Bina Teknika Pub Date : 2017-08-02 DOI:10.54378/bt.v12i1.93
Bambang Sudjasta
{"title":"TINJAUAN SISTEM CAISSON PADA PENYAMBUNGAN BLOK LAMBUNG KAPAL","authors":"Bambang Sudjasta","doi":"10.54378/bt.v12i1.93","DOIUrl":null,"url":null,"abstract":"To spur the development of the shipbuilding industry efficient and effective, then one will have to do is select the appropriate application of technology to existing conditions. Selection of the technology is closely related to the technical aspects in the field. National shipyards often get the order the construction of new ships with a capacity that exceeds the shipyard conditions. Based on limited means, but the implementation of the construction of ships should still be able to walk then attempted to carry out the connection of the hull below the water. With the adoption of block module, where assembly of the hull is divided into two parts, the module block bow and stern module block. Block modules separate hull is launched / lowered into the water, and then later made the connection in the water. As tools for splicing in the water system been caisson. Serves as a tool in connecting module block in the water then the caisson system must meet requirements such as: 1. The shape of the surface to be attached to the hull should have the same shape as the shape of the ship body. 2. Structure of the caisson to be strong enough. 3. The caissons must have stability and buoyancy are pretty good. In planning is the preparation before the second block of the module is launched into the waters, such as: 1. Determination of the number and dimensions of the hinge. 2. Determination of welding procedures. The process of implementing these connections include: 1. Control of the position of the module block such that the connections between the two. 2. Installation of the amplifier while. 2. Installation of the caisson continued process of welding the hull. 3. Examination of the results of the weld joint.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bina Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54378/bt.v12i1.93","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了刺激造船业的高效和有效的发展,那么一个要做的就是选择适合现有条件的技术应用。技术的选择与该领域的技术方面密切相关。国家造船厂经常接到建造容量超过船厂条件的新船的订单。基于有限的手段,但实施建造的船舶仍应能够行走,然后尝试在水下进行船体的连接。采用块式模块,其中船体的组装分为两部分,船首块模块和船尾块模块。块模块分开的船体下水/下水,然后在水中进行连接。作为水系统中拼接工具的沉箱。在水中作为连接模块块的工具,则沉箱系统必须满足以下要求:1。附在船体上的表面形状应与船体形状一致。2. 沉箱的结构要足够坚固。3.。沉箱必须有良好的稳定性和浮力。在规划中,第二块模块下水前的准备工作,如:1。铰链数量和尺寸的确定。2. 焊接程序的确定。实现这些连接的过程包括:1。控制模块块的位置,使两者之间的连接。2. 安装放大器的同时。2. 沉箱的安装继续进行船体焊接过程。3.。检查焊接接头的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
TINJAUAN SISTEM CAISSON PADA PENYAMBUNGAN BLOK LAMBUNG KAPAL
To spur the development of the shipbuilding industry efficient and effective, then one will have to do is select the appropriate application of technology to existing conditions. Selection of the technology is closely related to the technical aspects in the field. National shipyards often get the order the construction of new ships with a capacity that exceeds the shipyard conditions. Based on limited means, but the implementation of the construction of ships should still be able to walk then attempted to carry out the connection of the hull below the water. With the adoption of block module, where assembly of the hull is divided into two parts, the module block bow and stern module block. Block modules separate hull is launched / lowered into the water, and then later made the connection in the water. As tools for splicing in the water system been caisson. Serves as a tool in connecting module block in the water then the caisson system must meet requirements such as: 1. The shape of the surface to be attached to the hull should have the same shape as the shape of the ship body. 2. Structure of the caisson to be strong enough. 3. The caissons must have stability and buoyancy are pretty good. In planning is the preparation before the second block of the module is launched into the waters, such as: 1. Determination of the number and dimensions of the hinge. 2. Determination of welding procedures. The process of implementing these connections include: 1. Control of the position of the module block such that the connections between the two. 2. Installation of the amplifier while. 2. Installation of the caisson continued process of welding the hull. 3. Examination of the results of the weld joint.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信