Day 3 Wed, November 17, 2021最新文献

筛选
英文 中文
Automation of Carbonate Rock Thin Section Description Using Cognitive Image Recognition 基于认知图像识别的碳酸盐岩薄片描述自动化
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/208149-ms
H. Shebl, Mohamed Ali Al Tamimi, D. Boyd, H. Nehaid
{"title":"Automation of Carbonate Rock Thin Section Description Using Cognitive Image Recognition","authors":"H. Shebl, Mohamed Ali Al Tamimi, D. Boyd, H. Nehaid","doi":"10.2118/208149-ms","DOIUrl":"https://doi.org/10.2118/208149-ms","url":null,"abstract":"\u0000 Simulation Engineers and Geomodelers rely on reservoir rock geological descriptions to help identify baffles, barriers and pathways to fluid flow critical to accurate reservoir performance predictions. Part of the reservoir modelling process involves Petrographers laboriously describing rock thin sections to interpret the depositional environment and diagenetic processes controlling rock quality, which along with pressure differences, controls fluid movement and influences ultimate oil recovery. Supervised Machine Learning and a rock fabric labelled data set was used to train a neural net to recognize Modified Durham classification reservoir rock thin section images and their individual components (fossils and pore types) plus predict rock quality. The image recognition program's accuracy was tested on an unseen thin section image database.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"8 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"81522718","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
De-Risking Fluid Compartmentalization of the Barik Reservoir in the Khazzan Field, Oman - An Integrated Approach 阿曼Khazzan油田Barik油藏流体分区风险降低的综合方法
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207687-ms
A. Al Anboori, S. Dee, Khalil Al Rashdi, H. Volk
{"title":"De-Risking Fluid Compartmentalization of the Barik Reservoir in the Khazzan Field, Oman - An Integrated Approach","authors":"A. Al Anboori, S. Dee, Khalil Al Rashdi, H. Volk","doi":"10.2118/207687-ms","DOIUrl":"https://doi.org/10.2118/207687-ms","url":null,"abstract":"\u0000 The degree of fluid compartmentalization has direct implications on the development costs of oil and gas reservoirs, since it may negatively impact gas water contacts (GWC) and fluid condensate gas ratios (CGR). In this case study on the Barik Formation in the giant Khazzan gas field in Block 61 in Oman we demonstrate how integrating independent approaches for assessing potential reservoir compartmentalization can be used to assess compartmentalization risk. The three disciplines that were integrated are structural geology (fault seal analysis, movement and stress stages of faults and fractures, traps geometry over geological time), petroleum systems (fluid chemistry and pressure, charge history) and sedimentology-stratigraphy including diagenesis (sedimentological and diagenetic controls on vertical and lateral facies and reservoir quality variation). Dynamic data from production tests were also analyzed and integrated with the observations above.\u0000 Based on this work, Combined Common Risk Segment (CCRS) maps with a most likely and alternative scenarios for reservoir compartmentalization were constructed. While pressure data carry significant uncertainty due to the tight nature of the deeply buried rocks, it is clear pressures in gas-bearing sections fall onto a single pressure gradient across Block 61, while water pressures indicate variable GWCs. Overall, the GWCs appear to shallow across the field towards the NW, while water pressure appears to increase in that direction. The \"apparent\" gas communication with separate aquifers is difficult to explain conventionally. A range of scenarios for fluid distribution and reservoir connectivity are discussed.\u0000 Fault seal compartmentalization and different trap spill points were found to be the most likely mechanism explaining fluid distribution and likely reservoir compartmentalization. Perched water may be another factor explaining variable GWCs. Hydrodynamic tilting due to the flow of formation water was deemed an unlikely scenario, and the risk of reservoir compartmentalization due to sedimentological and diagenetic flow barriers was deemed to be low.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"14 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82371866","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Eyes on Air 空中之眼
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207455-ms
Sulaiman Saif Shehhi, Mohamed Ahmed Al Maflahi
{"title":"Eyes on Air","authors":"Sulaiman Saif Shehhi, Mohamed Ahmed Al Maflahi","doi":"10.2118/207455-ms","DOIUrl":"https://doi.org/10.2118/207455-ms","url":null,"abstract":"\u0000 We at ADNOC Logistics & Services have identified the need for a Fully Integrated Inspection and Monitoring Solution to meet our operational, safety and security objectives. It also helped us in our journey toward becoming a world-class integrated logistics services provider. We have a mandate to manage complex logistics operations while being flexible in services delivery by adopting the latest technology and leveraging strategic partnerships.\u0000 ADNOC L&S adopted autonomous drone technology from Percepto in most of its critical operations. The artificial Intelligence in the drones automatically detects abnormal changes in working environment as well as unsafe acts and conditions and helps employees be more aware of them especially during routine activities. Finally, it helps management take immediate action to address unsafe conditions as soon as they occur.\u0000 Visual inspections play a big role today in asset management. In fact, they're considered a best practice for ensuring safer and more productive operations. Being able to conduct visual inspections routinely leads to early detection of issues and damages that might become failures. In this way, visual inspections ultimately help minimize incidents. Yet visual inspections are not limited to preventing and minimizing incidents, but organizations also get value from real time monitoring of procedures such as planned shutdowns of specific assets such as a flare stack inspection.\u0000 During construction, having the ability to monitor work that is being conducted in real time helps minimize the overall downtime. This can translate into saving hundreds of thousands and even millions of dollars.\u0000 Inspections are vital and even crucial for business continuity. Yet, today visual inspection is far from being optimized. The end to end process is not at all efficient. And surprisingly, most companies and most sites still conduct visual inspections manually, not automatically. This type of inspection is labor intensive, takes a lot of time, and can even put employees at risk. Overall, manual inspection is an inefficient process.\u0000 Consider the siloed workflows that comprise the overall inspection. You start with having to fetch the data and collect it. This involves sending people to the site with special equipment. It can also involve climbing up high structures or putting people into potentially dangerous positions. All of this is manual time-consuming work. When this is done, the data needs to be somehow transferred to people who are going to be analyzing it. They need to have a particular type of expertise and experience in managing visual data. Once they go over the data, they need to create or define some insights and share their findings with the relevant stakeholders. Yet again, this is a labor intensive and lengthy process. It's also costly. Fortunately, it does not have to work this way, as there is lots of room for automation. Each of the siloed workflows from autonomous capture visual data manage","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"45 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89528370","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Asset Integrity Management - Implementation Plan During Front End Loading Phases 资产完整性管理-前端加载阶段的实施计划
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207756-ms
G. Ferrario, Salvatore Grimaldi
{"title":"Asset Integrity Management - Implementation Plan During Front End Loading Phases","authors":"G. Ferrario, Salvatore Grimaldi","doi":"10.2118/207756-ms","DOIUrl":"https://doi.org/10.2118/207756-ms","url":null,"abstract":"\u0000 Capitalization of lessons learned on Asset Integrity Management during Front End Loading phases of a green field Project Development, by defining plan for implementation of a diagnostic digital tool for reducing downtime and introduce predictive maintenance during Operation.\u0000 Eni developed a platform of Digital applications for enhanced Operations management by implementing an Integrated Asset Management (IAM) system. Advanced Analytics tool is part of it and is designed for monitoring, foreseeing and preventing production upsets and anomalies; the tool is set up by verification of areas of interest and criticalities, with identification of main equipment data sets and by the implementation and validation of predictive models. Starting from historical data, data scientists supported by experts develop algorithms capable of finding interdependencies between a set of input variables and an output variable (phenomenon to be predicted/monitored), thus detecting anomalies and criticalities.\u0000 Main areas of benefit are envisaged on Production continuity, capable of predicting problems on static and rotating equipment and giving information on the most impacting variables on the incipient problems. The tool will support technicians to help them preventing failures and out-of-specs events which may cause loss of production or asset integrity issues, with the activation of predictive maintenance and the aim to strive a continuous monitoring and improvement of plant operational performances. An Energy Efficiency predictive model will also be set up, capable of forecasting the future energy performances of the asset through the prediction of the Stationary Combustion of Carbon Dioxide (CO2) emission index (t CO2/kbbl) and providing the list of the main influencing equipment and variables. The plan for implementation of the tool from the Early phases of development help the organization on prioritizing the implementation of Digital tools as part of the execution and realization of the Asset to be delivered to the Operational personnel, by easing the transition and avoiding subsequent retrofitting carrying brownfield works and additional costs.\u0000 The implementation of Advanced Analytics tool has been embedded in a new green field initiative of a Development Project since Front End Loading phases, thus fostering digital implementation and minimizing deployment costs by including those as part of the Investment Proposal presented to Joint Venture Partners and Authorities.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"52 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89208158","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Mature Field Revitalization: Extending Late Life of Mature Gas Condensate Wells by Modelling Complex Multilateral Wellbore Flow Dynamics and Validating Results With a Field Pilot 成熟油田振兴:通过模拟复杂的多边井筒流动动力学并通过现场试验验证结果,延长成熟凝析气井的后期寿命
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207501-ms
H. Saradva, Siddharth Jain, Christna Golaco, A. Guillen, K. Thakur
{"title":"Mature Field Revitalization: Extending Late Life of Mature Gas Condensate Wells by Modelling Complex Multilateral Wellbore Flow Dynamics and Validating Results With a Field Pilot","authors":"H. Saradva, Siddharth Jain, Christna Golaco, A. Guillen, K. Thakur","doi":"10.2118/207501-ms","DOIUrl":"https://doi.org/10.2118/207501-ms","url":null,"abstract":"\u0000 Sharjah National Oil Corporation (SNOC) operates 4 onshore fields the largest of which has been in production since the 1980's. The majority of wells in the biggest field have a complex network of multilaterals drilled using an underbalanced coiled tubing technique for production enhancement in early 2000s. The scope of this project was to maximize the productivity from these wells in the late life by modelling the dynamic flow behaviour in a simulator and putting that theory to the test by recompleting the wells.\u0000 A comprehensive multilateral wellbore flow study was undertaken using dynamic multiphase flow simulator to predict the expected improvement in well deliverability of these mature wells, each having 4-6 laterals (Saradva et al. 2019). The well laterals have openhole fishbone completions with one parent lateral having subsequent numerous sub-laterals reaching further into the reservoir with each lateral between 500-2000ft drilled to maximize the intersection with fractures. Complexity in simulation further increased due to complex geology, compositional simulation, condensate banking and liquid loading with the reservoir pressure less than 10% of original.\u0000 The theory that increasing wellbore diameter by removing the tubing reduces frictional pressure loss was put to test on 2 pilot wells in the 2020-21 workover campaign. The results obtained from the simulator and the actual production increment in the well aligned within 10% accuracy. A production gain of 20-30% was observed on both the wells and results are part of a dynamic simulation predicting well performance over their remaining life. Given the uncertainties in the current PVT, lateral contribution and the fluid production ratios, a broad range sensitivity was performed to ensure a wide range of applicability of the study.\u0000 This instils confidence in the multiphase transient simulator for subsurface modelling and the workflow will now be used to expand the applicability to other well candidates on a field level. This will result in the opportunity to maximize the production and net revenues from these gas wells by reducing the impact of liquid loading. This paper discusses the detailed comparison of the actual well behaviour with the simulation outcomes which are counterproductive to the conventional gas well development theory of utilizing velocity strings to reduce liquid loading.\u0000 Two key outcomes from the project are observed, the first is that liquid loading in multilaterals is successfully modelled in a dynamic multiphase transient simulator instead of a typical nodal analysis package, all validated from a field pilot. The second is the alternative to the conventional theory of using smaller tubing sizes to alleviate gas wells liquid loading, that high velocity achieved through wellhead compression would allow higher productivity than a velocity string in low pressure late life gas condensate wells.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"46 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"88636944","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Geoscience Language Processing for Exploration 面向勘探的地球科学语言处理
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207766-ms
H. Denli, HassanJaved Chughtai, Brian Hughes, Robert Gistri, Peng Xu
{"title":"Geoscience Language Processing for Exploration","authors":"H. Denli, HassanJaved Chughtai, Brian Hughes, Robert Gistri, Peng Xu","doi":"10.2118/207766-ms","DOIUrl":"https://doi.org/10.2118/207766-ms","url":null,"abstract":"\u0000 Deep learning has recently been providing step-change capabilities, particularly using transformer models, for natural language processing applications such as question answering, query-based summarization, and language translation for general-purpose context. We have developed a geoscience-specific language processing solution using such models to enable geoscientists to perform rapid, fully-quantitative and automated analysis of large corpuses of data and gain insights.\u0000 One of the key transformer-based model is BERT (Bidirectional Encoder Representations from Transformers). It is trained with a large amount of general-purpose text (e.g., Common Crawl). Use of such a model for geoscience applications can face a number of challenges. One is due to the insignificant presence of geoscience-specific vocabulary in general-purpose context (e.g. daily language) and the other one is due to the geoscience jargon (domain-specific meaning of words). For example, salt is more likely to be associated with table salt within a daily language but it is used as a subsurface entity within geosciences.\u0000 To elevate such challenges, we retrained a pre-trained BERT model with our 20M internal geoscientific records. We will refer the retrained model as GeoBERT. We fine-tuned the GeoBERT model for a number of tasks including geoscience question answering and query-based summarization.\u0000 BERT models are very large in size. For example, BERT-Large has 340M trained parameters. Geoscience language processing with these models, including GeoBERT, could result in a substantial latency when all database is processed at every call of the model. To address this challenge, we developed a retriever-reader engine consisting of an embedding-based similarity search as a context retrieval step, which helps the solution to narrow the context for a given query before processing the context with GeoBERT.\u0000 We built a solution integrating context-retrieval and GeoBERT models. Benchmarks show that it is effective to help geologists to identify answers and context for given questions. The prototype will also produce a summary to different granularity for a given set of documents. We have also demonstrated that domain-specific GeoBERT outperforms general-purpose BERT for geoscience applications.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"9 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77237528","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Big Data IAOM Project Management and Workflow Automation in a Giant Gas Field Digitization Drive 大型气田数字化驱动中的大数据IAOM项目管理和工作流程自动化
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207737-ms
A. Alsaeedi, M. Elabrashy, M. Alzeyoudi, M. Albadi, Sandeep Soni, Jose Isambertt, Deepak Tripathi, Ankit Shah
{"title":"Big Data IAOM Project Management and Workflow Automation in a Giant Gas Field Digitization Drive","authors":"A. Alsaeedi, M. Elabrashy, M. Alzeyoudi, M. Albadi, Sandeep Soni, Jose Isambertt, Deepak Tripathi, Ankit Shah","doi":"10.2118/207737-ms","DOIUrl":"https://doi.org/10.2118/207737-ms","url":null,"abstract":"\u0000 Integrated asset modeling, application of big data, and automation are among the top emerging trends in the oil and gas industry. The value associated with such implementation projects is very closely linked with the efficient use of the project management approach and a robust strategy to handle the technological challenges. This paper puts light on such initiatives implemented in a giant gas field.\u0000 In this giant gas condensate field, a vast amount of data is generated and monitored on a daily basis. The frequent need to deliver the dynamic production target was driving this project implementation so that a value-driven system can be established while achieving the business KPIs. A phased approach was used to target multiple requirements into business deliverables where the early offline phases provided a robust base for full online integration. This project followed the agile approach focusing on getting insights from multiple stakeholders and domain experts and developing a lesson-learnt repository in all the project phases.\u0000 The online integration solution is a critical differentiator in the workforce and process efficiency improvement. The multiple technical solution workflows helped in reducing manual efforts and streamlining the methodology in a standardized fashion. In addition, the standard project management practices, such as initializing the phases in a planned manner, followed by an interactive execution, monitoring, and controlling stages, ensured delivering project outcomes in an efficient way. This implementation also established a robust collaborative team effort to identify various different roles and responsibilities for stakeholders. This helped in the end phase when the project sustainability was essential. A strong team base maintained and updated the integrated system while delivering daily well and facility surveillance objectives and KPIs from users ranging from planning, engineering, operation, and management team. A special focus on IT team involvement throughout the project phase led to a successful data integration and diagnostic, as the core of the solution was a data-driven analytical framework integrated with multiple corporate and real-time data sources. In addition, this solution was equipped with various one-of-its-kind solution features such as business intelligence, advanced surveillance, dynamic-reservoir integration, manage-by-exception workflows, intelligence alerts, along with a strong digital framework and data architecture.\u0000 The unique hybrid and agile project management approach focusing on delivering emerging trends and technologies to end-users in the most efficient way paved the way for achieving asset digitalization and standardization goals.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"44 1 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"90909787","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Improving Operational Efficiency Using Automated Time Analysis for Multi-Well Pad Fracturing 利用自动化时间分析提高多井台压裂作业效率
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207318-ms
F. Siddiqui, M. Kamyab, M. Lowder
{"title":"Improving Operational Efficiency Using Automated Time Analysis for Multi-Well Pad Fracturing","authors":"F. Siddiqui, M. Kamyab, M. Lowder","doi":"10.2118/207318-ms","DOIUrl":"https://doi.org/10.2118/207318-ms","url":null,"abstract":"\u0000 The economic success of unconventional reservoirs relies on driving down completion costs. Manually measuring the operational efficiency for a multi-well pad can be error-prone and time-prohibitive. Complete automation of this analysis can provide an effortless real-time insight to completion engineers. This study presents a real-time method for measuring the time spent on each completion activity, thereby enabling the identification and potential cost reduction avenues.\u0000 Two data acquisition boxes are utilized at the completion site to transmit both the fracturing and wireline data in real-time to a cloud server. A data processing algorithm is described to determine the start and end of these two operations for each stage of every well on the pad. The described method then determines other activity intervals (fracturing swap-over, wireline swap-over, and waiting on offset wells) based on the relationship between the fracturing and wireline segments of all the wells. The processed data results can be viewed in real-time on mobile or computers connected to the cloud.\u0000 Viewing the full operational time log in real-time helps engineers analyze the whole operation and determine key performance indicators (KPIs) such as the number of fractured stages per day, pumping percentage, average fracture, and wireline swap-over durations for a given time period. In addition, the performance of the day and night crews can be evaluated.\u0000 By plotting a comparison of KPIs for wireline and fracturing times, trends can be readily identified for improving operational efficiency. Practices from best-performing stages can be adopted to reduce non-pumping times. This helps operators save time and money to optimize for more efficient operations. As the number of wells increases, the complexity of manual generation of time-log increases. The presented method can handle multi-well fracturing and wireline operations without such difficulty and in real-time.\u0000 A case study is also presented, where an operator in the US Permian basin used this method in real-time to view and optimize zipper operations. Analysis indicated that the time spent on the swap over activities could be reduced. This operator set a realistic goal of reducing 10 minutes per swap-over interval. Within one pad, the goal was reached utilizing this method, resulting in reducing 15 hours from the total pad time.\u0000 The presented method provides an automated overview of fracturing operations. Based on the analysis, timely decisions can be made to reduce operational costs. Moreover, because this method is automated, it is not limited to single well operations but can handle multi-well pad completion designs that are commonplace in unconventionals.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"23 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"74013388","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Minimum Structure for Well Appraisal in Marginal Fields at 35m Water Depth without Jacket & Mudline Suspension System 35米水深边缘油田评价井的最小结构,不含夹套和泥线悬挂系统
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207262-ms
P. Chatterjee
{"title":"Minimum Structure for Well Appraisal in Marginal Fields at 35m Water Depth without Jacket & Mudline Suspension System","authors":"P. Chatterjee","doi":"10.2118/207262-ms","DOIUrl":"https://doi.org/10.2118/207262-ms","url":null,"abstract":"\u0000 This paper proposes a minimum structure for drilling two appraisal wells. Conductors will be driven into seabed by a crane vessel or drilling-rig crane through a pre-installed lightweight guide-frame placed on seabed. After driving the conductors to required depth, the frame is raised and joined to the conductors at appropriate elevation by bolted and grouted connections. Six tie members connected between the frame and seabed by specially-designed small mat foundations will ensure stability of the structure against environmental loads. A small deck will be installed on the top of conductors to provide space for essential equipment required for prolonged well testing after departure of drilling rig. The platform will be accessed by small boats through a boat landing and ladder. In case of positive drilling outcome, a riser and flexible pipeline will be added to connect with the nearest subsea tie-in point. A detailed structural design of the minimum facility is performed to withstand omnidirectional environmental loads due to 10.0m high wave along with associated wind and current loads. Susceptibility of the structure against dynamic effect of wave loads is also investigated. Demonstration of structural adequacy against wave-induced fatigue loads and reserve strength against extreme environmental loads show the robustness of the minimum structure to perform against design environmental loads.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"28 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73551626","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Modeling a Novel Approach to Delay the Water Breakthrough in Gas Cap Wells Using Smart Completions: Case Study Onshore Abu Dhabi Field 模拟一种利用智能完井延迟气顶井见水的新方法:以阿布扎比陆上油田为例
Day 3 Wed, November 17, 2021 Pub Date : 2021-12-09 DOI: 10.2118/207862-ms
Aditya Ojha, M. A. Al Hosani, A. A. Al Bairaq, S. Mengal, I. Mohamed, A. Abdullayev, Allen Roopal
{"title":"Modeling a Novel Approach to Delay the Water Breakthrough in Gas Cap Wells Using Smart Completions: Case Study Onshore Abu Dhabi Field","authors":"Aditya Ojha, M. A. Al Hosani, A. A. Al Bairaq, S. Mengal, I. Mohamed, A. Abdullayev, Allen Roopal","doi":"10.2118/207862-ms","DOIUrl":"https://doi.org/10.2118/207862-ms","url":null,"abstract":"\u0000 This paper presents modeling a novel approach to determine the impact of implementing smart completions on water injectors located near the periphery of the gas cap and on gas producing wells situated in the gas cap of a giant Middle East onshore field. The objective of the study is to thoroughly investigate different smart completion designs which can effectively delay water breakthrough on the gas cap wells.\u0000 The study investigates the impact of adding smart well completion designs like ICD and AICD valves in delaying water breakthrough. The first phase involves adding smart completions to only water injectors. Sensitivity runs on several downhole completion design scenarios are conducted using a commercial near wellbore simulator and the optimal downhole completion design is implemented on a dynamic model and its impact is examined using a reservoir simulator. In the second phase, this approach is applied only for gas producers, and in the third phase the smart completions are simultaneously applied to both water injectors and gas producers.\u0000 The detailed study has revealed that the uncertainties and time involved in selecting optimal ICD design and placements could be reduced considerably by using an optimized workflow. The workflow uses a carefully designed process of using the outcomes from near wellbore simulators and incorporating the results in the actual full field dynamic models to assess the field level impacts.\u0000 When compared to the bare foot design, ICD and AICD valves showed better performance in delaying water breakthrough from the gas wells.\u0000 This paper provides a detailed study on the impact of different smart completions on delaying water breakthrough in gas production wells. The study also investigates how a uniform injection or production profile can be produced using different smart completions. Uniform injection and production profiles limit water fingering in the reservoir, and thereby delay water breakthrough caused by the flow of water through high permeability channels.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"4 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72982229","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信