{"title":"Rancang Bangun Rangkaian Penggerak Motor Solar Tracker","authors":"I. W. Sugara Yasa, I. M. Asna, Catur Sumartdiono","doi":"10.38043/telsinas.v5i1.3757","DOIUrl":"https://doi.org/10.38043/telsinas.v5i1.3757","url":null,"abstract":"A Solar Tracker is a device that directs the payload towards the sun. Solar panel charge, parabolic trough, Fresnel reflector, mirror or lens. For flat panel photovoltaic systems, tracers are used to minimize the angle of incidence between the incoming sunlight and the photovoltaic panels. This system increases the amount of energy generated from the fixed amount installed in the power generation capacity. Solar Cell or solar panels are electronic components that convert solar energy into electrical energy. Photovoltaic (PV) is a technology that functions to convert or convert solar radiation into electrical energy. each function as a store of electrical energy received by the solar cell. The solar tracker can follow the movement of sunlight from east to west and look for the strongest sunlight, and the design of this system can provide an efficiency value of 3% to 25% of solar panel electricity output in utilizing solar energy. By utilizing 4 Light Dependent Resistor (LDR) sensors, the maximum movement of the solar panels can move through 2 stepper motors connected to the solar tracker system.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"29 1-2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133650055","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Analisis Biaya Perjalanan Lalu Lintas Akibat Adanya Pengaruh Hambatan Samping pada Ruas Jalan Raya Canggu","authors":"I. G. A. Pramesta, I. N. Wismantara, D. Putri","doi":"10.38043/telsinas.v5i1.3731","DOIUrl":"https://doi.org/10.38043/telsinas.v5i1.3731","url":null,"abstract":"Canggu Village is a village located in the tourist area of southern Bali. resulting in economic activity originating from tourism activities. transportation has greatly increased. especially in traffic conditions. this is the interest of researchers to analyze the cost of traffic travel due to side barriers. This method is to ensure the presentation of road fractions referring to the 1997 MKJI and the calculation of the BOK for vehicles involving the strategy of the Ministry of Public Works in 2005. Meanwhile, the calculation of the BOK for bicycles refers to the DLLAJ strategy. for the Province of Bali - PTS Consultant 1999. The consequences of this study are: 1) The current appearance of the Canggu Highway with the presence of side barriers are: The capacity of the street portion is 2.883 pcu/hour at top hours in the first part of the day. evening. what's more, evening. The degree of saturation or v/c ratio on the existing road is 0.513 for the morning peak hours. 0.469 and 0.496 for the afternoon and evening peak hours. The speed of light vehicles during the morning top hours is 13.48 km/hour. the afternoon peak hours are 14.11 km/hour and the afternoon peak hours are 13.48 km/hour hours. The level of service for each peak hour is at service level F. 2) The total traffic cost due to the presence of side barriers per 12 hours of observation is Rp. 4.372.938.06. and the cost of travel in each peak hour is for the morning peak hour at 07.15-08.15 Rp. 356.444.50. the peak hour at 12.15-13.15 is Rp. 297.484.08 peak hours in the afternoon at 16.15-17.15 for Rp. 707.875.89.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"37 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133813853","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Perencanaan Instalasi Listrik di Hotel dan Villa Maua Nusa Penida","authors":"I. W. D. Pancane, R. Silitonga, I. Asna","doi":"10.38043/telsinas.v5i1.3664","DOIUrl":"https://doi.org/10.38043/telsinas.v5i1.3664","url":null,"abstract":"Maua Nusa Penida is one of the hotels and villas in Nusa Penida which will be discussed in this research. The number of hotel blocks to be built is 4 blocks, where each block consists of 8 rooms. As for the villa as many as 26 various villas. There is also a main building and a restaurant that will serve as future support. Once the existing buildings are complex, the developers are required to plan all the buildings to be built in order to obtain security and also economic factors in the development process. From the results of the planning that has been carried out on each building, each building requires a different number of lights depending on the type of lamp, the type of building and also the area of the building. After getting the total electricity demand in a building, planning is continued by determining the area of cable conductors that supply each building. From the calculation results, it is also known that the type of cable used is planting cable (NYRGbY & NYFGbY) which has good insulation when planted in the ground and follows the provisions of PLN regarding voltage loss, which does not exceed 5% at the end of the conductor. The safety used in buildings uses MCB and also MCCB. Meanwhile, the safety of electric current in the LVMDP and SDP sections uses MCCB components. From the planning results, the total electricity demand is 159,441VA for zone 1 villas and also 142,536VA for zone 2 villas. From this calculation it is also known that the PLN power requirement in each zone is 164,000 VA. To get the convenience and reliability of the electrical system in this hotel and villa, the supply of electrical power in addition to the electricity source from PLN is also equipped with a backup power generator of 200 KVA in each zone.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123969070","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Rancang Bangun Sistem Monitoring Dan Kontrol Kebocoran Gas Elpiji dengan Mikrokontroler NodeMCU ESP8266","authors":"Nyoman Gede Adrama, G. Ramadhan, I. Sukadana","doi":"10.38043/telsinas.v5i1.3754","DOIUrl":"https://doi.org/10.38043/telsinas.v5i1.3754","url":null,"abstract":"The role of information technology in security is also getting stronger, this is shown by the company's innovation to use technology to support their security equipment. LPG cylinder explosions are usually caused by human error. To minimize human error in the gas installation system, I designed and built a prototype of an LPG gas leak detector with an MQ-2 gas sensor and NodeMCU ESP8266 microcontroller as an input and output controller. The input is an MQ-2 gas sensor and the output is a solenoid valve. The gas sensor detects an increased ambient gas leak odor condition. If the gas odor has exceeded the maximum predetermined limit, the NodeMCU microcontroller will provide an indicator on the panel then send a message to the smartphone via the telegram application and turn off the gas line.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130264943","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Kendala Pada Pelayanan Pembuatan Izin Mendirikan Bangunan di Kabupaten Badung","authors":"I. N. A. Kumara, I. N. Ariana, K. Ariana","doi":"10.38043/telsinas.v5i1.3749","DOIUrl":"https://doi.org/10.38043/telsinas.v5i1.3749","url":null,"abstract":"On October 5, 2020 the Job Creation Act (UU Ciptaker) was passed and removed the requirements for a building permit (IMB) to obtain a development, structuring, and building construction permit. This is due to the complexity of the investment licensing process in Indonesia. Badung Regency is an attraction for investors to invest as well as apply for an IMB because it is a tourism area. This results in a lot of development and will indirectly increase the number of applications for IMB management. The process of obtaining IMB in Badung Regency is carried out by the Badung Regency Investment and One Stop Integrated Service (DPMPTSP). This study describes the constraints on the service of making IMB in Badung Regency. Collecting data using mixed research methods, quantitative descriptive analysis, and thematic analysis, in order to obtain 14 obstacles faced in IMB services in Badung Regency. These constraints can be grouped based on the processes that must be passed in the IMB service in Badung Regency. All of these obstacles were obtained based on literature studies, interviews with expert staff, as well as guided by regulations, time baselines, and criteria contained in the applicable SOPs.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"47 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127593474","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Pengaruh Up Grade Transformator 160 kVA dan 100 kVA Menjadi 250kVA/400V Terhadap Biaya Operasional Pemakaian Energi Listrik di Hotel Tonys Villa Resort and Spa","authors":"I. Sutama, Komang Hermawan, I. W. Suriana","doi":"10.38043/telsinas.v5i1.3689","DOIUrl":"https://doi.org/10.38043/telsinas.v5i1.3689","url":null,"abstract":"Hotel Tonys Villa and Resort was established in 2000 which is one of the 4-star hotels on the island of Bali which is located on Jalan Petitenget, South Kuta District, Badung. This hotel has a number of rooms, namely 22 Bungalow Rooms, 9 Pinky Villas, 40 Hotel Rooms, 3 large public pools and so on. One of the problems faced by this hotel is the increase in energy operational costs that are paid more than the budget with a minus average of Rp. 837,713 to Rp. 11,851,463 for each month. The method used is to analyze electricity cost savings by upgrading 160 and 100 KVA transformers to 1 250 KVA transformer, and analyze whether one 250 kVA transformer is able to carry the entire burden of Tonys Villa and Resort Hotel. The use of a 250 KVA transformer is considered more efficient than the use of a transformer (160 KVA and 100 KVA) with a cost difference of IDR 12,875,350 for each month and can save around IDR 154,504,200 within 1 year. In calculating the RM (Minimum Account) fee for the use of a 250 KVA transformer, it is considered more efficient and can save costs of Rp. 4,625,480 for each month if the use of the transformer is less than 40 hours and if the customer uses the transformer for more than 40 hours of use, then the financing will be calculated normally.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"83 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126180104","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Yolanda Dewi Puspita Ayu, Daeng Rahmatullah, Istiyo Winarno
{"title":"Koordinasi Adaptif DOCR Pada Sistem Transmisi Loop Multi Generator Menggunakan Modified Firefly Algorithm-Artificial Neural Network","authors":"Yolanda Dewi Puspita Ayu, Daeng Rahmatullah, Istiyo Winarno","doi":"10.38043/telsinas.v4i1.2093","DOIUrl":"https://doi.org/10.38043/telsinas.v4i1.2093","url":null,"abstract":"Protection system is a very important component in the electric power distribution system. With good reliability, the distribution of electrical power will be better, one of which is by minimizing disruption to the system quickly, precisely and accurately. Components used in protection systems are directional overcurrent relays (DOCR). In this study proposed optimal and adaptive protection coordination using the Modified Firefly Algorithm-Artificial Neural Network (MFA-ANN) tested on the IEEE 9 real bus loop system with 4 generation combinations. Optimization using MFA will get the Time Delay Setting (TDS) and Ipickup (lowset) values. The ANN used is Backpropagation Lavenberg Marquardt (BPLM) After the BPLM learning process, we will get the weight and bias values of the training results and later as a reference value to get the value of TDS and Ipickup relay. The process will produce relay settings automatically based on the results of optimization and MFA-ANN training which are then simulated on the IEEE 9 bus loop system. The results achieved by MFA-ANN are suitable methods for modeling optimal and adaptive relay coordination systems. ANN training with the BPLM algorithm produces the smallest MSE value of 5.9308xE-10.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"106 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124770681","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Rancang Bangun REFLECTOR Untuk Mengoptimalkan Daya Serap Matahari Pada Panel Surya Dengan Variasi Sudut Guna Menghasilkan Daya Optimal","authors":"Sugeng Hariyanto","doi":"10.38043/telsinas.v4i1.2896","DOIUrl":"https://doi.org/10.38043/telsinas.v4i1.2896","url":null,"abstract":"Various kinds of treatments given to solar panels illustrate efforts to increase the output power of solar panels and the efficiency of solar cells. In the following research, we will analyze the differences in the output power and efficiency of solar cells that have received different treatments. In the solar panel that will be analyzed in this study is the addition of a reflector to solar cells with a reflector tilt angle of 90 ° and 60 ° as a form of variation of radiation amplification. The idea for the use of a reflector is to increase the yield of solar cell input radiation. After testing, the output power produced by solar cells increases as the radiation received by the solar panels increases and the efficiency of the solar panels decreases as the temperature of the solar cells increases.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"74 3","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132359546","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Analisis Daktilitas Struktur Gedung Rangka Beton Bertulang Dengan Metode Analisis Pushover","authors":"Ketut Nuraga, D. Putri, K. Antriksa, Joao Ficher","doi":"10.38043/telsinas.v4i2.3342","DOIUrl":"https://doi.org/10.38043/telsinas.v4i2.3342","url":null,"abstract":"Hasil analisis daktilitas struktur gedung beton bertulang dengan metode analisis Pushover menggunakan program SAP2000 didapat besarnya perpindahan pada sendi plastis saat ultimit dengan sendi plastis yang pertama kali terbentuk, diperoleh faktor daktilitas pada arah x sebesar (?) = 2,29 dan arah faktor daktilitas arah y sebesar (?) = 2,42 nilai faktor aktual daktilitas tersebut menunjukan bahwa struktur gedung tersebut bersifat Daktail parsial, dimana struktur mengalami respon inelastic.","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"59 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124682161","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Komitmen Manajer Proyek Terhadap Keberhasilan Proyek Konstruksi Gedung di Wilayah Perkotaan Sarbagita","authors":"Ayu Mirayani Pradnyadari Ni Luh Made","doi":"10.38043/telsinas.v4i1.2882","DOIUrl":"https://doi.org/10.38043/telsinas.v4i1.2882","url":null,"abstract":"Project manager is leader of project organization who take responsibility for whole projects in purpose to get it wrapped succesfully. Commitment is an important thing for a project manager. A project manager who isn't committed might impact into the failure of a project, as well as inflated costs, late project completion and unmet quality. This studi aimed to analyze the relationship between project manager commitment to the success of building construction projects. This research was conducted on a building construction project in the Sarbagita Urban area (Denpasar City, Badung Regency, Gianyar Regency, and Tabanan Regency). Collecting data through a survey using a questionnaire. Respondents selected based on the purposive sampling method, includes the criteria of people who have been / are handling the implementation of building construction projects, have at least three years of experience, have the position of project manager, Site Manager, Operational Manager, which includes 60 respondents. Data processing using Partial Least Squares analysis with SmartPLS 3.0 software. The results of the analysis show that the Project Manager's Commitment has a positive and significant effect on the success of building construction projects. The most dominant commitment variable was a career commitment of 0.241, followed by a normative commitment of 0.237, a continuance commitment of 0.228, and an affective commitment of 0.217","PeriodicalId":252670,"journal":{"name":"Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi","volume":"103 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-03-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127135671","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}