Journal of Engineering and Management in Industrial System最新文献

筛选
英文 中文
INTEGRATED RISK MANAGEMENT MODEL RELATED TO OCCUPATIONAL SAFETY IN MULTI-STOREY BUILDINGS 多层建筑职业安全综合风险管理模型
Journal of Engineering and Management in Industrial System Pub Date : 2018-10-11 DOI: 10.21776/ub.jemis.2018.006.01.4
D. Handayani
{"title":"INTEGRATED RISK MANAGEMENT MODEL RELATED TO OCCUPATIONAL SAFETY IN MULTI-STOREY BUILDINGS","authors":"D. Handayani","doi":"10.21776/ub.jemis.2018.006.01.4","DOIUrl":"https://doi.org/10.21776/ub.jemis.2018.006.01.4","url":null,"abstract":"The goal of this research is to apply risk management model related to the Occupational Health and Safety (OHS) by integrating Causal Effects Diagram ( CED), Analytic Network Process (ANP) and Interpretive Structural Modeling (ISM). The research method consists of three (3) stages. Stage 1) Using CED method to know the correlation between the risks and their causes. Stage 2) Making an assessment by using Analytic Network Process (ANP) with Software Matlab, stage 3) Interpretive Structural Modeling (ISM) is used to get the model of connectivity in mitigation of occupational accident. From ANP method, it is clear that the dominant potential risk in structural phase is 44% and the highest cause of accident by human factor is 77%, and it is due to the unsafe behavior. ISM method is used to know the mitigation in reducing the occupational accident risks, namely improvement of Occupational Health and Safety (OHS) management, Each Scaffolding establishment must be inspected by a certified expert, the working methods must obey the Indonesian National Standard (SNI), The risk control should be done in relation to potential cause of occupational accident which can minimize the risk on construction work ( zero accident ).","PeriodicalId":31715,"journal":{"name":"Journal of Engineering and Management in Industrial System","volume":" ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"48861393","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY 考虑库容的概率q缺货模型的煤炭库存规划与控制
Journal of Engineering and Management in Industrial System Pub Date : 2018-10-11 DOI: 10.21776/UB.JEMIS.2018.006.01.3
R. Ekawati
{"title":"PLANNING AND CONTROLLING INVENTORY OF COAL USING MODEL PROBABILISTIC Q BACKORDER WITH CONSIDER OF STORAGE CAPACITY","authors":"R. Ekawati","doi":"10.21776/UB.JEMIS.2018.006.01.3","DOIUrl":"https://doi.org/10.21776/UB.JEMIS.2018.006.01.3","url":null,"abstract":"Inventory of fuel is very important in the production process, because the fuel is one factor that ensures smooth production process. PT. XYZ is a company engaged in provision power and steam with the coal. On determining amount of the current inventory of coal in PT XYZ still fluctuating from storage capacity, so it is necessary to study the planning and controlling inventory of coal with consider of storage capacity. This study aims to optimize the amount of the coal fuel, determine reorder point, determine safety stock and determine total cost of inventory using inventory probabilistik Q model backorder storage capacity constrain. Data processing results obtained optimal order for each the coal is as much as 11.000 tons, Reorder point is as much as 607,346 tons, safety stock is as much as 1,292 tons and total cost of inventory is as much as Rp. 16.052.531.575 using inventory probabilistik Q model backorder storage capacity constrain.","PeriodicalId":31715,"journal":{"name":"Journal of Engineering and Management in Industrial System","volume":" ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42378839","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PERFORMANCE ASSESSMENT AND EVALUATION OFCURVING MACHINE OPERATOR AT PT.XYZ USING ANALYTICAL HIERARCHY PROCESS(AHP) AND RATING SCALE 基于层次分析法和评分量表的PT.XYZ数控机床操作人员绩效评估
Journal of Engineering and Management in Industrial System Pub Date : 2018-10-11 DOI: 10.21776/UB.JEMIS.2018.006.01.6
Muhammad Rusdi
{"title":"PERFORMANCE ASSESSMENT AND EVALUATION OFCURVING MACHINE OPERATOR AT PT.XYZ USING ANALYTICAL HIERARCHY PROCESS(AHP) AND RATING SCALE","authors":"Muhammad Rusdi","doi":"10.21776/UB.JEMIS.2018.006.01.6","DOIUrl":"https://doi.org/10.21776/UB.JEMIS.2018.006.01.6","url":null,"abstract":"PT. XYZ is a company engaged in manufacturing the defense and security products for military and commercial, which consists of 20% of military products and 80% of commercial products. This study aims to determine the performance assessment of the curving machine operator s in PT.XYZ. Previously, t he system of operator's performance assessment has an incomplete criterion that is less likely to reflect actual operator performance and the absence of reference data for annual bonus sharing. To get an accurate operator performance , then conducted an assessment based on the Spencer competency owned by each operator. The dimensions of this assessment are based on objective and subjective judgments. Research data were collected by observation and filling out the questionnaire . Then , data were analyzed using E xpert Choice software. The method of Analytic Hierarchy Process (AHP) was chosen in accordance with the research problems and objectives. After obtaining the final result of weight of Analytic Hierarchy Process (AHP), the next performance assessment was done by integration with Rating Scale method. The results show that there is a difference in the measurement of performance evaluation of the prior and new method , this is due to additionalcriteria taken into the new assessment, including absenteeism (presence), quantity of work, work quality, work safety, teamwork, and so forth .","PeriodicalId":31715,"journal":{"name":"Journal of Engineering and Management in Industrial System","volume":" ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"47345649","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PROJECT SCHEDULING ANALYSIS USING PRECEDENCE DIAGRAM METHOD (PDM) 基于优先图法(pdm)的项目进度分析
Journal of Engineering and Management in Industrial System Pub Date : 2018-10-11 DOI: 10.21776/ub.jemis.2018.006.01.5
Andani Devi Novitasari, Rina Sandora, Rahandini Lukita Lestari
{"title":"PROJECT SCHEDULING ANALYSIS USING PRECEDENCE DIAGRAM METHOD (PDM)","authors":"Andani Devi Novitasari, Rina Sandora, Rahandini Lukita Lestari","doi":"10.21776/ub.jemis.2018.006.01.5","DOIUrl":"https://doi.org/10.21776/ub.jemis.2018.006.01.5","url":null,"abstract":"Many obstacles that affect the completion of the project late, like: weather, late general plan approval, late material arrival, less skills and others. The Precedence Diagram Method is the method used to create network planning especially project scheduling. This research will examine how to plan the proper project scheduling of Pressure Vessel project of PT Wika Technip which is done by PT. Barata Indonesia by using PDM.The results obtained from the cost calculation at 252 days of project life have total project cost of Rp.6.131.093.885,00 and at project age 243 days total project cost is Rp.6.236.994.056,00. In this case it is known that there is an increase in total cost of Rp.105.900.171,00 and the time difference of 9 days when the acceleration is done on the project duration from 252 days to 243 days.","PeriodicalId":31715,"journal":{"name":"Journal of Engineering and Management in Industrial System","volume":" ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42224868","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
BUSSINESS PROCESS REENGINEERING APPROACH FOR QUALITY REPORTING PROCESS (Case Study at PT D. Perdana, Pasuruan) 质量报告过程的业务流程再造方法(Pasuruan的PT D. Perdana案例研究)
Journal of Engineering and Management in Industrial System Pub Date : 2018-10-11 DOI: 10.21776/UB.JEMIS.2018.006.01.1
Oke Oktavianty
{"title":"BUSSINESS PROCESS REENGINEERING APPROACH FOR QUALITY REPORTING PROCESS (Case Study at PT D. Perdana, Pasuruan)","authors":"Oke Oktavianty","doi":"10.21776/UB.JEMIS.2018.006.01.1","DOIUrl":"https://doi.org/10.21776/UB.JEMIS.2018.006.01.1","url":null,"abstract":"Business Process Reengineering (BPR) is an effective and popular approach to deal with global competitiveness. It can be applied by companies to improve the effectiveness and efficiency of existing business processes . Developing a continual improvement and abandon the conventional ways will increase the work efficiency. The process can be transformed to create a more efficient process with value-added and get more benefit to the company in the future. In this study, the evaluation of quality reporting process was conducted by BPR approach. The re-design and reconstruction of the process with information technology implementation give a significant improvement in the work efficiency, both efficiency value, step number, and time efficiency.","PeriodicalId":31715,"journal":{"name":"Journal of Engineering and Management in Industrial System","volume":" ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"45665687","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
QUALITY MEASUREMENT CUSTOMER SATISFACTION INDEX (CSI) METHOD AND IMPORTANCE-PERFORMANCE ANALYSIS (IPA) DIAGRAM PT. ASDP INDONESIA FERRY (PERSERO) Merak – Banten 质量测量客户满意度指数(CSI)方法和重要性-绩效分析(IPA)图PT.ASDP INDONESIA FERRY(PERSERO)Merak–Banten
Journal of Engineering and Management in Industrial System Pub Date : 2018-10-11 DOI: 10.21776/UB.JEMIS.2018.006.01.2
A. Gunawan, Iqbal Iqbal
{"title":"QUALITY MEASUREMENT CUSTOMER SATISFACTION INDEX (CSI) METHOD AND IMPORTANCE-PERFORMANCE ANALYSIS (IPA) DIAGRAM PT. ASDP INDONESIA FERRY (PERSERO) Merak – Banten","authors":"A. Gunawan, Iqbal Iqbal","doi":"10.21776/UB.JEMIS.2018.006.01.2","DOIUrl":"https://doi.org/10.21776/UB.JEMIS.2018.006.01.2","url":null,"abstract":"Service quality is a very important aspect to be considered to retain consumers. PT. ASDP INDONESIA FERRY (PERSERO) Merak Banten its duties as providers and services in the field of crossings. Measurement of customer satisfaction by using the method of the Customer Satisfaction Index (CSI) and Importance-Performance Analysis (IPA) diagram, Customer Satisfaction Index (CSI) value is 80,68%. which is the priority of improvement to improve customer satisfaction of PT ASDP INDONESIA that is in dimension of attributes intangible dimension is about toilet facility, this attribute need to be repaired because in its implementation there are still complaints from passengers and attributes that are contained in the dimensions responsiveness is regarding the speed and responsiveness in serving the passengers, responsiveness of the officer in providing information in providing the arrival and departure time , and the attributes contained in the assurance dimension is about the security level of the port area","PeriodicalId":31715,"journal":{"name":"Journal of Engineering and Management in Industrial System","volume":" ","pages":""},"PeriodicalIF":0.0,"publicationDate":"2018-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"42118329","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信