P. Arroyo, Annett Schöttle, R. Christensen, Chad Arthur
{"title":"CBA as a Differentiator to Win Projects in Pursuit: A Case Study","authors":"P. Arroyo, Annett Schöttle, R. Christensen, Chad Arthur","doi":"10.24928/2022/0196","DOIUrl":"https://doi.org/10.24928/2022/0196","url":null,"abstract":"This paper presents a case study where a Design and Construction project team, general contractor and architect were asked to use Choosing By Advantages (CBA) during the pursuit phase of the project. The paper describes how the design and construction project team implemented CBA throughout the project pursuit, including details surrounding the team’s preparation and decisions developed during confidential conversations with the Owner. Ultimately the team implemented CBA when selecting the structural system, external facade, and the project programming. The researchers integrated the Owner's perspective to understand the motive(s) to utilize the CBA decision making method, why they chose the winning team, and the ways CBA methodologies were implemented beyond the project pursuit phase. This paper presents unique viewpoints, from both the project team and Owner’s, on the benefits of using CBA during project pursuit and beyond. The aim of sharing this case study is to inspire more owners to request the use of the CBA method at the start of the project. Choosing By Advantages simplifies the internal decision-making process, which many team find as a challenge. CBA allows for project teams to approach owners with a decision-making process that allows for optimal owner feedback leading to productivity and clarity within the phases of the project.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115407080","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Hybrid Simulation for Value Stream Mapping to Improve the Environmental Performance of the Construction Phase","authors":"D. T. Nguyen, Walter Sharmak","doi":"10.24928/2022/0145","DOIUrl":"https://doi.org/10.24928/2022/0145","url":null,"abstract":"The environmental impact assessment of the construction phase is often not fully considered compared to other phases of the project life cycle. Previous studies on environmental impact reduction have often focused on technical aspects rather than organisational aspects. The value stream mapping (VSM) method has been extended to capture and improve environmental performance by systematically adopting lean methods in the manufacturing process. However, in the construction field, this approach encounters difficulties establishing state maps and considering the interrelationships between different processes in an uncertain and dynamic environment. This study proposes a hybrid approach combining Multi-Agent Systems (MAS) and System Dynamics (SD) based on process patterns to overcome these obstacles. First, process patterns, including activity packages, are developed to assist the VSM in creating state maps and identifying environmental impact sources. Then, construction operations with their state maps and needed resources are modelled as autonomous agents containing causal-effect loops (SD modules) in a MAS model. These agents interact with each other to describe the construction operating mechanism. Finally, different lean methods are analysed to find opportunities to improve environmental performance.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"99 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123786690","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Tulika Majumdar, Steinar G. Rasmussen, A. A. D. Savio, Katrin Johannesdottír, E. Hjelseth, Martin Fischer
{"title":"VDC in Practice: A Preliminary Categorization of Production Metrics Reported in Scandinavia and Latin America","authors":"Tulika Majumdar, Steinar G. Rasmussen, A. A. D. Savio, Katrin Johannesdottír, E. Hjelseth, Martin Fischer","doi":"10.24928/2022/0230","DOIUrl":"https://doi.org/10.24928/2022/0230","url":null,"abstract":"Architecture, Engineering and Construction (AEC) teams are increasingly using emerging management methods involving collaboration, lean construction, and digitization for managing projects. Production metrics (PM) are being used to assess the impact of these methods on project performance during run-time. A lack of common vocabulary hinders comparison of PM, making it difficult to repeat strategies used for improving project performance and for benchmarking PM across projects. Through a detailed content analysis, 2 datasets of 904 PM reported by 195 Virtual Design and Construction (VDC) practitioners in Scandinavia and Latin America were curated. Qualitative coding was used to categorize the PM into the three key VDC elements, i.e., Integrated Concurrent Engineering (ICE), Building Information Modeling (BIM) and Project Production Management (PPM) and to validate the categorization. This research enabled a comparison of PM categories across the two regions for the first time. PM categorized as ICE and PPM were reported by more than 68% professionals in both the regions. BIM PM had a disparity in reporting (Scandinavia: 30%, Latin America: 91%). It also opened a pathway to develop a common vocabulary of PM to compare, benchmark and standardize PM across VDC implementations. Technology (NTNU) and Universidad De Lima (ULima). AEC professionals enrolled in the VDCCP learn the fundamentals of VDC in a 1-week introductory workshop and implement VDC on their ongoing projects for 9 months. They define PM for their projects at the beginning of the implementation and explain through monthly reports if and how the PM enabled effective course correction.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114389909","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Strategic Partnering Between Contractors and Designers","authors":"Sigurd B. Paulsen, Atle Engebø, O. Lædre","doi":"10.24928/2022/0134","DOIUrl":"https://doi.org/10.24928/2022/0134","url":null,"abstract":"In recent years, the concept of strategic partnering has gained attention in the Norwegian construction industry. As a project delivery method, strategic partnering shares similarities with the Lean project delivery perspective as they both seek to achieve more collaborative projects. The paper has structured strategic partnering into three essential Lean Construction (LC) elements: contract, organization, and collaboration. Consequently, this paper contributes to knowledge about strategic partnering between contractors and designers by answering the two research questions: 1) How is the current practice associated with strategic partnering, and 2) What are the experiences with strategic partnering between contractors and designers. An exploratory case study was conducted to examine how strategic partnering can be improved in future projects. A combination of literature review and semi-structured interviews were used for data collection. The findings reveal an improvement potential when implementing strategic partnering in the construction industry. The paper concludes that more attention should be paid to contract elements and the project organization at the company levels to improve strategic partnering. However, at the individual level, good effects have been identified. Findings also showed that external factors like political decisions can lead to postponements and thus changes in personnel in the organization.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129624100","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Fernando Daniel Lazcano Hernández, E. Armina, Salvador García Rodríguez
{"title":"Visual Management Standard of the Reinforcement Steel Process in Mexico.","authors":"Fernando Daniel Lazcano Hernández, E. Armina, Salvador García Rodríguez","doi":"10.24928/2022/0156","DOIUrl":"https://doi.org/10.24928/2022/0156","url":null,"abstract":"The importance of standardizing processes is one of the basic principles of \"Lean\" practices, it reduces the workload for the Construction Industry. It is important, particularly because of its artisanal process in Mexico. We can ask ourselves, how to adapt the standard with Visual Lean Management of a steel reinforcement work process that is used in Housing in the Construction Industry in Mexico? This attempt is still in its infancy, that is, the vast majority of the processes are not standardized. The studied process is based on the Mexican competency standard ECO-351-Manufacture of structural elements with reinforcing steel, as a spearhead to standardize the processes, of the concepts in general of the construction, to close the entire work cycle of the work, this article aims to highlight the importance and promote standardization, always seeking continuous improvement of the process by the user, but with a visual management approach (VM), so that production workers understand it faster and easier ; it was carried out through the cycle of continuous improvement of Deming (PDCA).","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127736096","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Caroline Silva Araújo, D. Costa, F. Corrêa, E. Ferreira
{"title":"Digital Twins and Lean Construction: Challenges for Future Practical Applications","authors":"Caroline Silva Araújo, D. Costa, F. Corrêa, E. Ferreira","doi":"10.24928/2022/0126","DOIUrl":"https://doi.org/10.24928/2022/0126","url":null,"abstract":"","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131980292","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Eelon Lappalainen, H. Ibrahim, O. Seppänen, I. Palsola
{"title":"Findings on the Use of the Last Planner System—a Case Study","authors":"Eelon Lappalainen, H. Ibrahim, O. Seppänen, I. Palsola","doi":"10.24928/2022/0106","DOIUrl":"https://doi.org/10.24928/2022/0106","url":null,"abstract":"The last planner system™ (LPS) is a production control method used in lean construction projects that has offered good results to construction companies in terms of improving labour productivity, increasing collaboration and the possibility for developing continuous learning. This short study contributes to LPS research on the reliability of promises and how parties perceive their effects on schedule and productivity. The study was conducted using a case study on an industrial construction project in which LPS had been in use since its start. Research data were collected using a semi-structured survey conducted online due to the pandemic. The study also utilized project progress data and measurement data from the LPS sessions. The most interesting result of the study was how little the LPS participants felt they had to compromise their goals. We also found how scheduling methods used in parallel with LPS can frustrate users and contribute to reducing its usefulness. Our findings can be used in further research in several ways, either by utilising the questionnaire we developed or by comparing our findings to other studies. We believe that practitioners using LPS will benefit from our results and can use them to address these shortcomings identified in future projects.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"77 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131094402","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
A. Tezel, Dimosthenis Kifokeris, C. Formoso, L. Koskela, Christian Koch
{"title":"A Conceptual Framework for Lean Construction and Blockchain Synergy","authors":"A. Tezel, Dimosthenis Kifokeris, C. Formoso, L. Koskela, Christian Koch","doi":"10.24928/2022/0162","DOIUrl":"https://doi.org/10.24928/2022/0162","url":null,"abstract":"Blockchain is a distributed ledger technology referring to decentralized databases existing across multiple locations and participants, in which the need for intermediaries to process, validate or authenticate transactions is reduced or eliminated. Such transactions are synchronously held by computer nodes in distributed copies, with cryptographic signatures validated through consensus protocols and transparency achieved through peer-to-peer transactional access among the nodes. Blockchain-based applications can be preferred over centralized databases on the basis of high levels of trust, data security, immutability, transparency, and multi-user consensus protocols. There is growing interest in blockchain in the built environment, with a focus on procurement, the management of supply chain project-life cycle, smart cities, intelligent systems, sustainability, and decentralized organizations. However, there is little discussion on whether and how blockchain will affect the advances in lean construction (LC) and vice versa. This paper therefore proposes a framework that establishes interactions between blockchain and lean construction, which can potentially facilitate the implementation of both. It is based on a synthetic literature review. The results indicate that blockchain can facilitate the implementation of LC (e.g., recording and retrieving of Last Planner data), and vice versa (e.g., value stream mapping guiding the integration of blockchain with processes).","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132669173","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Rodrigo Tuesta, Mark Vicuña, A. A. D. Savio, Alejandro Palpan, Erika Valle, F. Quiroz
{"title":"Prefabricated Reinforcement in Construction Using Vdc: Case Study Ovalo Monitor Bridge","authors":"Rodrigo Tuesta, Mark Vicuña, A. A. D. Savio, Alejandro Palpan, Erika Valle, F. Quiroz","doi":"10.24928/2022/0210","DOIUrl":"https://doi.org/10.24928/2022/0210","url":null,"abstract":"In construction projects, there may be rework and delays associated with construction processes with a low level of industrialization, resulting from the lack of constructability of the designs. To promote industrialization and improve the project's constructability, we implemented the Virtual Design & Construction (VDC) methodology, combined with a system of prefabricated reinforcement cages (PRC) elements in constructing an 870-meter span bridge located in Lima, Peru. The objective was to reduce structural rebars' assembly times, replace the traditional on-site processes of cutting, bending, and assembling steel with an industrial process based on systems of PRC steel elements. As a result, the assembly times of the structural item were reduced by 31%, thanks to the use of PRC elements. In addition, due to the VDC methodology, a 100% buildable design of the PRC elements was achieved. optimization tools to solve complex challenges in construction projects. The most discussed benefits of industrialized construction are cost reductions, productivity improvement, and the reduction and optimization of construction times.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124362214","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"The Dual Nature of Complexity in Construction Management–Call for a Renewed Debate","authors":"B. T. Kalsaas, T. Bølviken, John Skaar","doi":"10.24928/2022/0160","DOIUrl":"https://doi.org/10.24928/2022/0160","url":null,"abstract":"The paper is conceptual, with the aim of raising a new debate on complexity and value creation within IGLC. The topic of complexity in construction projects was first raised in the Nineties before it in the early 2000s was introduced on the Lean Construction and IGLC agenda. When facing a complex problem, there are two possible strategies to pursue with reference to the Cynefin framework for complexity. The first is to transform and move the problem into the complicated or even simple domain, thereby making it manageable. The second is to handle the problem within the complex domain. The dominant approach within both Project Management and Lean is the first, namely, to emphasize efficiency, flow, standardization, best practice, planning, reliability, and control. The paper challenges this lop-sidedness by pointing out its potential reductionism and argues that we should also appreciate, exploit, and take advantage of complexity instead of just combatting it. Value creation is reliant upon both strategies and is therefore not a question of either or, but of balance and trade-offs based on an inherent dualism.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"35 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114975061","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}