Rekayasa Sipil最新文献

筛选
英文 中文
Faktor-Faktor yang Mempengaruhi Motivasi Pekerja pada Proyek Konstruksi Berdasarkan Latar Belakang Pekerja 影响工人建筑工程动机的因素基于他们的背景
Rekayasa Sipil Pub Date : 2023-05-03 DOI: 10.21776/ub.rekayasasipil.2023.017.02.3
Andhika Pradikta Setiawan, Anton Soekiman
{"title":"Faktor-Faktor yang Mempengaruhi Motivasi Pekerja pada Proyek Konstruksi Berdasarkan Latar Belakang Pekerja","authors":"Andhika Pradikta Setiawan, Anton Soekiman","doi":"10.21776/ub.rekayasasipil.2023.017.02.3","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.02.3","url":null,"abstract":"The benefits of motivation are that the work or task that is the responsibility of the worker will be completed quickly, worker absenteeism can be minimized, and the labor turnover will be smaller. Construction projects can absorb a lot of workers, each worker has a different background, different backgrounds can affect a person's mindset and interest differences, thus affecting the level of motivation and factors that can increase motivation will be different. This research is dedicated to find out what factors can affect the motivation of workers based on the background of workers. There are 30 factors that can increase the motivation of workers obtained from the literature review of previous research, which will be searched for its relationship with the level of motivation of workers by using regression analysis. A total of 212 respondents to obtain sample data to find the relationship of factors that can affect motivation with the level of motivation of workers using regression analysis. From the results of this study, it was found that the factors that have an influence on the motivation of workers in each classification of background, the result is that almost every different background has a different factor that has the most influence on the motivation of workers, so that everyone who has a different background has a different way of increasing motivation.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"4 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73547347","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Alternatif Desain Perkerasan Jalan dan Perkuatan Lereng Longsor 道路路面的替代设计和山体滑坡的冲击
Rekayasa Sipil Pub Date : 2023-05-03 DOI: 10.21776/ub.rekayasasipil.2023.017.02.11
Asrul Saputra, Edy Purwanto, M. Fauziah
{"title":"Alternatif Desain Perkerasan Jalan dan Perkuatan Lereng Longsor","authors":"Asrul Saputra, Edy Purwanto, M. Fauziah","doi":"10.21776/ub.rekayasasipil.2023.017.02.11","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.02.11","url":null,"abstract":"This study aims to provide an alternative design for flexible pavement and slope reinforcemen. To simplify the analysis process, this research will use the Geo5 program, the Kenpave program, the Bina Marga 2017, the Fellenius method, and the Wedge method. The results of alternative 3 flexible pavement designs are AC-WC 4 cm, AC-BC 5 cm, AC Base 6 cm, and LFA Class A 40 cm, with a load repetition value of 2.363.985 ESAL until deformation damage occurs at a service life of 20 years. For the soil nailing slope reinforcement design, the safe factor value is 1.90 ≥ 1.30 for the Wedge method calculation, and the safety factor value is 1.34 ≥ 1.30 for the results of the Geo5 program.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"2 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89504083","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analisis Biaya Operasional Kendaraan pada Angkutan Umum Bus Akibat Pandemi Covid-19 (Trayek Palangkaraya – Pangkalanbun) 分析了Covid-19流行病造成的公共汽车公共交通成本
Rekayasa Sipil Pub Date : 2023-01-03 DOI: 10.21776/ub.rekayasasipil.2023.017.01.1
Ari Widya Permana, Nirwana Puspasari
{"title":"Analisis Biaya Operasional Kendaraan pada Angkutan Umum Bus Akibat Pandemi Covid-19 (Trayek Palangkaraya – Pangkalanbun)","authors":"Ari Widya Permana, Nirwana Puspasari","doi":"10.21776/ub.rekayasasipil.2023.017.01.1","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.01.1","url":null,"abstract":"Bus transportation existence in Central Kalimantan is very important because it is able to carry out mass transportation, connecting and reaching all areas of Central Kalimantan. This research was conducted to obtain the appropriate amount of vehicle operating costs and passenger fares to be applied under normal conditions and during the COVID-19 pandemic. Primary data were obtained through questionnaires, namely vehicle operating costs components data and passenger trips data. Analysis was carried out based on Decree of Transportation Minister No. KM. 89 of 2002. Vehicle operating costs per seat kilometer for the Palangka Raya – Pangkalan Bun route on the Damri Bus are IDR 131.04/seat-km, while the Logos Bus is IDR 170.97/seat-km. Under normal conditions, the Damri Bus fare is IDR 190,453/passenger, while the Logos Bus fare is IDR 134,241/passenger. During the COVID-19 pandemic, the Damri Bus fare was IDR 216,707/pnp, while the Logos bus fare was IDR 198,435/pnp.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"25 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80164680","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Optimasi Waktu dan Biaya Pelaksanaan Proyek Jalan dengan Metode Crash Program (Studi Kasus: Pemeliharaan Jalan Kecamatan Tenggarong Seberang dan Tenggarong 通过“紧急事故”计划的方法实施时间优化和成本
Rekayasa Sipil Pub Date : 2023-01-03 DOI: 10.21776/ub.rekayasasipil.2023.017.01.7
Bernardo Sandrini Salasa Sandrini Salas, Dharwati P. Sari, Anung Sudibyo, Achmad Nur
{"title":"Optimasi Waktu dan Biaya Pelaksanaan Proyek Jalan dengan Metode Crash Program (Studi Kasus: Pemeliharaan Jalan Kecamatan Tenggarong Seberang dan Tenggarong","authors":"Bernardo Sandrini Salasa Sandrini Salas, Dharwati P. Sari, Anung Sudibyo, Achmad Nur","doi":"10.21776/ub.rekayasasipil.2023.017.01.7","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.01.7","url":null,"abstract":"Time, cost, and quality are three important elements of schedule that should be made in detail in order to assist in the evaluation of the project. In this research, we analyzed the acceleration of project completion duration. The case study on this research was taken in Tenggarong Seberang District and Tenggarong District. The method used in this research is the crash program method with the alternative implementation with a variety of added work hours and manpower, which are adding 1 hour, 2 hours, and 3 hours of work hours also the alternative of adding 25% and 50% of the manpower. This research aimed to determine the total time and cost of implementing the project after the crashed and determined the results of an optimal acceleration alternative by comparing the results of the analysis of the application of the crash program method. The work was accelerated (crashed) in this research is work that is on the critical path. The results of the application of the crash program method with the addition of working hours and manpower obtained an efficient acceleration alternative, namely the addition of 3 hours of working hours which resulted in the acceleration duration being 67 days or 25.56% faster than the normal duration of 90 days with a total acceleration cost of Rp 1,213,717,588.81 or 0.213% lower than the normal total cost of Rp 1,216,303,515.90.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"20 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80125789","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
An Implementation of Lean Concept with 5S to Eliminate Material Waste in Precast Factory 精益理念与5S在预制件工厂的实施消除材料浪费
Rekayasa Sipil Pub Date : 2023-01-03 DOI: 10.21776/ub.rekayasasipil.2023.017.01.9
Roland Gasenda Suryaningrat, Indradi Wijatmiko, Y. P. Devia
{"title":"An Implementation of Lean Concept with 5S to Eliminate Material Waste in Precast Factory","authors":"Roland Gasenda Suryaningrat, Indradi Wijatmiko, Y. P. Devia","doi":"10.21776/ub.rekayasasipil.2023.017.01.9","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.01.9","url":null,"abstract":"Precast industry is currently experiencing an increase in demand from consumers. Due to increasing demand, a wide variety of products, and push production systems, factories suffer from excess waste, disorganized workplaces, and unhealthy working environments, so it needs a method to overcome these problems. In overcoming this problem, research was carried out by implementing a lean concept with the concept of Seiri, Seiton, Seiso, Seiketsu, Shitsuke (5S) on the handling of waste materials that occur in the precast concrete production process. Material waste is obtained from interviews and analysis of the production cost budget assisted by the Pareto 80/20 method to determine materials that are included in the waste category. From the results of the Pareto analysis, it was found that 5 materials were wasted, namely Reinforcement Ø 13, Concrete Sand, Wire, Oil Formwork Console, and PC Strand 12.7. Then the results are re-analyzed with cause analysis based on the results of brainstorming with a quantity surveyor, two material wastages were obtained, namely wire and formwork console oil. The waste will be repaired with the seiri concept in the form of making a warehouse near the work area, so that later it will eliminate material wastage so that it can save oil. 2930-liter console formwork and 5915 kilograms of wire, with a total cost savings of IDR 123,758.060","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"32 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89188932","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Pengaruh Penambahan Serbuk Kaca pada Stabilisasi Tanah Lempung Lunak di Daerah Kabupaten Karawang
Rekayasa Sipil Pub Date : 2023-01-03 DOI: 10.21776/ub.rekayasasipil.2023.017.01.13
Bayu Mustika Bhakti, Sri Wulandari
{"title":"Pengaruh Penambahan Serbuk Kaca pada Stabilisasi Tanah Lempung Lunak di Daerah Kabupaten Karawang","authors":"Bayu Mustika Bhakti, Sri Wulandari","doi":"10.21776/ub.rekayasasipil.2023.017.01.13","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.01.13","url":null,"abstract":"Problems that are often encountered in road construction are poor and unstable soil conditions. Soil conditions greatly affect the design process and the durability of the road. One thing that is usually done to improve soil properties is to add mixed materials to improve the soil properties. The purpose of this study was to determine the effect of adding Waste Glass Powder (WGP) on soil consistency and CBR value. The percentage of WGP used is 2.5%, 5%, 10%, 15% and 25%. The result is that the addition of WGP has significantly improved soil quality. The value of the plasticity index of the soil decreases, which means that the potential for swelling and shrinkage of the soil is also decreased. The CBR value of the soil also increased to 341.04%.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"92 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82091982","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Pengembangan Model Perbaikan dan Peningkatan Kekuatan Struktur Sambungan Balok-Kolom pada Bangunan Pasca Gempa 震后建筑物柱梁连接器结构的改进和强度增强模型
Rekayasa Sipil Pub Date : 2023-01-03 DOI: 10.21776/ub.rekayasasipil.2023.017.01.15
S. Dewi, Wisnumurti Wisnumurti, Ari Wibowo, Aditia Dermawan
{"title":"Pengembangan Model Perbaikan dan Peningkatan Kekuatan Struktur Sambungan Balok-Kolom pada Bangunan Pasca Gempa","authors":"S. Dewi, Wisnumurti Wisnumurti, Ari Wibowo, Aditia Dermawan","doi":"10.21776/ub.rekayasasipil.2023.017.01.15","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.01.15","url":null,"abstract":"This paper presents an experimental study on repairing damaged beam-column reinforced concrete joints using carbon fiber reinforced polymer (CFRP). The test objects were in the shape of the letter T which represented the beam-column connection. The test object came from the previous research which had been failure. The retrofitted action includes strengthening the column position, injection with concrete glue and adding CFRP. Two kinds of CFRP were use, CFRP sheets (EB) and CFRP strips (NSM). The integrity of concrete after injection were tested with Ultrasonic Pulse Velocity (UPV). The retrofitted specimens were tested in loading frame to occurred strength, stiffness and ductility for each kind of retrofitted action. Three kind of tested were held, bending in one direction, shearing in one direction, and quasi cyclic bending. The selection test adjusted to the damage history of specimen.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"63 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76587404","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Assessment of Citarum River Water Quality in Majalaya District, Bandung Regency 万隆县Majalaya区Citarum河水质评价
Rekayasa Sipil Pub Date : 2023-01-03 DOI: 10.21776/ub.rekayasasipil.2023.017.01.6
Finna Fitriana, D. Yudianto, S. Sanjaya, A. F. Roy, Yong-Chan Seo
{"title":"The Assessment of Citarum River Water Quality in Majalaya District, Bandung Regency","authors":"Finna Fitriana, D. Yudianto, S. Sanjaya, A. F. Roy, Yong-Chan Seo","doi":"10.21776/ub.rekayasasipil.2023.017.01.6","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.01.6","url":null,"abstract":"Citarum River is one of the biggest rivers in Java Island and the primary source of Jakarta's water supply. Named the dirtiest river globally in 2013, the Indonesian government is committed to improving the Citarum River's water quality by 2025. However, the Majalaya District, the center of the textile industry area in the upstream part of the Citarum River, is indicated to have significantly contributed to the river pollution. Hence, it is essential to conduct a study to evaluate the water quality in the Citarum River, especially in the Majalaya District. The results showed a considerable decrease in water quality from upstream to downstream of the Citarum River in 2013-2021. Concurrently, it was also found that the factory effluent far exceeded the permissible limit.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"89 2 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87710132","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Analysis of Masonry Behavior on Non-engineered House Building Towards Lateral Deformation by Using Finite Element Method Based on Guidelines 基于准则的非工程住宅砌体侧向变形性能有限元分析
Rekayasa Sipil Pub Date : 2023-01-03 DOI: 10.21776/ub.rekayasasipil.2023.017.01.10
Sri Heny Hidayati, A. Soehardjono, Wisnumurti Wisnumurti
{"title":"Analysis of Masonry Behavior on Non-engineered House Building Towards Lateral Deformation by Using Finite Element Method Based on Guidelines","authors":"Sri Heny Hidayati, A. Soehardjono, Wisnumurti Wisnumurti","doi":"10.21776/ub.rekayasasipil.2023.017.01.10","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.01.10","url":null,"abstract":"This study is based on the abundant damaged house building during the earthquake. Wall is an important part of a non-engineered house. It is constructed by clay bricks and mortar. The damage happened to the house building is not separated from the specification of the clay bricks used. Dynamic simulation towards the non-engineered construction would reveal the displacement value that happened to the structure of mansory that applies the guidelines from SNI, ACI, and condition in the field. The dynamic simulation of an ordinary non-engineered house employed finite element method. The purpose of this research is to find out the mechanical performance of the mansory when the earthquake is occurring. The method implemented in this research is scientific analysis through collecting the available theories and data from the previous research. A scientific method is started with deciding a concept based on the events frequently and generally happened in the field which are also considered a novelty. The following step is conducting data analysis by using finite element method where the maximum deformation displacement value reached ux 0.008 cm, uy 0.044 cm and uz 0.008 cm. From the simulation it can be concluded that the biggest displacement happened to mansory constructed based on the field condition.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"58 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75347746","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Durabilitas Campuran AC-WC Menggunakan Batu Gunung Baba, Tana Toraja 多种混合厕所使用巴巴塔纳托拉雅山的石头
Rekayasa Sipil Pub Date : 2023-01-03 DOI: 10.21776/ub.rekayasasipil.2023.017.01.14
Louise Elizabeth Radjawane
{"title":"Durabilitas Campuran AC-WC Menggunakan Batu Gunung Baba, Tana Toraja","authors":"Louise Elizabeth Radjawane","doi":"10.21776/ub.rekayasasipil.2023.017.01.14","DOIUrl":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.01.14","url":null,"abstract":"The decline in road service conditions in the form of road damage can be caused by water due to high rainfall so that it enters the pavement layer. This study aims to determine the durability or resistance of the AC-WC mixture using Mount Baba stone. By using the Marshall test method, the results obtained through the Marshall immersion test with variations in immersion time from 0.5 hours - 60 hours, namely the durability value of 95.02 % - 86 34%. Thus, there is a decrease in the durability of the mixture with the duration of the immersion time. This is due to the large number of cavities and pores filled with water, the mixture becomes impermeable or easily damaged.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"36 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75925857","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.