Bina Teknika最新文献

筛选
英文 中文
ANALISA KINERJA RADIATOR MOBIL TERHADAP PERUBAHAN PEMBEBANAN AC 汽车散热器对空调过载性能的分析
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v12i1.90
S. Siagian
{"title":"ANALISA KINERJA RADIATOR MOBIL TERHADAP PERUBAHAN PEMBEBANAN AC","authors":"S. Siagian","doi":"10.54378/bt.v12i1.90","DOIUrl":"https://doi.org/10.54378/bt.v12i1.90","url":null,"abstract":"Radiator is one of heat exchanger applications that has a function to remove out of heat must be able to operate properly forallowed engine temperature limit. Vehicles that operate on the street usually driving with varying rpm so that the heat produced by the combustion process is not constant and then this study analyze the performance of radiators as a function of time (transient condition). Tests is done on the condition of operating the engine with five rpm variations, each for one hour with air conditioning load and without air-conditioning load. The data to be collected includ the inlet and outlet temperatureof radiator and radiator fluid volume flow. The results obtained is heat exhausted rate as a performance radiator is increasing as with increasing of engine rpm and at load conditions with the AC produces heat exhausted rate is greater than AC without AC load. The heat exhausted rate in an hour of machine operation still shows the system operates at a transient condition due to there still exists a numerical increase in the heat exhausted rate as a function of time.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"169 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115914548","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISA KINERJA SISTEM BILGE PADA JACK-UP DRILLING RIG HASIL DESIGN ULANG
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v12i1.98
Komarudin Komarudin, Syahawirya Ega Rahmadan
{"title":"ANALISA KINERJA SISTEM BILGE PADA JACK-UP DRILLING RIG HASIL DESIGN ULANG","authors":"Komarudin Komarudin, Syahawirya Ega Rahmadan","doi":"10.54378/bt.v12i1.98","DOIUrl":"https://doi.org/10.54378/bt.v12i1.98","url":null,"abstract":"On a project of building jack-up drilling rig CL15 done by PT.X and PT.Y, it uses standard bilge design of PT.X from existing jack-up drilling rig LL90 that has been ever done before. While the design of tanks and compartments CL15 is designed by PT.Y which has differences from the standard of PT.X there is also different rule to be applied . the LL90 uses France class (BV) while CL15 uses American class (ABS). By refering the rule of ABS and hydraulic system theory, the analysis is done covering design and operating capability of bilge system which is done maually so the changes that needs to be applied will be covered to prove that the design of LL90 can be used for CL15 under rule of ABS covering line design, pump capacity, velve selection. Direct suction, head loss, pump pressure which is more efficient","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125257239","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PEMBUATAN HULL PERAHU IKAN CADIK FIBER GLASS SKALA KECIL BAGI MITRA KELOMPOK NELAYAN 为游泳队的合作伙伴制作小型玻璃纤维化船
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v12i2.74
A. Marasabessy, Iswadi Nur, M. R. Hatuwe
{"title":"PEMBUATAN HULL PERAHU IKAN CADIK FIBER GLASS SKALA KECIL BAGI MITRA KELOMPOK NELAYAN","authors":"A. Marasabessy, Iswadi Nur, M. R. Hatuwe","doi":"10.54378/bt.v12i2.74","DOIUrl":"https://doi.org/10.54378/bt.v12i2.74","url":null,"abstract":"Event Service to the community for the partner group of fishermen village of Caringin District of Labuan Pandeglang in Banten Province aims to provide training and manufacturing miniature hull fishing boat outrigger fiber glass so that partners fishermen groups can manufacture fishing boats outrigger made of fiber glass are actually independently as an attempt to divert outrigger fishing boats from wood to glass fiber materials for the development of the fishing fleet in order to maintain/increase the fish catch in order to improve the standard of living to a better direction. The method used in the manufacture of miniature outrigger fishing boat fiber glass in the form of a lecture following the discussion/question and answer and applicative training with the involvement of partner group of fishermen. Plan activities that will be done in the implementation of manufacturing miniature hull fishing boat outrigger fiber glass that provides counseling by introducing wood and fiber glass as well as equipment to be used for the manufacture of hull miniature fishing boats outrigger fiber glass, the composition of the fiber glass to see the standardization of the mixture and training manufacture of molded semi parmanen which continued with casting hull miniature outrigger fishing boats.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133637189","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
TINJAUAN SISTEM CAISSON PADA PENYAMBUNGAN BLOK LAMBUNG KAPAL
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v12i1.93
Bambang Sudjasta
{"title":"TINJAUAN SISTEM CAISSON PADA PENYAMBUNGAN BLOK LAMBUNG KAPAL","authors":"Bambang Sudjasta","doi":"10.54378/bt.v12i1.93","DOIUrl":"https://doi.org/10.54378/bt.v12i1.93","url":null,"abstract":"To spur the development of the shipbuilding industry efficient and effective, then one will have to do is select the appropriate application of technology to existing conditions. Selection of the technology is closely related to the technical aspects in the field. National shipyards often get the order the construction of new ships with a capacity that exceeds the shipyard conditions. Based on limited means, but the implementation of the construction of ships should still be able to walk then attempted to carry out the connection of the hull below the water. With the adoption of block module, where assembly of the hull is divided into two parts, the module block bow and stern module block. Block modules separate hull is launched / lowered into the water, and then later made the connection in the water. As tools for splicing in the water system been caisson. Serves as a tool in connecting module block in the water then the caisson system must meet requirements such as: 1. The shape of the surface to be attached to the hull should have the same shape as the shape of the ship body. 2. Structure of the caisson to be strong enough. 3. The caissons must have stability and buoyancy are pretty good. In planning is the preparation before the second block of the module is launched into the waters, such as: 1. Determination of the number and dimensions of the hinge. 2. Determination of welding procedures. The process of implementing these connections include: 1. Control of the position of the module block such that the connections between the two. 2. Installation of the amplifier while. 2. Installation of the caisson continued process of welding the hull. 3. Examination of the results of the weld joint.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"42 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116923985","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PERENCANAAN PENGGUNAAN MATERIAL PLASTIK DAUR ULANG DENGAN SISTEM MANUFAKTUR BERKELANJUTAN DI POLITEKNIK MANUFAKTUR ASTRA 计划使用可再生塑料材料与阿斯特拉工业公司的可持续制造系统进行再造
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v11i2.102
K. Komarudin, N. Aisa
{"title":"PERENCANAAN PENGGUNAAN MATERIAL PLASTIK DAUR ULANG DENGAN SISTEM MANUFAKTUR BERKELANJUTAN DI POLITEKNIK MANUFAKTUR ASTRA","authors":"K. Komarudin, N. Aisa","doi":"10.54378/bt.v11i2.102","DOIUrl":"https://doi.org/10.54378/bt.v11i2.102","url":null,"abstract":"One of many kinds of production processes in Politeknik Manufaktur Astra is Plastic Injection Process with ABS material. This process will produce plastic and scrap. The amount of plastic scrap that is produced by this process reaches 50% of all of the amount. To increase the efficiency of ABS material and build up the culture of Sustainable Development System so that is done a kind of research that is focused on the utilization of plastic waste material from Process of Plastic Injection by doing a recycle process and using the product of recycle as the basic additive material in Plastic Injection Process. To figure out the properness of the material of recycled plastic as the main material in Plastic Injection Process so is also done a tensile test to any composition of recycled ABS material and valuing certain mechanical properties that are similar to original ABS material. Moreover to cut the cost of ABS material providing so is done an analysis of material reservation with EOQ method to figure out the economic number of material reservation. The calculation of EOQ showed the most economic amount per reserving is 75kg/reserve. By the utilization of recycled material and usage of EOQ method on providing the ABS material so that Politeknik Manufaktur Astra can do a cost reduction for 36%.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128198951","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ELIMINASI PENGARUH GAYA GONCANG TERHADAP KEAUSAN BANTALAN BOLA RADIAL 消除抖动对径向球轴承磨损的影响
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v11i2.115
Mohammad Galbi, A. Ishak
{"title":"ELIMINASI PENGARUH GAYA GONCANG TERHADAP KEAUSAN BANTALAN BOLA RADIAL","authors":"Mohammad Galbi, A. Ishak","doi":"10.54378/bt.v11i2.115","DOIUrl":"https://doi.org/10.54378/bt.v11i2.115","url":null,"abstract":"The vibration caused by the engine rotation must be within specified limits. A mechanism that is unbalanced or unstable will lead to excessive wear on ball bearings. Unbalanced condition is one of them due to a shaking force on the crankshaft which affects the wear of ball bearings as a pedestal. The problems that have been faced is the replacement of bearings after a failure caused by excessive force due to imbalance rocking rounds to get a replacement bearings before reaching failure (unreliable). The purpose of this study was to determine reliably the age of radial ball bearings in order to maintain the performance of the motor as well as the prevention of unplanned downtime nature. Prevention \"malfunction\" will avoid the effects on other components of diesel engines, particularly against compression disorders. Variation of residual unbalanced force large enough to cause interference with the ball bearings to reduce Mo, the rest of the unbalanced force can be siginifkan diturnkan.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"53 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128579309","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
KARAKTERISTIK HIDRODINAMIK DESAIN LAMBUNG KAPAL DENGAN RISE OF FLOOR DAN TANPA RISE OF FLOOR PADA PERAIRAN DALAM DAN DANGKAL
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v13i1.16
Bambang Sudjasta, W. Sulistyawati
{"title":"KARAKTERISTIK HIDRODINAMIK DESAIN LAMBUNG KAPAL DENGAN RISE OF FLOOR DAN TANPA RISE OF FLOOR PADA PERAIRAN DALAM DAN DANGKAL","authors":"Bambang Sudjasta, W. Sulistyawati","doi":"10.54378/bt.v13i1.16","DOIUrl":"https://doi.org/10.54378/bt.v13i1.16","url":null,"abstract":"In principle Manoeuvrability vessel is strongly influenced by the design of the hull, propulsion system and steering system. Some of these elements are directly give a significant effect on the hydrodynamic force and moment when the ship maneuver. Analysis of hydrodynamic aspects is a stage that is absolutely necessary in the design process of a ship, especially for ships operating in waters with varying depths. By the time the ship through the shallow waters can increase frictional resistance surge barriers and the vessel which resulted in a decrease in speed boats. The hull form with rise of floor and without the rise of floor by focusing on the analysis of the obstacles, the character of the ship motion and acceleration criteria in deep and shallow water conditions. In numerical calculations for shallow water conditions (shallow water) with a ratio of water depth and draft of the ships, h / d = 1.2 and deep water (deep water) with h / d = 20. Evaluation of the obstacles, the character motion and acceleration for heave, roll, pitch and yaw is done by combining numerical methods through Hullspeed and AQWA Ansys program. From this numerical calculation, it can be analyzed with the rise of the hull form floor and without a rise of floor optimum for deepwater and shallow.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128625735","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS KESEIMBANGAN LINTASAN UNTUK MENINGKATKAN PROSES PRODUKSI PADA AIR MINERAL DALAM KEMASAN 跟踪平衡分析,以增加瓶装水的生产过程
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v11i2.106
Harwan Ahyadi, Rudi Saputra, Eko Suhartanto
{"title":"ANALISIS KESEIMBANGAN LINTASAN UNTUK MENINGKATKAN PROSES PRODUKSI PADA AIR MINERAL DALAM KEMASAN","authors":"Harwan Ahyadi, Rudi Saputra, Eko Suhartanto","doi":"10.54378/bt.v11i2.106","DOIUrl":"https://doi.org/10.54378/bt.v11i2.106","url":null,"abstract":"Production is an economic activity that adds value by creating and providing goods and services, the creation of products or services and at the same time the creation of value. In economics, production is the act of creating the output, goods or services that have value and contribute to individual utilities.Production line balancing is a very important thing in planning production. Expected to regulate the flow of process efficiency can be achieved optimum production. In addition, the accumulation of intermediate goods from one machine to another machine, thus resulting in increased balance delay. In the process of making drinking water should be done step-by-step production process is handled hygienically, because bottled water products consumed directly by the human body. Drinking water production capacity is 5250 bottles per day, equivalent to 218 boxes, but the target is the company charged, equivalent to 7000 bottles of 291 boxes per day. With the method of determining the regional approach has obtained the standard time of each process for each work station and increase worker productivity, increased production capacities of 218 boxes / day to 295 boxes / day after the repair, companies gain efficiency by 35%","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128728563","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
PERANCANGAN RC (REMOTE CONTROL) BOAT PATROL 80 CM DENGAN PROPULSI WATERJET Perancangan rc(遥控)巡逻艇80厘米登干推进式喷水机
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v12i1.88
W. Sulistyawati, Purwo Joko Suranto
{"title":"PERANCANGAN RC (REMOTE CONTROL) BOAT PATROL 80 CM DENGAN PROPULSI WATERJET","authors":"W. Sulistyawati, Purwo Joko Suranto","doi":"10.54378/bt.v12i1.88","DOIUrl":"https://doi.org/10.54378/bt.v12i1.88","url":null,"abstract":"The government is still struggling to secure all the waters of the archipelago in maintaining and overseeing the security of its territory. This is due to the many islands that need human resources (HR) and require a lot of high-tech ships. So it is necessary to design a robot Electric Remote Control Waterjet Patrol 80 (ERC_WP 80) which could serve as patrol boats and destroyers. Waterjet propulsion drive system has a motion if the vessel was excellent at relatively high speed boats and has good acceleration capabilities. Boats with jet propulsion system can operate in very shallow waters. This is due to all parts of the engine located under the hull, including propeller, shaft and shaft house. Waterjet advantages compared with the steering system / rudder is conventional waterjet propulsion system is able to turn the steering wheel with a smaller angle. Maneuverability and good seakeeping of a ship is strongly influenced by the shape of the hull. Selection of the hull shape is designed to perform parametric studies hull of the vessel Fast Patrol Boats comparator (KPC) 14 1 228 m and the vessel JS Patrol. On the back of the boat is made with a slope angle (chine angle) of about 20 degrees in order to gain the necessary lifting force without reducing the stability of the ship. While at the front end of the ship made a slope angle of about 30 degrees with the intent facilitate ship moving at high speed and reduce the impact when the waves break. Unmanned patrol boats are designed using radio control GensAce 4S 3300mAh","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"9 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128119571","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
ANALISA RESISTIVITAS KAWAT PENGHANTAR DITINJAU DARI METODE JEMBATAN WHEATSTONE DAN METODE HUKUM OHM PADA MODUL PRAKTIKUM FISIKA 导线电阻分析是指WHEATSTONE桥的方法和物理实践模块的欧姆定律方法
Bina Teknika Pub Date : 2017-08-02 DOI: 10.54378/bt.v12i2.79
Tatik Juwariyah, Yuhani Djaja
{"title":"ANALISA RESISTIVITAS KAWAT PENGHANTAR DITINJAU DARI METODE JEMBATAN WHEATSTONE DAN METODE HUKUM OHM PADA MODUL PRAKTIKUM FISIKA","authors":"Tatik Juwariyah, Yuhani Djaja","doi":"10.54378/bt.v12i2.79","DOIUrl":"https://doi.org/10.54378/bt.v12i2.79","url":null,"abstract":"The analysis of the resistivity of a wire based on the Wheatstone bridge method and the Ohm law method in physics experiment module has been done. The analysis of the resistivity of a wire was done in a physics laboratory at UPNVJ engineering faculty. This topic was studied because there has been no experiment in the themed of electricity in the physics experiment module at the faculty of engineering UPNVJ. The most popular method applied to obtain wire resistivity value is the Ohm law method. In order to enlarge the understanding of the electricity concept, this research needed other method that can be used to find out the wire resistivity namely the Wheatstone Bridge method. This research aimed to obtain the resistivity value of Nichrome wire from two different methods. The methods were the Ohm law method and the Wheatstone bridge method. In Ohm law method, the wire length was subsequent varied. Then, the electric voltage value and an electric current were recorded. While in the Wheatstone bridge method, it was used circuit bridge. The value of the variable resistor was varied and the segment length metal plate was measured. The data were processed in order to obtain the Nichrome wire resistivity values by linear regression method. From Ohm law method and the Wheatstone bridge method were respectively obtained the value of Nichrome wire was ρ±Δρ=(2,875±0,005)x10-6 Ωm and ρ±Δρ=(5,00±0,25)x10-6 Ωm. The results of the two methods are match with the value of the standard of the Nichrome wire is ρ=1,0x10-6 Ωm. By using the two methods, it was expected that the students’ understanding of the electricity concept was increasingly widespread.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"52 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124751690","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信