Journal of Rail Transport Planning & Management最新文献

筛选
英文 中文
What fosters shippers’ rail dispreference? Insights from Indian steel-makers with disparate output volumes 是什么助长了托运人对铁路的偏好?产量不同的印度钢铁制造商的启示
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-05-02 DOI: 10.1016/j.jrtpm.2024.100447
J Ajith Kumar , Sayan Mukherjee , Alok Baveja , K. Narayan , Rajiv Misra
{"title":"What fosters shippers’ rail dispreference? Insights from Indian steel-makers with disparate output volumes","authors":"J Ajith Kumar ,&nbsp;Sayan Mukherjee ,&nbsp;Alok Baveja ,&nbsp;K. Narayan ,&nbsp;Rajiv Misra","doi":"10.1016/j.jrtpm.2024.100447","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100447","url":null,"abstract":"<div><p>Over time, rail's share of the freight market has steadily decreased and, currently, is significantly lower than that of the road. This study explores what fosters shippers' rail dispreference. The study is conducted in the domain of outbound logistics in the steel-making industry in India. Twenty-one industry experts are interviewed in-depth to capture their perceptions, and their responses are analysed. Of these, seven are industry experts, and the remaining fourteen are logistics managers working across two steel plants, among which the annual output of one is about ten times that of the other. We find that a capacity shortage in the rail sector and the monopoly position of the rail transport provider together foster multiple factors that drive shippers' rail dispreference. Further, shipper firm size moderates the influence of some of these factors, influencing shippers' rail dispreference to a lesser extent in the larger firms than in the smaller ones. The study highlights the realization that while increasing rail capacity is necessary, it is not enough by itself, but must be complemented by targeted policy changes. The study brings to the forefront the roles played by rail capacity shortage, rail monopoly position, and shipper firm size in shippers' rail dispreference.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"30 ","pages":"Article 100447"},"PeriodicalIF":3.7,"publicationDate":"2024-05-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140822838","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Forecasting train arrival delays on the Ankara – Eskişehir high-speed line in Turkey 预测土耳其安卡拉-埃斯基谢希尔高速铁路列车到达延误情况
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-04-20 DOI: 10.1016/j.jrtpm.2024.100448
Özgül Ardıç
{"title":"Forecasting train arrival delays on the Ankara – Eskişehir high-speed line in Turkey","authors":"Özgül Ardıç","doi":"10.1016/j.jrtpm.2024.100448","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100448","url":null,"abstract":"<div><p>Railway operations may experience delays due to technical issues or weather conditions. Accurate prediction of such delays can enhance the quality of rail transport services and the effectiveness of railway operations. The study has developed the arrival delay prediction model using random forest regression based on the train operation data from the Ankara - Eskişehir high-speed train line in Turkey. The model can simultaneously predict arrival delays at all downstream stations on this line and continuously update these predictions as new information about train movements becomes available. The accuracy rates of the model vary from 76% to 99% under a 1-min prediction error. The results show that incorporating variables related to weather conditions and technical problems related to train control systems into the model improves prediction performance. The contribution of these variables to the model performance increases as the prediction horizon widens. The model results suggest that the model predictions may assist network managers in making better decisions about train operations. In order to evaluate the model's performance from the passengers' point of view, the study has proposed two methods: the proportion of late predictions and the stability of forecasts. The findings indicate that most trains (between 96.7% and 99%) have stable arrival delay predictions at target stations. The proportion of 2-min (or greater) late predictions, which means that the predicted delay exceeds the actual delay by 2 min or more, fluctuates from 14% to 0.5%, depending on the prediction horizon. Although the ratio for the short horizons (one station ahead) becomes relatively low, it is necessary to be cautious when using the model predictions to inform passengers because a prediction of more than 1 min late for short horizons might have negative consequences (e.g., misleading passengers to leave stations).</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"30 ","pages":"Article 100448"},"PeriodicalIF":3.7,"publicationDate":"2024-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140622452","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Capacity evaluation of ERTMS/ETCS hybrid level 3 using simulation methods 使用模拟方法对 ERTMS/ETCS 混合第 3 级进行容量评估
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-04-09 DOI: 10.1016/j.jrtpm.2024.100444
Daniel Knutsen , Nils O.E. Olsson , Jiali Fu
{"title":"Capacity evaluation of ERTMS/ETCS hybrid level 3 using simulation methods","authors":"Daniel Knutsen ,&nbsp;Nils O.E. Olsson ,&nbsp;Jiali Fu","doi":"10.1016/j.jrtpm.2024.100444","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100444","url":null,"abstract":"<div><p>This paper evaluates the capacity effect of ERTMS/ETCS Hybrid Level 3 (HL3, also known as Hybrid Train Detection, HTD) on a conceptual level by looking at a scenario with two trains and on a network level. Key performance indicators help evaluate the results of implementing HL3: headway for the conceptual model and capacity utilization and punctuality for the network level. The study uses the simulation tool RailSys for both levels. A case study on the interaction between two trains examines how various lengths of virtual blocks affect the performance indicator headway. The network scale simulations use a real-world infrastructure and a complete timetable. Two cases examine how the performance indicators capacity utilization and punctuality are affected by the share of Level 2 and Level 3 trains in a HL3 system. Results from the conceptual two-train interaction show that HL3 slightly improves the headway, but it is similar for varying virtual block lengths. The results from the network model indicate the share of Level 2 and Level 3 trains has minimal effect on punctuality and capacity utilization. However, we identified some factors influencing the HL3 capacity evaluation, like stations and switches on the line, that affect the potential capacity gains.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"30 ","pages":"Article 100444"},"PeriodicalIF":3.7,"publicationDate":"2024-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2210970624000143/pdfft?md5=e19ea3738fdb1382f0580a8d524fa8f4&pid=1-s2.0-S2210970624000143-main.pdf","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140540050","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Exploring the intra-platoon planning problem for heterogeneous train traffic under virtual coupling in the railway network via simulation 通过仿真探索铁路网虚拟耦合下异构列车交通的队内规划问题
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-04-07 DOI: 10.1016/j.jrtpm.2024.100442
Jiamin Zhang
{"title":"Exploring the intra-platoon planning problem for heterogeneous train traffic under virtual coupling in the railway network via simulation","authors":"Jiamin Zhang","doi":"10.1016/j.jrtpm.2024.100442","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100442","url":null,"abstract":"<div><p>Study on the platoon planning of virtual coupling (VC) is indispensable for both passenger and freight railway operation in terms of capacity, scheduling, and timetabling. As an advanced technology in train operation and control systems, VC can significantly improve the performance of rail operations, with regards to capacity, flexibility and robustness. In this study, we mainly focus on the former one, i.e., to maximize the capacity gains, by employing the relative braking distance based spacing policy for heterogenous train traffic. To our knowledge, this article is the first to address the VC intra-platoon planning problem for a railway network. The main function/purpose of this study is to decide a leader train and allocate an order to the heterogeneous follower trains for the virtually coupled platoon in the off-line mode. The objective is transformed to minimize and compare the sum of minimum safe distance for platoons on the common shared route sections in the railway network from various perspectives, so as to seek the desirable orders of potential train consists within the platoons from the perspective of the whole railway network. Our contributions are mainly threefold. First, the conditions for train platooning under virtual coupling are synthesized. Second, the solution flow charts and algorithms for simulation are proposed, including general framework for simulation, classification of prioritizing the shared common route section, and flow charts and algorithms for decision of coupling order to train platoons. Finally, the proposed methodology was tested and discussed on the designed computational experiment (i.e., numerical simulations of a typical case study with two sets of test examples) via NetLogo platform. The numerical simulation results series revealed some key findings and validated the effectiveness of the proposed methodology. Results of this study can provide guidance to decision makers in timetabling and potential capacity bottleneck identification under VC. We believe that it is worth investigating and further advancing this research direction in the future.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"30 ","pages":"Article 100442"},"PeriodicalIF":3.7,"publicationDate":"2024-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S221097062400012X/pdfft?md5=b3a357ffda94d0c9b4ddee02439d29f1&pid=1-s2.0-S221097062400012X-main.pdf","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140535119","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Microscopic railway capacity assessment of heterogeneous traffic under real-life operational conditions 现实运营条件下异质交通的微观铁路运力评估
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-04-06 DOI: 10.1016/j.jrtpm.2024.100446
Jan Lordieck , Michael Nold , Francesco Corman
{"title":"Microscopic railway capacity assessment of heterogeneous traffic under real-life operational conditions","authors":"Jan Lordieck ,&nbsp;Michael Nold ,&nbsp;Francesco Corman","doi":"10.1016/j.jrtpm.2024.100446","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100446","url":null,"abstract":"<div><p>A key strategy for increasing railway capacity is utilizing infrastructure more efficiently. While much research has been completed on methods for assessing railway capacity, very little has focused on the details of capacity utilisation, such as assessing the various ways trains use capacity, the impacts of specific blocking time components, and how train dynamics (accelerating, cruising, braking, and dwelling) affect capacity.</p><p>This paper presents a methodology for comparing planned occupancy to actual occupancy under real operations and applies it in a case study. The methodology is based on identifying a critical path which represents an extension of bottleneck concept presented in UIC leaflet 406. The methodology was applied in a case study to determine the specific blocking times and train dynamics which cause a blocking time gap for a sequence of trains, both a-priori and a-posteriori, after considering the operational variations. The analysis of real operations with variations in train trajectories shows that capacity occupation is mostly influenced by train sequence heterogeneity in the original schedule. The varying effects of operations have a smaller but relevant impact. The methods developed in this paper can be used to help assess railway capacity under real operations.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"30 ","pages":"Article 100446"},"PeriodicalIF":3.7,"publicationDate":"2024-04-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2210970624000167/pdfft?md5=0714c5b50e1758faf3265f41db5456a1&pid=1-s2.0-S2210970624000167-main.pdf","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140350395","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The impact of railway incidents on train delays: A case of the Swedish Railway Network 铁路事故对列车延误的影响:瑞典铁路网案例
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-03-30 DOI: 10.1016/j.jrtpm.2024.100445
Grace Mukunzi, Carl-William Palmqvist
{"title":"The impact of railway incidents on train delays: A case of the Swedish Railway Network","authors":"Grace Mukunzi,&nbsp;Carl-William Palmqvist","doi":"10.1016/j.jrtpm.2024.100445","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100445","url":null,"abstract":"<div><p>A foreseeable challenge with a substantial increase in railway mode share will be how to uphold punctuality. Higher volumes of train traffic will result in timetables that are more sensitive to disruptions; whose severity and frequency is also expected to increase in light of greater asset utilization and climate change. This calls for a definitive understanding of the relationship between incidents and train delays as a prerequisite to developing robust timetables and disruption management strategies. In this paper we propose a novel framework for quantifying the impact of railway incidents on train delays. Using a case of the Swedish Railway Network, we compare the impact of different incidents on train delays. The impact of delay is defined as a factor of the incident rate, exposure rate, delay rate and historical average delay minutes per incident. A logistic model that estimates the probability of delay for any train, in the event of a failure, is also developed. Snow on track was established as most critical, resulting in the highest normalized delay minutes per train and the largest increase in the odds of delay for individual trains. The proposed framework &amp; approach can be applied to other networks.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"30 ","pages":"Article 100445"},"PeriodicalIF":3.7,"publicationDate":"2024-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2210970624000155/pdfft?md5=d2201864a47f736af33bf50261b979da&pid=1-s2.0-S2210970624000155-main.pdf","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140328221","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Review and trends in regenerative braking energy recovery for traction power system with inverter substation in subway’s of São Paulo city 圣保罗市地铁变频分站牵引供电系统再生制动能量回收的回顾与趋势
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-03-28 DOI: 10.1016/j.jrtpm.2024.100443
Carlos Alberto de Sousa, Sergio Luiz Pereira, Ruan Streitenberger Guedes
{"title":"Review and trends in regenerative braking energy recovery for traction power system with inverter substation in subway’s of São Paulo city","authors":"Carlos Alberto de Sousa,&nbsp;Sergio Luiz Pereira,&nbsp;Ruan Streitenberger Guedes","doi":"10.1016/j.jrtpm.2024.100443","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100443","url":null,"abstract":"<div><p>Energy and environmental sustainability in transportation are becoming ever more important. In Brazil, the system electric traction represents the largest consumption of electric energy in the subway system. Electrified railway systems play an important role in contributing to the reduction of energy usage and CO2 emissions compared with other transport modes. For subway transit systems with frequently cycles of departures and braking of trains, the effective use of regenerative braking energy is a significant way to reduce the net energy consumption. The recovery of regenerative energy produced by braking trains of a subway system is essential to increase its energy efficiency, however difficult to apply in the São Paulo subway due to the short headway between train. This paper proposes evaluate through traction power network modeling and the computer simulation the application and feasibility of using inverter substation (ISS) to maximize the recovery of regenerative braking energy. The results of the study of Line 1 - Blue of the São Paulo’s metro city indicate that using inverter substation could reduce the energy consumption at the rectifier substation (RSS) by nearly 12,94% compared to the system without the inverter substation.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"30 ","pages":"Article 100443"},"PeriodicalIF":3.7,"publicationDate":"2024-03-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140309450","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Approximating rolling stock rotations with integrated predictive maintenance 利用综合预测性维护估算机车车辆轮换率
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-03-05 DOI: 10.1016/j.jrtpm.2024.100434
Felix Prause, Ralf Borndörfer, Boris Grimm, Alexander Tesch
{"title":"Approximating rolling stock rotations with integrated predictive maintenance","authors":"Felix Prause,&nbsp;Ralf Borndörfer,&nbsp;Boris Grimm,&nbsp;Alexander Tesch","doi":"10.1016/j.jrtpm.2024.100434","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100434","url":null,"abstract":"<div><p>We study the solution of the rolling stock rotation problem with predictive maintenance (RSRP-PdM) by an iterative refinement approach that is based on a state-expanded event-graph. In this graph, the states are parameters of a failure distribution, and paths correspond to vehicle rotations with associated health state approximations. An optimal set of paths including maintenance can be computed by solving an integer linear program. Afterwards, the graph is refined and the procedure repeated. An associated linear program gives rise to a lower bound that can be used to determine the solution quality. Computational results for six instances derived from real-world timetables of a German railway company are presented. The results show the effectiveness of the approach and the quality of the solutions.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"30 ","pages":"Article 100434"},"PeriodicalIF":3.7,"publicationDate":"2024-03-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140041926","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Service quality assessment of international rail transport with multiple border crossings: Eurasian rail transport as an example 具有多个边境口岸的国际铁路运输的服务质量评估:以欧亚铁路运输为例
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-02-15 DOI: 10.1016/j.jrtpm.2024.100432
Jing Shan , Nikola Bešinović , Jörn Schönberger
{"title":"Service quality assessment of international rail transport with multiple border crossings: Eurasian rail transport as an example","authors":"Jing Shan ,&nbsp;Nikola Bešinović ,&nbsp;Jörn Schönberger","doi":"10.1016/j.jrtpm.2024.100432","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100432","url":null,"abstract":"<div><p>International rail transport plays an essential role in the supply chain. Eurasian rail transport has been a successful example since its launch in 2011 and has increased over the last decade. However, a crucial question arises: Does this intercontinental rail service fulfill the transport requirements of the supply chain, and can it be quantified? Cost, reliability, transport time, and flexibility are essential factors in selecting transport modes in the supply chain. Current performance parameters mainly focus on efficiency, which may conflict with supply chain performance requirements. Before this research, it was difficult to quantify the international rail services; the frequently used tonne-based, volume-based (TEU), number of block trains, loaded, or empty container measurement forms cannot adequately capture the requirements of the global supply chain. Our literature review highlighted the need for standardized service attributes in international rail transport. Additionally, we identified a misalignment between rail performance and the demands of the global supply chain. This misalignment could impede the integration of international rail transport into the global supply chain. This paper contributes by developing universally applicable SCOR-Rail Key Performance Indicators (KPIs) for international rail transport based on the Supply-chain Operations Reference (SCOR) model. It bridges the measurement gap between the supply chain and international rail transport, giving railway companies a tool to design and monitor their services. They could also be easily integrated into rail planning for future research. Our initial assessment based on the proposed measurement framework revealed that Eurasian rail transport has the potential for improvement.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"29 ","pages":"Article 100432"},"PeriodicalIF":3.7,"publicationDate":"2024-02-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2210970624000027/pdfft?md5=f7c33debf5a07012e366dc60f1d7cd0e&pid=1-s2.0-S2210970624000027-main.pdf","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139738747","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Predicting and measuring service disruption recovery time in railway gravity hump classification yards 预测和测量铁路重力驼峰分级场的服务中断恢复时间
IF 3.7
Journal of Rail Transport Planning & Management Pub Date : 2024-02-14 DOI: 10.1016/j.jrtpm.2024.100433
Jiaxi Zhao, C. Tyler Dick
{"title":"Predicting and measuring service disruption recovery time in railway gravity hump classification yards","authors":"Jiaxi Zhao,&nbsp;C. Tyler Dick","doi":"10.1016/j.jrtpm.2024.100433","DOIUrl":"https://doi.org/10.1016/j.jrtpm.2024.100433","url":null,"abstract":"<div><p>Planned maintenance and unplanned incidents cause service disruptions in freight railway classification yards, creating congestion, delaying railcars, and even impacting mainline operations. Understanding the recovery time and lingering performance impacts of yard disruptions is vital for the industry to plan disruption responses, promote efficient resource utilization, and improve resiliency. This paper compares two major types of yard disruptions (temporary closures of hump process and pulldown process) and quantifies the recovery pattern, measured by multiple performance metrics. The authors propose an analytical approach for estimating classification yard recovery time as a function of disruption duration and baseline capacity utilization. To validate the hypothetical approach, a series of experiments are conducted across a wide range of disruption durations and throughput volumes in a representative hump classification yard simulation model constructed using AnyLogic. The results indicate that recovery time is proportional to shutdown duration with a near constant recovery rate, and recovery rate increases approximately exponentially with throughput volume. These results are consistent with the hypothesized analytical relationships, suggesting that yard capacity may be estimated from disruption recovery rate. The methodology developed also enables future studies on interactions between yards and mainlines and developing planning-level parametric models of classification yard capacity and performance.</p></div>","PeriodicalId":51821,"journal":{"name":"Journal of Rail Transport Planning & Management","volume":"29 ","pages":"Article 100433"},"PeriodicalIF":3.7,"publicationDate":"2024-02-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2210970624000039/pdfft?md5=e114b27a203c8216aacc9a0b6acd09d7&pid=1-s2.0-S2210970624000039-main.pdf","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139738748","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"OA","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信