How a Takt Plan Can Fail: Applying Failure Modes and Effects Analysis in Takt Control 塔架计划如何失效:在塔架控制中应用失效模式和影响分析
Joonas Lehtovaara, I. Tommelein, O. Seppänen
{"title":"How a Takt Plan Can Fail: Applying Failure Modes and Effects Analysis in Takt Control","authors":"Joonas Lehtovaara, I. Tommelein, O. Seppänen","doi":"10.24928/2022/0182","DOIUrl":"https://doi.org/10.24928/2022/0182","url":null,"abstract":"Construction projects need adequate planning to set a structure and direction for production, but simultaneously call for effective control to maintain the direction when something unexpected happens. Effective control is of utmost importance for takt production, which is especially vulnerable when disruptions occur. While previous takt production research has primarily focused on how to form a good takt plan, little attention has been given to how to control and continuously improve takt production systems effectively. Addressing the gap, this study inspects takt control through the lenses of failure modes and effects analysis (FMEA). First, we argue that takt control can be perceived through three different failure categories: failures within wagons, failures in handoffs, and failures in takt trains. We discuss the peculiarities of takt control through these categories and provide examples of failures with their respective failure mode(s) and possible control action(s). Second, we construct an FMEA-based framework for effective takt control that shows how to recover from failures and avoid them altogether. Future research may consider validating the failure categories and the framework through case studies or simulations, and examining their applicability in supporting digital takt production.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124833954","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Collaborative Method for Training and Implementing the Line of Balance 平衡线训练与实施的协同方法
Fernando C Pereira, Thiago Farias, Marcus C. T. Fireman, Bernardo Etges, L. Lopes
{"title":"Collaborative Method for Training and Implementing the Line of Balance","authors":"Fernando C Pereira, Thiago Farias, Marcus C. T. Fireman, Bernardo Etges, L. Lopes","doi":"10.24928/2022/0128","DOIUrl":"https://doi.org/10.24928/2022/0128","url":null,"abstract":"The Line of Balance (LOB) is a planning technique that has been used for more than 30 years in construction. However, what is rarely discussed is how the LOB should be applied in projects already in progress. This research was developed in the Design Science Research (DSR) format and sought to analyze how LOB can bring about significant changes in the management of collaboration, planning and production. This paper puts forward a collaborative method of training on LOB in projects that are already in progress for which it draws on a two case studies on multifamily residential building. The benefits of LOB for those involved in the workshop were collected by gathering multiple pieces of evidence and analyzing the correlations. In the participants' perception, there are three main benefits concerning to adopting LOB: (i) understanding the sequencing of activities and how to achieve the uninterrupted flow of teams; (ii) assessing the risk of mobilization and remobilization; (iii) assessing milestone dates and constraints. Moreover, participants´ perception, the training had a excellent evaluation, and it contributed to increasing their collaboration and engagement in relation to the planning of the project.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133512572","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Projects Are Becoming ‘Lean’, but Not Organisations 项目正在变得“精益”,但组织不是
Paramjit Singh Lota, Vijayashree Tm, Bhargav Dave
{"title":"Projects Are Becoming ‘Lean’, but Not Organisations","authors":"Paramjit Singh Lota, Vijayashree Tm, Bhargav Dave","doi":"10.24928/2022/0177","DOIUrl":"https://doi.org/10.24928/2022/0177","url":null,"abstract":"There is significant evidence of successful lean implementation at the project level. However, there is limited evidence of lean percolating through organisations in both literature, as well as industry. While the critical aspects of strategic adoption of lean to overcome organisational resistance have been clearly highlighted, the implementation is in most cases limited to select projects and not all projects across an organisation’s portfolio. Despite proven benefits on projects within their own portfolio and the knowledge and skills for successfully implementing lean, organisations still fail to change their approach towards continuous improvement and driving efficiency as a whole. The paper here focuses on the need for a revised approach towards the adoption and sustenance of lean within companies at a business level by highlighting the importance of culture across the company’s portfolio. The authors reflect on their experience of working with client and contractor organisations across multiple projects to review the difference in the maturity and implementation of lean. Following this, the authors corroborate their findings from discussion with a major public sector body and its supply chain on their lean journey over the last decade, to shed light on the approach needed today for successful lean implementation for organisation-wide sustenance.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115389782","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Digitalizing Collaborative Planning in Design – a Case Study 数字化设计中的协同规划——一个案例研究
C. Niranjan, Vegard Knotten, O. Lædre
{"title":"Digitalizing Collaborative Planning in Design – a Case Study","authors":"C. Niranjan, Vegard Knotten, O. Lædre","doi":"10.24928/2022/0218","DOIUrl":"https://doi.org/10.24928/2022/0218","url":null,"abstract":"Collaborative Planning in Design (CPD) has been used in Norway by the contractor Veidekke since 2009. One of the main principles, collaboration, has previously taken place through co-location of the various actors that take part in the design phase. The COVID-19 pandemic placed restrictions such as social distancing, which led to the digitalization of certain elements in CPD. This paper, based on a construction case in Norway, looks at the effects of the digitalization of CPD. This is done using three research questions: How is digitalized CPD achieved, what strengths and weaknesses arise when CPD is digitalized, and how can the digitalization of CPD improve? The research was done through a literature study and qualitative interviews of eight design participants from the research case. Findings show that the digital start-up session should not be used further, as it has negative ripple effects later in design in the form of less collaboration. Fully digital ICE sessions are effective and worth continuing in the future but are dependent on what type of work is scheduled. Phase scheduling should try to use physical post-it notes during a physical meeting, and later convert the schedule to a digital format.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"62 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116592293","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Addressing Waste During the Design Phase: A Matrix Model for the Interactions Between Robotic Systems and Lean Principles 在设计阶段处理浪费:机器人系统与精益原则相互作用的矩阵模型
Jennifer Alejandra Cardenas Castaneda, Vedasree Mudireddy, P. Martinez, Rafiq Ahmad
{"title":"Addressing Waste During the Design Phase: A Matrix Model for the Interactions Between Robotic Systems and Lean Principles","authors":"Jennifer Alejandra Cardenas Castaneda, Vedasree Mudireddy, P. Martinez, Rafiq Ahmad","doi":"10.24928/2022/0211","DOIUrl":"https://doi.org/10.24928/2022/0211","url":null,"abstract":"This paper aims to provide a visual model with design parameters that are specific to manufacturing to reduce waste in the design stage of a construction project. More construction companies are interested in reducing waste and increasing efficiency. However, one of the main barriers that prevent the construction industry from adopting more technological solutions for its projects is not being clear about the direct benefits that would be obtained. This paper proposes using design parameters applied in a user-friendly visual model to choose the benefit to obtain for designing a construction project. These benefits are displayed as key performance indicator (KPI) options for the construction project. An analysis was carried out in a matrix to obtain the most relevant design parameters for a robotic cell in offsite construction from a manufacturing (not architectural or visual/aesthetic) point of view. Additionally, the visual model is designed using a data visualization structure. The limit of the investigation involves not having the visual tool validated in a case of a real construction company. Additionally, the visual tool is only a guide that is not quantified.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"136 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116377589","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Effects of Daily Management on Design Reliability 日常管理对设计可靠性的影响
Eelon Lappalainen, P. Uusitalo, Hisham Abou-Ibrahim, O. Seppänen, Aku Hänninen, Kristian Söderström.
{"title":"Effects of Daily Management on Design Reliability","authors":"Eelon Lappalainen, P. Uusitalo, Hisham Abou-Ibrahim, O. Seppänen, Aku Hänninen, Kristian Söderström.","doi":"10.24928/2022/0105","DOIUrl":"https://doi.org/10.24928/2022/0105","url":null,"abstract":"Building Design Management (DM) is challenging due to the fragmentation of project partners, the iterative nature of design and the tradition of informal management of designers. Therefore, many contractors do not trust the promises of designers and protect the construction schedule with schedule buffers that increase project lead times. To act upon this situation, several researchers have suggested using the Last Planner™ System (LPS) as a method for DM. Using two case studies, we present how the use of the LPS method as a tool for Daily Management (DAM) increases the reliability of the design and how, correspondingly, not using it can affect design reliability. So far, very little attention has been paid to the role of DAM in DM, and this short article seeks to provide new insights into this research gap for both researchers in the field and DM professionals. These early and exploratory results, despite the limited number of cases, can be utilised in further research as well as in practical project management, especially when the reduction of schedule buffers between construction and design is targeted.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114652422","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Putting the Collaborative Style of a Successful Football Team in a Lean Construction Context 将成功足球队的协作风格置于精益建设背景下
T. O. Malvik
{"title":"Putting the Collaborative Style of a Successful Football Team in a Lean Construction Context","authors":"T. O. Malvik","doi":"10.24928/2022/0131","DOIUrl":"https://doi.org/10.24928/2022/0131","url":null,"abstract":"The Norwegian football club Rosenborg BK (RBK) was a well-recognized force in European club football during its heyday in the 1990s. Led by the legendary coach Nils Arne Eggen, they regularly shocked Europe’s top teams with great results after implementing a successful philosophy based on collaboration. The importance of collaboration is well-emphasized in Lean Construction (LC) theory, but more discussion about creating a willingness and culture for collaboration seems to be lacking. Therefore, this conceptual paper suggests broadening the existing theory by presenting Nils Arne Eggen’s “Best Foot theory” principles through a new theoretical lens. The collaborative “Best Foot theory” is seen in an LC context and discussed with the “Five Big Ideas” presented by Lean Project Consulting, Inc. as the starting point. The “Best Foot theory” expands current theory by giving successful practical examples to create a culture for the practitioners in a performance group to want to collaborate.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121695351","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Devising and Implementing Process Models Within Infrastructure Engineering Design 在基础设施工程设计中设计和实施过程模型
B. Pedó, Quynh Anh Thi Nguyen, L. Koskela, A. Tezel, Elena Vrabie, Andrew Whitelock-Wainwright, Doug Potter, S. Robinson, P. Tzortzopoulos
{"title":"Devising and Implementing Process Models Within Infrastructure Engineering Design","authors":"B. Pedó, Quynh Anh Thi Nguyen, L. Koskela, A. Tezel, Elena Vrabie, Andrew Whitelock-Wainwright, Doug Potter, S. Robinson, P. Tzortzopoulos","doi":"10.24928/2022/0155","DOIUrl":"https://doi.org/10.24928/2022/0155","url":null,"abstract":"A plethora of process models have been developed over the years with the aim to improve the performance of design and construction processes. However, effective adoption of process models is still limited; lack of guidance on which model type would be applicable in the given contexts, and an excessive focus on the design of the process models themselves instead of their implementation may be some of the reasons for this. This research investigates how process models should be used within infrastructure engineering design, considering also how different methods suit different purposes. Findings from an ongoing research project in the UK are presented, following case study as its research strategy. This paper reviews the use of process models and clarifies their relationships by describing the adopted models and comparing them with the models explored in the literature, increasing the understanding of process models within infrastructure engineering design. Benefits, limitations and challenges are also discussed, supporting future applications.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131144759","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Role of Lean and VDC in Reducing Physical and Operational Waste and Environmental Impact 精益和VDC在减少物理和操作浪费和环境影响方面的作用
M. Maraqa, R. Sacks, S. Spatari
{"title":"Role of Lean and VDC in Reducing Physical and Operational Waste and Environmental Impact","authors":"M. Maraqa, R. Sacks, S. Spatari","doi":"10.24928/2022/0104","DOIUrl":"https://doi.org/10.24928/2022/0104","url":null,"abstract":"Lean construction focuses on eliminating process and operational wastes. The reduction of waste improves environmental performance by reducing GHG emissions. This research quantified the impacts of lean construction and VDC in reducing physical and operational wastes related to partition walls. The researchers observed worker activities at construction sites and compared them with observations from past projects. The activities were classified into value-adding and non-value-adding activities. The researchers observed the construction of different block types (gypsum, autoclaved aerated concrete, and concrete blocks) to estimate the operational wastes related to the construction method. The results showed that lean and VDC improved the value-adding activities using gypsum block to 68.4% compared to 25.8% in a traditionally managed project using concrete block, an improvement of 167%. Moreover, the embodied GHG emissions in the lean-VDC project per partition area are 12 kg CO 2 e m -2 compared to 58.4 kg CO 2 e m -2 in the traditionally managed project. The reduction in GHG emissions is due to reducing waste in the lean-VDC project and using more sustainable materials.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130937519","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Preparing Construction Employers for the Gen-Z Workforce: A Case Study 为建筑雇主准备z世代劳动力:一个案例研究
M. B. Hatoum, Ashtarout Ammar, H. Nassereddine, G. Dadi
{"title":"Preparing Construction Employers for the Gen-Z Workforce: A Case Study","authors":"M. B. Hatoum, Ashtarout Ammar, H. Nassereddine, G. Dadi","doi":"10.24928/2022/0193","DOIUrl":"https://doi.org/10.24928/2022/0193","url":null,"abstract":"The construction industry has been facing many challenges in the recent years such as labour shortage, aging workforce, productivity decline, and resistance to change. These challenges have pushed both practitioners and academicians to investigate and invest in new transformations that can alter the industry’s traditional business-as-usual model. To successfully address the challenges and create an industry that successfully adapts to and fits in the changing environment, construction employers must prioritize attracting, recruiting, and retaining the new workforce generation. Thus, it becomes important to understand the expectations that construction students are looking for in organizations after graduation. Such studies are still missing, notably on Generation-Z and the construction industry in USA. This paper attempts to fill the gap through providing the first case study on Gen-Z students graduating from of the state of Kentucky and wanting to join the construction industry. A total of 51 students were surveyed and asked to evaluate the importance of 27 factors when accepting a job offer, describe their ideal workplace, and elaborate on whether the COVID-19 pandemic shifted their perspective on the workplace. Findings of this paper can help construction employers in and around the state of Kentucky in preparing for the Generation-Z workforce. Organization provides clear instructions on how to perform tasks Technology Organization is advanced when it comes to the use of technology Wellbeing Organization is aware of mental health and cares for the wellbeing Work-Life Balance work","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124364155","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书