes the results of an LPS implementation for a more accurate investigation of the implementation. First, a thorough literature review is conducted to select the most prominent factors influencing the LPS implementation process, followed by expert panel questionnaire development and distribution among LPS experts to rank the selected factors. The obtained questionnaire results are then used to develop the FIS. The objective of this paper is hereby twofold: (1) to allow assessing expected LPS benefits through the qualitative assessment of the performance in the four LPS phases, and (2) to facilitate comparing past, current, and future performances throughout the organization's LPS implementation process to ensure continuous improvement. the factors factors model","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"125 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123654446","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Empirical Validation of Lean Implementation Barriers in Engineer-to-Order Companies: An Exploratory Study","authors":"Felix Schulze, P. Dallasega","doi":"10.24928/2022/0192","DOIUrl":"https://doi.org/10.24928/2022/0192","url":null,"abstract":"Enterprises employing an Engineer-to-Order (ETO) manufacturing strategy produce complex products designed specifically to customer requirements, on a project basis, under time and cost constraints. As a result of this complexity, wastes and inefficiency occur within the internal and external supply chain. To improve productivity, companies are striving to implement Lean practices in ETO environments but encounter implementation barriers. Based on the comprehensive literature study on Lean implementation barriers in ETO companies, this study empirically validates the occurrence of these barriers in practice. For this purpose, empirical evidence was gathered using a survey questionnaire followed by semi-structured interviews with 15 companies from the ETO sector in construction, mechanical engineering, and shipbuilding. As a result, the barriers mentioned in the literature are compared with the barriers that occur in practice. Simultaneously, new barriers not described in the literature are also identified. This study can guide Lean professionals in the ETO environment in their Lean efforts to identify corresponding barriers in their own organizations while trying to understand the relevant causes and fields of action to mitigate them. Future research should aim to explore other methods and strategies along with emerging technologies of Industry 4.0 that could help overcome Lean implementation barriers.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"53 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125764911","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Value-Adding Index - Share of Direct Work Included in Uninterrupted Presence Time","authors":"Christopher Görsch, Zhao Jianyu, O. Seppänen","doi":"10.24928/2022/0115","DOIUrl":"https://doi.org/10.24928/2022/0115","url":null,"abstract":"Continuous improvement depends on appropriate productivity measures. Productivity can be measured through time-motion studies but relies heavily on manual efforts and therefore contributes insufficiently to real-time awareness in dynamic environments such as construction. Indoor positioning shows potential determining shares of construction workers VA (Value-adding), based on Bluetooth Low Energy technology in real-time. Different studies show positive correlations between VA and productivity. However, it is unknown from location data how much workers engage in VA work while being present. Applying both methods simultaneously to one worker, this paper shows how to numerically quantify direct work (DW) and VA. Such combined data can show how much VA and DW occur when uninterrupted presence is detected while applying thresholds, indicating minimum durations spent inside work locations. Utilizing a small data sample enabled proof-of-concept testing and resulted in numerical quantifications of DW and VA. Preliminary findings show larger proportions of DW and VA when uninterrupted presence time is higher. Future research needs to enlarge the included data. If findings hold true, uninterrupted presence with higher thresholds could predict more accurate workers´ VA levels in real-time. The study also contributes to knowledge positively impacting construction by bridging workers’ behaviors on-site with monitoring technologies detecting movement.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128200278","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Pooria Golestanirad, Zofia K. Rybkowski, M. Dixit, Gregory A. Luhan
{"title":"Building Interdisciplinary Teams Through Student Design Competitions: A Case Study","authors":"Pooria Golestanirad, Zofia K. Rybkowski, M. Dixit, Gregory A. Luhan","doi":"10.24928/2022/0222","DOIUrl":"https://doi.org/10.24928/2022/0222","url":null,"abstract":"The owner, architecture, engineering, and construction (OAEC) industries have grown increasingly complex, necessitating improvements to both design and construction procedures—requiring increased collaboration among all lean stakeholders. However, universities are often criticized for not developing essential, generic skills in their graduates, especially the ability to work collaboratively in teams. Attempting to better prepare students, academic institutions are creating vehicles to help their students acquire effective teamwork skills. Competitions, for example, have spread to almost every discipline, including the OAEC-related ones, since they have much to offer students of the built environment. The researchers assessed the participants’ experience of an interdisciplinary design competition to determine if such competitions are an effective means to impart teamwork skills to future collaborative stakeholders of the built environment. Additionally, this research aimed to identify areas where educators should prioritize their efforts to better prepare students for enhanced teamwork performance. In addition to highlighting that teams should be appropriately composed of members with critical, needed skill sets, results from a post-event survey of the case study competition also suggest there is a need to teach students how to develop clear and shared goals, develop clear and understandable roles, and communicate more effectively when working in teams.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"18 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127456278","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Superior Contractor Performance: a Barrier to Lean Construction Adoption in Australia","authors":"M. Stevens","doi":"10.24928/2022/0157","DOIUrl":"https://doi.org/10.24928/2022/0157","url":null,"abstract":"The Australian construction industry produces twice as much value per dollar while enduring four times the competition than manufacturing. Impressively, this sector outpaces six of nine major industries in the country. However, their quantitative success may dampen Lean Construction's adoption, hurting the industry long-term. Practices significantly transform the value of the inputs, and contractors do it better than manufacturing. However, the industry is much riskier than manufacturing, so contractors hesitate to change to new ones quickly. It appears that organisations will not rapidly adopt Lean's methodology partially due to the success and risk of the Australian construction Industry. This paper proposes a survey methodology of practices to convince contractors of Lean Construction’s improvement potential. Obviously, they should search wherever there may be promising methods. However, this research outlines a straightforward process to validate valuable practices that can be executed internally in the industry and clarify practices' value and timely completion. The aim is to convince already superior performing contractors to see the LC approach as a competitive opportunity.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"120 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130130698","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Raviteja Vaitla, Vrinda A. Gaikwad, A. S, Jonghan Yoon
{"title":"Developing a Multi Project-Collaboration Based IPD Framework for Small & Medium Scale Enterprises in the Construction Industry","authors":"Raviteja Vaitla, Vrinda A. Gaikwad, A. S, Jonghan Yoon","doi":"10.24928/2022/0179","DOIUrl":"https://doi.org/10.24928/2022/0179","url":null,"abstract":"Small and medium enterprises (SME) in construction projects frequently struggle to manage labour, materials, finances, and equipment. The Integrated Project Delivery method (IPD) has the potential to solve these challenges. However, the existing IPD framework has a low feasibility rate in SMEs due to technological, financial, and managerial challenges. This is because IPD is a project delivery system that requires adequate capital, communication channels, software, training for workers, etc. which are usually available with large-scale construction projects but not with SME-based projects. Accordingly, this paper proposes a new IPD framework more specific to small and medium scale construction projects by improving the existing framework in terms of resource management and cross-validation of stakeholders. The proposed framework enables the SME projects to acquire and manage the resources for conducting IPD through the concept of “Multi-Project collaboration”. In the collaboration, multiple contractors with individual projects cooperate with one another for achieving a positive impact on their performance through the IPD method. This study contributes to the body of knowledge by enabling the construction industry to understand the effective application of the IPD method to SME projects.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123412450","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Sean M. Mulholland, M. Banasiak, C. Clevenger, Jamie Staton, Qadry Brown
{"title":"Establishing Design Metrics to Inform Design Change, Increase Project Team Communication, and Reduce Waste: A Healthcare Case Study","authors":"Sean M. Mulholland, M. Banasiak, C. Clevenger, Jamie Staton, Qadry Brown","doi":"10.24928/2022/0223","DOIUrl":"https://doi.org/10.24928/2022/0223","url":null,"abstract":"This study aims to evaluate via a case study the process in establishing post-construction performance goals and their perceived impact to a design and construction project team’s culture. Performance goals were established from an iterative quantitative approach, while the impact to the design and construction team were evaluated by a qualitative method. Preliminary results appear to indicate a likely positive impact to a project team’s culture, level of effort, and trust. Specifically, results may indicate a net positive impact from unambiguous post-construction performance goals to a project team’s perception of its communication and overall project environment, reduction in traditional sources of process waste, and a positive impact to elements associated with cost, schedule, and quality.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122794068","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Diego Cisterna, Svenja Lauble, Shervin Haghsheno, Jan Wolber
{"title":"Synergies Between Lean Construction and Artificial Intelligence: AI Driven Continuous Improvement Process","authors":"Diego Cisterna, Svenja Lauble, Shervin Haghsheno, Jan Wolber","doi":"10.24928/2022/0122","DOIUrl":"https://doi.org/10.24928/2022/0122","url":null,"abstract":"Both, Lean Construction (LC) techniques and Artificial Intelligence (AI) methods strive for the continuous improvement of production systems in projects and organizations. A combined implementation of both approaches is an ongoing research area. Therefore, the question arises as to whether the added value generated by implementing both approaches jointly is greater than the added value generated by implementing them independently and what is the significance of people in their combined use. This paper explores theoretically the potential of synergies between LC and AI in the AEC sector with exemplary use cases as well as their resulting effects. Humans play a crucial role as interface between a combined use of both of them. As a result, a framework containing LC, AI and people is formed as basis for further combined developments. Therefore, change management, an area in which Lean has spent several years developing, can help both approaches gain traction. With the results, targeted applications can be developed, and practice can be supported.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"2015 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122921197","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Gustavo B. Bellaver, Diego O. R. S. Santos, Bernardo Etges, Pablo Santos, Wesley de S. Mota
{"title":"Implementing Lookahead Planning and Digital Tools to Enable Scalability and Set of Information in a Multi-Site Lean Implementation","authors":"Gustavo B. Bellaver, Diego O. R. S. Santos, Bernardo Etges, Pablo Santos, Wesley de S. Mota","doi":"10.24928/2022/0186","DOIUrl":"https://doi.org/10.24928/2022/0186","url":null,"abstract":"This paper seeks to demonstrate the implementation of lookahead planning in the current largest construction company and developer in Latin America and how best to consolidate and manage data from a large number of construction sites. This is demonstrated starting with the planning of the implementation pilot, defining the routine model, the participants, the methodology and tools and goes on to the part of continuous improvement within the implementation cycles. The project expansion and project support stages reached 162 sites within a year. This was split into three implementation cycles, led to training 40 multipliers in the lean philosophy and the last planner system within the company in question. The article also presents difficulties encountered in the process of implementing this high volume of sites. Using the preliminary data collected in the routines, it was identified that more than 56% of the restrictions are not removed on time and these, when delayed, cause a delay of 20 days. In addition, it was identified that material correspond to approximately 55% of the total restrictions found in the survey.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132752956","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}