Sustainable Civil Building Management and Engineering Journal最新文献

筛选
英文 中文
Empirical Analysis of Partially Penetrated Prefabricated Vertical Drains (PVD) on Acceleration Consolidation of Soft Soil 部分渗透预制垂直排水沟 (PVD) 对软土加速固结的实证分析
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-07-06 DOI: 10.47134/scbmej.v1i4.2893
Muhammad Rayyan Alfirdaus
{"title":"Empirical Analysis of Partially Penetrated Prefabricated Vertical Drains (PVD) on Acceleration Consolidation of Soft Soil","authors":"Muhammad Rayyan Alfirdaus","doi":"10.47134/scbmej.v1i4.2893","DOIUrl":"https://doi.org/10.47134/scbmej.v1i4.2893","url":null,"abstract":"The soft soil problem is one of the problems that must be resolved before construction begins. One way to solve this problem is to use prefabricated vertical drains (PVD), which works by cutting the drainage path into shorter lengths, thereby speeding up the consolidation rate. In this research, an empirical analysis of the use of PVD will be calculated to determine the effective depth of PVD. The analysis will be calculated using Hansbo's theory and Terzaghi's one-dimensional consolidation. Depth variations are considered from 100%, 90%, 80%, 70%, 60%, and 50% of the compressible soil depth. The analysis results show that in 180 days a consolidation degree of 90% has been achieved at variations of 90% and 100% of the depth of the compressible soil. Meanwhile, within 180 days, primary consolidation residue values ​​<0.3 m occurred with variations of 70%-100%. It can be said that the depth of PVD installation can be reduced by 70% -90% of the depth of compressible soil.","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":" 8","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141672293","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Numerical Modeling of Soil Embankment on Soft Soil Using Variation of Expanded Polystyrene (EPS) Geofoam Material Type 利用发泡聚苯乙烯 (EPS) 土工泡沫材料类型的变化对软土上的土堤进行数值建模
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-07-05 DOI: 10.47134/scbmej.v1i4.2871
Mohammad Sahrul R.
{"title":"Numerical Modeling of Soil Embankment on Soft Soil Using Variation of Expanded Polystyrene (EPS) Geofoam Material Type","authors":"Mohammad Sahrul R.","doi":"10.47134/scbmej.v1i4.2871","DOIUrl":"https://doi.org/10.47134/scbmej.v1i4.2871","url":null,"abstract":"Subgrade is the layer of soil that lies beneath the pavement. The subgrade plays an important role in supporting and spreading the load from the pavement to the underlying soil. Terzaghi, et al. (1967) state that soft soils can pose serious challenges in geotechnical engineering, due to their tendency to experience large settlement under structural loads. Handling soft soils often requires specialized methods such as preloading, vacuum consolidation, or the use of geosynthetics to improve stability. One of the geosynthetics used in handling soft soil is Expanded Polystyrene (EPS) Geofoam. This research aims to determine the settlement behavior of soil embankment on soft soil reinforced with EPS geofoam. The settlement behavior was obtained with the help of GeoStudio software. EPS geofoam has been used since 1960, this material weighs about 1% of the soil weight and less than 10% of the weight of other embankment materials. As a lightweight embankment material, EPS geofoam can reduce the load imposed on the embankment structure. Modeling of soil embankment on soft soil using various types of EPS geofoam material in this research uses GeoStudio software. The modeling analysis uses SIGMA/W in GeoStudio.  Numerical modeling of variations in the type of EPS geofoam material in the embankment on soft soil gives the results of a decrease that is not too significant. The settlement results from modeling with GeoStudio are 0.33240 m for EPS 22, 0.33264 m for EPS 29, 0.33323 mm for EPS 39. EPS 39 provides 0.25% higher settlement than EPS 22.","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":" 10","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141676388","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Kajian Maturitas Beton untuk Memprediksi Nilai Kuat Tekan dengan Variasi Kadar Retarder 研究混凝土成熟度以预测不同缓凝剂水平下的抗压强度值
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-07-05 DOI: 10.47134/scbmej.v1i4.2866
Adib Noor Ahdi Agustiantoro, Wibowo Wibowo, Endah Safitri
{"title":"Kajian Maturitas Beton untuk Memprediksi Nilai Kuat Tekan dengan Variasi Kadar Retarder","authors":"Adib Noor Ahdi Agustiantoro, Wibowo Wibowo, Endah Safitri","doi":"10.47134/scbmej.v1i4.2866","DOIUrl":"https://doi.org/10.47134/scbmej.v1i4.2866","url":null,"abstract":"Ketepatan waktu pada proyek menjadi hal yang sangat krusial karena akan berpengaruh pada keberlangsungan proyek. Salah satu metode untuk memprediksi kekuatan beton di tempat secara langsung adalah metode maturitas beton. Persamaan paling efisien untuk perhitungan kuat tekan beton dengan metode maturitas beton (maturity method) adalah persamaan logaritmis. Metode penelitian dilakukan dengan cara uji eksperimental untuk menentukan indeks maturity lalu diolah dengan persamaan logaritmis untuk memprediksi nilai kuat tekan beton. Sampel beton dengan variasi campuran retarder sebanyak 0%; 0,3%; 0,4%; serta 0,5% dari berat binder. Sampel yang digunakan berbentuk silinder dengan dimensi tinggi 30 cm dan dengan diameter 15 cm. Kemudian kuat tekan beton metode maturity test dibandingkan dengan pengujian compression test machine. Hasil penelitian menunjukkan bahwa metode prediksi dengan persamaan logaritmis dalam kurva hubungan kuat tekan dan maturity pada beton dengan variasi kadar retarder menghasilkan nilai koefisien determinasi (R2) diatas 0,9500. Dapat disimpulkan bahwa persamaan logaritmis dapat digunakan dengan baik untuk memprediksi kuat tekan beton menggunakan metode non destructive. Selisih kuat tekan beton dengan metode destructive test dan non destructive test paling besar adalah 4,29%","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":" 15","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141676800","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Kajian Maturitas Beton untuk Memprediksi Nilai Kuat Tekan dengan Variasi Kadar Superplasticizer 研究混凝土成熟度以预测不同超塑化剂含量下的抗压强度值
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-07-04 DOI: 10.47134/scbmej.v1i4.2843
A. Saraswati, Wibowo Wibowo, Endah Safitri
{"title":"Kajian Maturitas Beton untuk Memprediksi Nilai Kuat Tekan dengan Variasi Kadar Superplasticizer","authors":"A. Saraswati, Wibowo Wibowo, Endah Safitri","doi":"10.47134/scbmej.v1i4.2843","DOIUrl":"https://doi.org/10.47134/scbmej.v1i4.2843","url":null,"abstract":"Salah satu metode untuk memprediksi kekuatan beton di tempat secara langsung adalah metode maturitas beton. Dalam melakukan perhitungan kuat tekan dengan metode maturitas ada beberapa model prediksi yang dapat digunakan, salah satunya yaitu persamaan logaritmis. Penelitian dengan metode eksperimental ini bertujuan untuk menentukan indeks maturity dalam memprediksi nilai kuat tekan pada beton dengan variasi kadar superplasticizer 0%; 1%; 1,5%; dan 2%  dari berat binder dan membandingkan nilai kuat tekan antara metode maturitas dengan metode destructive test. Pengujian menggunakan beton berbentuk silinder ukuran 30 cm x 15 cm dengan sensor suhu dimasukkan sedalam ± 15 cm. Pengukuran suhu dilakukan pada saat beton berumur 1, 3, 7, 14, 21, dan 28 hari dan pengujian kuat tekan pada umur 7, 14, dan 28 hari dengan alat Compression Testing Machine. Hasil penelitian menunjukkan bahwa penggunaan persamaan logaritmis dalam kurva hubungan kuat tekan-maturity pada beton dengan variasi kadar superplasticizer 0%; 1%; 1,5%; dan 2% menghasilkan nilai koefisien determinasi (R2) mendekati 1 dan selisih nilai kuat tekan antara pengujian destructive dan metode maturitas nilainya masih di bawah 4%.","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":" 20","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141677798","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Value Engineering Analysis on Building Structure (Case Study: Java Steam Power Plant 9&10 2x1000 MW Suralaya Project) 建筑结构的价值工程分析(案例研究:爪哇蒸汽发电厂 9&10 2x1000 兆瓦 Suralaya 项目)
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-07-04 DOI: 10.47134/scbmej.v1i3.2835
Reza Andhika Putra, Setiono Setiono, Fajar Sri Handayani
{"title":"Value Engineering Analysis on Building Structure (Case Study: Java Steam Power Plant 9&10 2x1000 MW Suralaya Project)","authors":"Reza Andhika Putra, Setiono Setiono, Fajar Sri Handayani","doi":"10.47134/scbmej.v1i3.2835","DOIUrl":"https://doi.org/10.47134/scbmej.v1i3.2835","url":null,"abstract":"Cost is an important element in the success of a project because problems with project implementation costs can hinder the achievement of the project. Problems in project implementation related to costs can be overcome by carrying out value engineering analysis. The concept of value engineering is a systematic effort to analyze existing problems and aims to achieve the desired functions or types of work with efficient costs and optimal results. The value engineering carried out in the case study analyzed by the author is a change in the implementation of concrete work from conventional methods to precast methods to obtain cost efficiency. The method used is a data collection method and analysis method according to the value engineering analysis stages. The results of the value engineering analysis obtained by the author through creative ideas in the form of changing conventional concrete work to precast concrete are savings in work costs on building structural components in the form of slabs. The cost savings obtained were Rp695,905,059.00 or 2.21%.","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":"55 11","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141837686","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analysis of Quantity Take Off Deviation Using BIM Method (Case Study of Construction of a Satpol PP Building) 利用 BIM 方法分析工程量核算偏差(Satpol PP 大厦施工案例研究)
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-07-02 DOI: 10.47134/scbmej.v1i3.2828
Muhammad Reza Nur Fadlilah, Fajar Sri Handayani, Muji Rifai
{"title":"Analysis of Quantity Take Off Deviation Using BIM Method (Case Study of Construction of a Satpol PP Building)","authors":"Muhammad Reza Nur Fadlilah, Fajar Sri Handayani, Muji Rifai","doi":"10.47134/scbmej.v1i3.2828","DOIUrl":"https://doi.org/10.47134/scbmej.v1i3.2828","url":null,"abstract":"Quantity Take Off (QTO) is in important process in the construction industry that calculates and estimates the amount of material needed to complete a construction project. This process includes detail analysis of design plans and technical specification to identify and calculate quantities. QTO results are used to create cost budgets, create project plans, and plan material procurement. This research explains the Building Information Modeling (BIM) application which uses Autodesk Revit software to calculate Quantity Take Off volume. The aim is to find out the difference between volume calculations using conventional methods and volume calculations using the BIM method and Quantity Take Off volumes in architectural work and structural work. A comparative analysis of conventional methods and the use of Autodesk Revit provide an overview of the efficiency and effectiveness of implementing BIM software in the Bantul Satpol PP Building Construction Project with a focus on structural an architectural work investigation studies. This research uses a case study methodology which includes a quantity survey using Building Information Modeling (BIM) techniques using Autodesk Revit and Microsoft Excel software. This research method includes preparatory steps, data collection techniques, 3D modeling, and data analysis based on volume the use of BIM software and conventional methods. Based on the survey results, the difference in volume calculations for architectural work is 9,68% and for structural work is 9,00%, this shows that volume calculations using the BIM method are smaller than using conventional methods.","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":"38 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-07-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141838292","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Retention Basin for Flood Mitigation (Case Study: Magetan Regency) 用于缓解洪灾的蓄水池(案例研究:马格坦摄政区)
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-06-13 DOI: 10.47134/scbmej.v1i4.2718
Marita Putri Handayani, R. Hadiani, Solichin Solichin
{"title":"Retention Basin for Flood Mitigation (Case Study: Magetan Regency)","authors":"Marita Putri Handayani, R. Hadiani, Solichin Solichin","doi":"10.47134/scbmej.v1i4.2718","DOIUrl":"https://doi.org/10.47134/scbmej.v1i4.2718","url":null,"abstract":"Flooding is a natural event that often occurs in Indonesia. Magetan Regency has several areas drained by various rivers that have the potential to cause flooding problems in the event of high rainfall. Hydrological analysis is needed to determine the various rivers that are potentially unable to accommodate water capacity due to high rainfall, causing flooding problems.  Thus, research aims to assess flood mitigation control based on a 25-year return period flood discharge (Q25) using the HSS Snyder method and HEC-HMS software. The flood inundation area due to river runoff is analysed using HEC-RAS 6.4.1 software using a 25-year return period discharge (Q25). This research uses retention basin as one of the efforts in flood mitigation, reducing the amount of flood inundation that occurs by using embankment planning. Retention basin is a water structure that functions to collect rainwater and water runoff to reduce flooding. Retention basin is one of the important steps in the flood inundation that occurred in Magetan Regency using HEC-RAS 6.4.1 software analysis was 3,75 km2. The largest flood inundation occurred in Kartoharjo District with an area 1,31 km2. The design of the Kartoharjo Retention Basin in Magetan Regency can reduce the flood inundation area by 22% to 2,94 km2.","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":"47 12","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141347195","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Studi Kelayakan Pembangunan Jalan Lawe Sigala Gala-Suka Dame dengan Analisis Sensitivitas 劳-西加拉-加拉-苏卡-达梅公路开发可行性研究及敏感性分析
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-05-19 DOI: 10.47134/scbmej.v1i3.2507
Jetno Harja
{"title":"Studi Kelayakan Pembangunan Jalan Lawe Sigala Gala-Suka Dame dengan Analisis Sensitivitas","authors":"Jetno Harja","doi":"10.47134/scbmej.v1i3.2507","DOIUrl":"https://doi.org/10.47134/scbmej.v1i3.2507","url":null,"abstract":"Analisis sensitivitas adalah sebuah analisis yang dilakukan untuk mengetahui perubahan dalam dasar-dasar perhitungan biaya dan manfaat pada sebuah proyek, yang meliputi kenaikan biaya-biaya, seperti biaya konstruksi, biaya bahan baku, biaya produksi, penurunan produktivitas, mundurnya jadwal pelaksanaan proyek, Analisa Producer Surplus merupakan parameter evaluasi kelayakan proyek, dalam hal ini keuntungan (benefit) yang digunakan adalah semua surplus yang dinikmati oleh produsen barang dan jasa yang dijual dalam daerah pengaruh proyek. Dengan melakukan analisis Producer Surplus maka akibat yang mungkin terjadi dari perubahan-perubahan produksi hasil tanam pada lokasi proyek atau akibat dari pembangunan ruas jalan baru tersebut dapat diketahui. Dalam menganalisis kelayakan ekonomi dilakukan analisa cash flow dari masing-masing kriteria kelayakan ekonomi. Kriteria ekonomi dengan discount rate yang dihitung adalah 10%, 12% dan 15%, Untuk itu perlu dilihat sejauh mana manfaat kelayakan ekonomi, peningkatan produksi akibat pembangunan proyek dan perubahan terhadap parameter BCR, NPV dan EIRR akibat analisis sensitivitas dengan melakukan skenario kondisi awal (normal);  skenario komponen biaya + 10% & komponen manfaat tetap; skenario komponen biaya + 15% & komponen manfaat tetap; skenario komponen biaya + 20% & komponen manfaat tetap; skenario komponen biaya tetap  & komponen manfaat – 10%; skenario komponen biaya tetap  & komponen manfaat – 15%; skenario komponen biaya tetap  & komponen manfaat – 20%; skenario komponen biaya + 10% & komponen manfaat – 10%; skenario komponen biaya + 15% & komponen manfaat – 15%; skenario komponen biaya + 20% & komponen manfaat –20%. pada pembangunan jalan Lawe Sigala Gala – Suka Dame (with project).","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":"119 26","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-05-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"141124328","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Cost Budget Analysis for Equal Distribution of Labour for Multi-Storey Buildings Construction 多层建筑施工中平均分配劳动力的成本预算分析
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-05-12 DOI: 10.47134/scbmej.v1i3.2439
Maharani Putri Dewanty, Nyoman Dita, Pahang Putra, Maharani Putri
{"title":"Cost Budget Analysis for Equal Distribution of Labour for Multi-Storey Buildings Construction","authors":"Maharani Putri Dewanty, Nyoman Dita, Pahang Putra, Maharani Putri","doi":"10.47134/scbmej.v1i3.2439","DOIUrl":"https://doi.org/10.47134/scbmej.v1i3.2439","url":null,"abstract":"Although all resources on a construction project have their respective roles, the availability of labour significantly impacts how far the project moves forward and is completed. According to Kastor and Sirakoulis (2009), calculating the number of workers according to the construction schedule is crucial because, without this consideration, the resulting schedule may not be effective and efficient.  process used for construction project resources to reduce fluctuations (Waluyo & Aditama, 2017). This research compares labour allocation, duration, and labour wage cost budgets under several conditions. These conditions include actual project conditions, planning, and results after levelling using an auto schedule. In project planning, the fluctuations obtained are pretty sharp. After the auto schedule levelling, the manpower no longer experienced overallocation, but fluctuations between weeks were still relatively high. This can happen because the quantity of work and labour in the construction projects under review is not comparable to the effects of project delays. The results obtained from the comparisons analyzed on the X-storey building construction project are that the auto schedule does not change the initial planning duration, which remains at 133 days. There was a disparity of 0.02% in auto schedule planning costs from 1,098,345,000.00. Meanwhile, in actual conditions, the labour cost budget increased by 0.12% from IDR 967,880,000.00 after the auto-schedule levelling process. It can be concluded that before resource levelling is carried out, it is necessary to review project scheduling and accelerate the duration of implementation, specifically if construction projects experience delays and other factors, so as not to cause fluctuations caused by the uneven quantity of work over some time.","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":"104 13","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140987620","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Material Planning Analysis with Material Requirement Planning Method in High-rise Building Projects 高层建筑项目中采用材料需求计划法的材料计划分析
Sustainable Civil Building Management and Engineering Journal Pub Date : 2024-05-12 DOI: 10.47134/scbmej.v1i3.2438
Mawinda Oktrify Awati, Nyoman Dita, Pahang Putra, Mawinda Oktrify
{"title":"Material Planning Analysis with Material Requirement Planning Method in High-rise Building Projects","authors":"Mawinda Oktrify Awati, Nyoman Dita, Pahang Putra, Mawinda Oktrify","doi":"10.47134/scbmej.v1i3.2438","DOIUrl":"https://doi.org/10.47134/scbmej.v1i3.2438","url":null,"abstract":"Planning material supplies well is very important in implementing construction projects to ensure smoothness and efficiency. Smoothness includes thorough planning, including ensuring materials are met as planned, while efficiency aims to reduce time and cost. In this study, material planning will be carried out using the Material Requirement planning (MRP) method, using three different lot measurement techniques, namely Lot for Lot (LFL), Economic Order Quantity (EOQ), and Period Order Quantity (POQ). The MRP method is carried out to accurately calculate the amount of material needed to avoid excessive material inventory levels. After the MRP method, the most optimal number of orders and the total cost required for each lot measurement technique are obtained. The results of this study show that the LFL technique produces the optimum number of orders for gelam wood, plywood, reinforcement, bendrat wire, and ready mix concrete. Meanwhile, for materials such as lubricating oil, meranti wood, randu wood, and nails, it is optimal to order using the POQ technique.","PeriodicalId":519042,"journal":{"name":"Sustainable Civil Building Management and Engineering Journal","volume":"123 43","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140986337","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书