PETRO最新文献

筛选
英文 中文
OPTIMASI PRODUKSI SUMUR EC-6 DENGAN MEMBANDINGKAN PENGANGKATAN BUATAN GAS LIFT DAN ELECTRIC SUBMERSIBLE PUMP 通过比较人工抬气升力和电动泵的升力,改善EC-6井的生产
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V8I1.4289
Jonathan Jonathan, Sisworini Sisworini, Samsol Samsol, Hari Karyadi Oetomo
{"title":"OPTIMASI PRODUKSI SUMUR EC-6 DENGAN MEMBANDINGKAN PENGANGKATAN BUATAN GAS LIFT DAN ELECTRIC SUBMERSIBLE PUMP","authors":"Jonathan Jonathan, Sisworini Sisworini, Samsol Samsol, Hari Karyadi Oetomo","doi":"10.25105/PETRO.V8I1.4289","DOIUrl":"https://doi.org/10.25105/PETRO.V8I1.4289","url":null,"abstract":"In the world of oil is very common in the production system. This production system produces oil from wells after drilling and well compressions. Over time, the production of a well may decrease due to several parameters of pressure drop and the presence of clay which makes the pipe diameter narrower. There are several methods used to increase the decrease in production including adding artificial lifts such as sucker rod pump, electric submersible pump and gas lift, reservoir stimulation and pipe cleaning if the pipe diameter is reduced due to clay. The well has been installed an artificial lift is a gas lift and this well need an optimization to increase its production. The EC-6 well optimization is planned by comparing the lift-up scenario of the gas lift by adjusting the rate of gas injection and deepening the orifice injection and also an installation of electrical submersible pump. Best percentage of optimization production from EC-6 Well, last scenario is chosen which is new installation artificial lift ESP from gas lift (existing) and gaining 18.52% form existing production","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"259 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"75391751","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PERHITUNGAN POTENSI CADANGAN PANASBUMI LAPANGAN “X” MENGGUNAKAN DATA EKSPLORASI 利用勘探数据计算可能的地热储备
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V8I1.4291
Syahda Ahyar Habibirahman, Lestari Lestari, Bambang Kustono
{"title":"PERHITUNGAN POTENSI CADANGAN PANASBUMI LAPANGAN “X” MENGGUNAKAN DATA EKSPLORASI","authors":"Syahda Ahyar Habibirahman, Lestari Lestari, Bambang Kustono","doi":"10.25105/PETRO.V8I1.4291","DOIUrl":"https://doi.org/10.25105/PETRO.V8I1.4291","url":null,"abstract":"<p><em>The method used in this reserve estimation is volumetric, regulated by Badan Standar Nasional Indonesia (BSNI) (SNI 13-6482-2000). This method considers that the reservoir is a form of dimensional space so that its volume can be measured. This type of method can also be used in reserve classes ranging from hypothetical resources up to proven reserves, with parameters used in this calculation obtained through assumptions and those that are the result of preliminary survey activities, which consist of geological (MT maps), geophysics (MT maps), and geochemistry (geothermometer) surveys. Data obtained from preliminary survey activities contains data on thickness, area, and temperature of the reservoir. Other parameters that have not been obtained from preliminary survey activities, such as rock porosity and heat capacity, final temperature, water and steam saturation, internal energy of water and steam, water and steam density, recovery factor, load factor and span and are based on assumptions compiled by BSNI (SNI 13-6482-2000). In addition of using volumetric methods, calculations are also performed using the Monte Carlo simulation method. This method uses random numbers as uncertainty factors in some parameters that have been obtained from the preliminary survey as mentioned above, with the type of distribution determined based on calculation parameters..</em></p><p><em> </em></p><p><em>With </em><em>the</em><em> reservoir temperature of 220<sup>o</sup>C, area of 7.4 km<sup>2</sup></em><em>, & </em><em>thickness </em><em>reaches</em><em> 1550 m, the potential for geothermal reserve at \"X\" Field based on the volumetric method is 36.90 MWe. Meanwhile, using the Monte Carlo simulation method, the potential reserves at a 90% confidence level are around 47.93 MWe: </em><em>which</em><em> ha</em><em>s</em><em> </em><em>the </em><em>the most likely reservoir temperature of 220</em><em><sup>o</sup></em><em>C with </em><em>the</em><em> range of values </em><em>varies </em><em>around 200-225<sup>o</sup>C, reservoir area with the most likely value is 7.5 km<sup>2</sup> </em><em>ranging from</em><em> 4-11 km<sup>2</sup>, and the most likely</em><em> </em><em>thickness </em><em>value is</em><em> 1550 m with 1200-1700 m for the minimum and maximum values.</em><em>T</em><em>he calculation results of the geothermal energy reserve potential in the \"X\" Field are 36.90 MWe </em><em>using</em><em> volumetric method and 47.93 for Monte Carlo simulation method</em><em>.</em></p>","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"357 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"76502247","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
EVALUASI NILAI CUTTING CARRYING INDEX PADA LUMPUR DIESEL OIL 评价了吉隆坡柴油的耐油切削承载指数
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V7I4.4281
Kevin Ariko Yuwandhika, Bayu Satiyawira, Apriyandi Rizki
{"title":"EVALUASI NILAI CUTTING CARRYING INDEX PADA LUMPUR DIESEL OIL","authors":"Kevin Ariko Yuwandhika, Bayu Satiyawira, Apriyandi Rizki","doi":"10.25105/PETRO.V7I4.4281","DOIUrl":"https://doi.org/10.25105/PETRO.V7I4.4281","url":null,"abstract":"Evaluation of Cutting Carrying Index when using Diesel Oil base mud in well T is carried out on section 12-1 / 4 \", 8-1 / 2\", and 5-3/4 \". This is because the use of mud on the previous section did not use Diesel Oil base mud, but only used native mud and KCL Polymer base mud. In the CCI evaluation of the Diesel Oil mud, several parameters included, Equivalent Circulating Density and rheology of diesel oil base mud. Based on the primary data on well T the ECD calculation can be done by calculating the average annulus velocity, velocity critical around annulus hole, and the  pressure loss in it. The value of ECD obtained on section 12-1 / 4 \"ranges from 14 ppg to 15 ppg, section  8-1/2”  has 16,08 ppg to 16,4 ppg, and section 5-3 / 4\" reaching 14,72 ppg as the biggest value. Based on the ECD, CCI value is obtained, this is because the ECD value describes the mud weight around the annulus hole. A good CCI value must be greater than or equal to 1, then evaluated with the results of CCI on route 12-1 / 4 \"obtaining the greatest CCI value 1.6 in the jar and drill collar I. On route 8-1 / 2\", CCI value evaluated in the heavyweight drill pipe section with a change in the value of 0,76 to 1,08. The CCI value on section 5-3 / 4“ changes in value from 0,65 to 1,19 in heavyweight drill pipe section.","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"18 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84325247","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
PENGARUH TEMPERATUR TERHADAP SIFAT FISIK SISTEM LOW SOLID MUD DENGAN PENAMBAHAN ADITIF BIOPOLIMER DAN BENTONITE EXTENDER 温度对低固态泥浆系统的物理特性的影响,该系统添加了生物聚合物添加剂和试剂
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V7I4.4282
Bayu Satiyawira
{"title":"PENGARUH TEMPERATUR TERHADAP SIFAT FISIK SISTEM LOW SOLID MUD DENGAN PENAMBAHAN ADITIF BIOPOLIMER DAN BENTONITE EXTENDER","authors":"Bayu Satiyawira","doi":"10.25105/PETRO.V7I4.4282","DOIUrl":"https://doi.org/10.25105/PETRO.V7I4.4282","url":null,"abstract":"Lumpur pemboran merupakan bagian yang sangat penting di dalam suatu kegiatan pemboran. Pemboran dapat berjalan dengan lancar, aman, dan ekonomis sangat dipengaruhi oleh kondisi dan sistem lumpur pemboran yang digunakan. Kondisi yang dimaksud adalah sistem lumpur dan sifat fisik lumpur tersebut sesuai dengan spesifikasi yang dibutuhkan dan mengetahui pengaruh berbagai temperatur terhadap sifat-sifat fisik low solid mud (low solid mud) dengan penambahan aditif biopolimer dan bentonite extender. Pengamatan hasil laboratorium menggunakan alat roller oven sebagai media untuk simulasi mengkondisikan lumpur seakan-akan berada di dalam sumur untuk melihat perubahan sifat fisik lumpur pada berbagai temperatur, hasil uji laboratorium menunjukkan  dengan kenaikan temperature pengujian maka sifat fisik lumpur pemboran seperti densitas, viskositas, Plastic Viscosity, Yield Point, Dial Reading 600 RPM, Dial Reading 300 RPM, dan Gel Strength mengalami perubahan nilai pengukuran mengikuti perubahan temperatur","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"22 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84988989","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
ANALISIS PENGARUH INJEKSI CO2 TERHADAP RECOVERY FACTOR MENGGUNAKAN SIMULASI CMG DI LAPANGAN X
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V8I1.4292
Vera Fernanda, Mulia Ginting, Prayang Sunny Yulia
{"title":"ANALISIS PENGARUH INJEKSI CO2 TERHADAP RECOVERY FACTOR MENGGUNAKAN SIMULASI CMG DI LAPANGAN X","authors":"Vera Fernanda, Mulia Ginting, Prayang Sunny Yulia","doi":"10.25105/PETRO.V8I1.4292","DOIUrl":"https://doi.org/10.25105/PETRO.V8I1.4292","url":null,"abstract":"X-Field is located in South Sumatra, where there are several gas fields with considerable CO2 gas potential. In this field, no research has been conducted on CO2 injection neither in the laboratory nor simulation. Therefore, the purpose of this study is to analyze the effect of CO2 injection on the value of recovery factor with one-dimensional simulation using CMG. To be able to make an accurate simulation model, it is necessary to do validation by comparing the results obtained with the CO2 injection test from experiments in the laboratory. Laboratory experimental data used in this study is from Vulin’s literature. The result of recovery factor for X-field is 98.80%. From the results of this study, it is known that the injection rate of CO2 has no effect on changes in recovery factor. However, the difference of CO2 injection pressure in these two samples influences the change in recovery factor. The higher injection pressure of CO2 in an immiscible condition is, the higher the value of the recovery factor is achieved. In addition, the difference in oil composition in these two samples affects the value of MMP, where the higher the intermediate component of a reservoir fluid is, the lower the MMP will be. X-field has a high intermediate component fraction, therefore the value of MMP obtained is lower than the MMP from Vulin’s literature. The value of MMP in X-field is 2610.68 psia","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"32 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87979427","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS KEEKONOMIAN PROYEK GAS-TO-LIQUID SEBAGAI ALTERNATIF PEMANFAATAN CADANGAN GAS ALAM INDONESIA 天然气对液体项目的经济学分析,作为印尼天然气储备的替代品
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V7I4.4287
Muh Thahir, Dwi Atty Mardiana
{"title":"ANALISIS KEEKONOMIAN PROYEK GAS-TO-LIQUID SEBAGAI ALTERNATIF PEMANFAATAN CADANGAN GAS ALAM INDONESIA","authors":"Muh Thahir, Dwi Atty Mardiana","doi":"10.25105/PETRO.V7I4.4287","DOIUrl":"https://doi.org/10.25105/PETRO.V7I4.4287","url":null,"abstract":"The reservoir on Field A that has an estimated large reserve of natural gas of 10,73 TSCF would have a potential economic value when developed correctly. The natural gas reserve is planned to be extracted by utilizing 18 subsea production wells connected to five subsea manifolds at a depth of 300 ‒ 1000 m at below sea level. Gas production will be done by using FPSO. Produced gas then will be pumped to onshore processing facilities on Yamdena island through undersea pipeline that used corrosion resistant alloy as long as up to 100 km in length. The natural gas processing would either be done by building an LNG facility scenario or building a GTL facility scenario on Yamdena island. The LNG scenario would produce the natural gas into LNG and gas condensate. While the GTL scenario would produce the natural gas as a synthetic liquid fuel such as LPG, naphtha, kerosene, and diesel. The feed gas volume used on both scenarios is assumed to be 1.041 MMSCFD. The economic indicator calculated for GTL yields an NPV of 1.743,44 MMUS$ and for LNG yields 1.940,51 MMUS$. The IRR calculated for GTL yields 13,27% and for LNG yields 13,14%. The POT period calculated from cummulative cash inflow for GTL scenario will take 9,84 years time, while on LNG scenario POT will take 9,90 years time. The PI value calculated for GTL scenario yields a value of 1,46 and for LNG scenario yields a value of 1,44. Results from sensitivity analyses on economic indicator found that the parameters which has significant effect on the change of economic indicator values are product sell price.","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"92 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86270804","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
STUDI LABORATORIUM PENGARUH PENAMBAHAN POLIMER SINTESIS DAN TEPUNG SAGU TERHADAP SIFAT RHEOLOGY LUMPUR AIR ASIN SISTEM DISPERSI PADA BERBAGAI TEMPERATUR 实验室研究了在不同温度下加入合成聚合物和小粉对咸水泥浆分散性系统的影响
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V7I4.4286
Randy Mahaputra Ginting
{"title":"STUDI LABORATORIUM PENGARUH PENAMBAHAN POLIMER SINTESIS DAN TEPUNG SAGU TERHADAP SIFAT RHEOLOGY LUMPUR AIR ASIN SISTEM DISPERSI PADA BERBAGAI TEMPERATUR","authors":"Randy Mahaputra Ginting","doi":"10.25105/PETRO.V7I4.4286","DOIUrl":"https://doi.org/10.25105/PETRO.V7I4.4286","url":null,"abstract":"Drilling is one of the important things in the drilling process, from the start of drilling to the point of reaching the intended depth, can assist the smooth process of drilling. The potential problems that can arise one of them is the drilling mud reply (loss of circulation). One way to prevent and cope with the discovery of drilling mud is dissolved. At this time Polymers Synthesis and Sago Flour as material for dissolved system. Both materials enter into the colloidal effect. The colloid solution itself is a relatively large, relatively large dispersion system within the dispersing medium.The purpose and objective in collecting these tasks is to determine the effectiveness of Synthetic and Sago Flour Polymer materials in tackling the drilling mud stock problem. Based on the results of the research found, that A sludge system can provide most of the standard specification where the value of physical properties and rheology. While the B sludge system is inversely proportional, most of it does not meet the standard specification. It can be underlined that B system with Sago Flour as LCM is effective in handling dispersion drilling mud.","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"1 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87499809","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS METODE CASING WHILE DRILLING UNTUK SETTING CASING 16” PADA SUMUR C2 钻进时分析方法套管,并下入16”帕达2号套管
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V7I4.4284
Bobby Rifki Saputra, Asri Nugrahanti, Rizki Akbar
{"title":"ANALISIS METODE CASING WHILE DRILLING UNTUK SETTING CASING 16” PADA SUMUR C2","authors":"Bobby Rifki Saputra, Asri Nugrahanti, Rizki Akbar","doi":"10.25105/PETRO.V7I4.4284","DOIUrl":"https://doi.org/10.25105/PETRO.V7I4.4284","url":null,"abstract":"C2 well is an exploration well located in south sumatera area managed by PT. MEPI in planned CSS field will be drilled to a depth of 12.000 ftTVD vertically. Planning the use of casing while drilling is done by using 16\" protective casing on the trajectory 17-1/2\" from a depth of 1.500 ft to 4.600 ft. The use of casing while drilling (CWD), is expected by using the casing as drillstring, then the clearance between the boreholes wall with the OD casing becomes small which will cause the event \"Plastering Effect\". This phenomenon is expected to isolate the wall of the drill hole which is easy to happen lost circulation. On vertical wells only need a casing method while drilling level-2 (non-retrievable) because at level-2 only casing with bits (drillshoe) only, where drillshoe will be left in the shoe casing. From the analysis results can be said on well C2 can be applied casing method while drilling because in terms of hydraulics drilling which the drill hole clearance with horsepower square inch method (HSI) and cutting lift based on cutting carrying index (CCI) is good, but for mechanics drilling needs to be considered torque, drag, and buckling loads. In terms of torque loads MLT Rings should be installed for 16” protective casing, from drag loads where the 2.000 HP rig can withstand maximum load of hookload, and 16\" protective casing might not occur buckling as the maximum weight on bit (WOB) is still under critical buckling load.","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"64 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"91443746","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PENGARUH SCALE TERHADAP PRODUKTIVITAS PADA SUMUR BN-52, BN-104, DAN BN-110 DI LAPANGAN “X” 在“X”场中,SCALE对生产力的影响是:BN-52、BN-104和BN-110
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V8I1.4290
Abhikama Pradipta, Lestari Lestari, Samsol Samsol
{"title":"PENGARUH SCALE TERHADAP PRODUKTIVITAS PADA SUMUR BN-52, BN-104, DAN BN-110 DI LAPANGAN “X”","authors":"Abhikama Pradipta, Lestari Lestari, Samsol Samsol","doi":"10.25105/PETRO.V8I1.4290","DOIUrl":"https://doi.org/10.25105/PETRO.V8I1.4290","url":null,"abstract":"BN-52, BN-104, and BN-110 wells are located on the X field, PT. PERTAMINA FIELD RAMBA ASSET 1, South Sumatra. The three wells are oil-producing wells in field X. Using the Vogel equation, the IPR curve and maximum flow rate of each well are obtained, which are 152.14 BOPD, 57.2 BOPD, and 53.76 BOPD respectively. By using the exponential Decline Curve Analysis calculation method, it can be seen the rate of decline in production, as well as the time of well production to economic limit. The results of the Decline Curve Analysis show that the BN-52 well will still be in production until March 2022, and the BN-110 well can produce until March 2020. In the analysis with the Stiff & Davis Method, carbonate deposits are proven, with each Stability Index value  +1.19, +1.60, and +1.35, whereas with the Skillman, Mcdonald & Stiff method there was no scale sulfate, with S values of each well at 57,272 meq / l, 54,416 meq / l, and 55,147 meq / l. The scale causes oil production to decrease, consequently the IPR curve shifts to the left. The decreasing production of the three wells is due to a scale that inhibits the flow rate. Maximum flow rate was obtained by using the Standing correlation in each well of 100.06 BOPD, 54.53 BOPD, and 28.72 BOPD. The decline in oil production caused by scales must be handled appropriately.","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"35 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86757206","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
EVALUASI PENYEBAB HILANG SIRKULASI LUMPUR DAN PENANGGULANGANNYA PADA PEMBORAN SUMUR-SUMUR LAPANGAN MINYAK “X” 评估淤泥循环的原因,并对油田X井的选择进行研究
PETRO Pub Date : 2019-04-20 DOI: 10.25105/PETRO.V7I4.4283
Bayu Satiyawira, Galih Imanurdana
{"title":"EVALUASI PENYEBAB HILANG SIRKULASI LUMPUR DAN PENANGGULANGANNYA PADA PEMBORAN SUMUR-SUMUR LAPANGAN MINYAK “X”","authors":"Bayu Satiyawira, Galih Imanurdana","doi":"10.25105/PETRO.V7I4.4283","DOIUrl":"https://doi.org/10.25105/PETRO.V7I4.4283","url":null,"abstract":"<p>Pada pemboran di lapangan minyak “X” terjadi permasalahan hilang sirkulasi lumpur (<em>lost circulation</em>). <em>Lost circulation </em>adalah hilangnya sebagian (<em>partial lost</em>) atau semua (<em>total lost</em>) dari fluida pemboran ke dalam formasi. Pada pemboran sumur Adan Bterjadi permasalahan <em>lost circulation</em> ketika pemboran menembus formasi Baturaja dengan lithologi batuan <em>limestone </em>dan sumur Cterjadi permasalahan <em>lost circulation</em> ketika pemboran menembus formasi Baturaja  dengan lithologi <em>limestone </em>dan formasi Talangakar dengan lithologi 90% <em>limestone </em>dan 10% <em>sandstone. </em> Penyebab dari permasalahan <em>lost circulation</em> karena formasi yang memiliki lubang pori yang cukup besar sehingga terbentuk rongga-rongga atau terbentuk gua (<em>cavern</em>).</p><p>Dengan permasalahan <em>lost circulation </em>ini maka dilakukan penanggulangan pada tiap-tiap sumur A, B, dan C dengan menggunakan beberapa metode. Pada sumur Apenanggulangan dilakukan dengan <em>Lost Circulation Material </em>(LCM) CaCO<sub>3</sub> dan dilakukan penyemenan. Sumur Bini penangganan <em>lost circulation </em>dengan LCM CaCO<sub>3</sub> dan <em>blind drilling.</em> Sedangkan pada sumur Cpenangganan dilakukan dengan menggunakan LCM CaCO<sub>3.</sub></p><p>Penanggulangan masalah hilang sirkulasi lumpur yang telah dilakukan pada sumur A, B, dan  sumur Cpada tiap zona <em>loss </em>secara keseluruhan telah dilakukan dengan baik dan pemboran tiap sumur di lapangan minyak “X” tercapai hingga kedalaman sesuai target yang diinginkan.</p><p> </p>","PeriodicalId":20017,"journal":{"name":"PETRO","volume":"153 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"74693093","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信