Mineral Resources Engineering最新文献

筛选
英文 中文
A KNOWLEDGE-BASED APPROACH TO MINE VENTILATION PLANNING IN YUGOSLAV MINING PRACTICE 南斯拉夫采矿实践中基于知识的矿井通风规划方法
Mineral Resources Engineering Pub Date : 2002-12-01 DOI: 10.1142/S0950609802001014
N. Lilic, I. Obradovic, R. Stanković
{"title":"A KNOWLEDGE-BASED APPROACH TO MINE VENTILATION PLANNING IN YUGOSLAV MINING PRACTICE","authors":"N. Lilic, I. Obradovic, R. Stanković","doi":"10.1142/S0950609802001014","DOIUrl":"https://doi.org/10.1142/S0950609802001014","url":null,"abstract":"Ventilation system analysis is a complex process based on the calculation and analysis of numerous parameters. These problems can be successfully solved by the SimVent numerical package, but a full understanding and use of the obtained results require the involvement of an experienced specialist in the ventilation field. The solution was found in the creation of a hybrid system INVENTS, whose knowledge base represents a formalization of the expert knowledge in the mine ventilation field. In this paper, we present the design methodology of the hybrid system INVENTS, as well as system structure and user interface.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124869712","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
SWOTS ANALYSIS OF GLOBAL MINING ENGINEERING EDUCATION 全球矿业工程教育的swot分析
Mineral Resources Engineering Pub Date : 2002-12-01 DOI: 10.1142/S0950609802001026
J. Bhattacharya, D. Deb
{"title":"SWOTS ANALYSIS OF GLOBAL MINING ENGINEERING EDUCATION","authors":"J. Bhattacharya, D. Deb","doi":"10.1142/S0950609802001026","DOIUrl":"https://doi.org/10.1142/S0950609802001026","url":null,"abstract":"The paper provides a strength, weakness, opportunity, threats and strategies (SWOTS) analysis of the current state of mining education. The paper is pointed at developing the mining courses in the future so that they become acceptable, attractive and sustainable to the students. It would nonetheless need a change in the outlook of the industry. It is also urged to remove the word \"abandonment\" from the mining lexicon.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115784480","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
ASSESSING GLOBAL LAND REQUIREMENT FOR SURFACE COPPER MINING 评估地表铜矿开采的全球土地需求
Mineral Resources Engineering Pub Date : 2002-12-01 DOI: 10.1142/S095060980200104X
P. N. Martens, M. Ruhrberg, M. Mistry
{"title":"ASSESSING GLOBAL LAND REQUIREMENT FOR SURFACE COPPER MINING","authors":"P. N. Martens, M. Ruhrberg, M. Mistry","doi":"10.1142/S095060980200104X","DOIUrl":"https://doi.org/10.1142/S095060980200104X","url":null,"abstract":"Most available LCA-tools and databases still lack reliable information on the extent of land used for processing and supplying raw materials like minerals and metals. The amount of land disturbed by facilitating these resources which are of vital interest for the development of every modern society can be used as a key indicator for a number of sustainable development issues associated with a mining activity. In this work, a new methodical approach for estimating land requirement for surface copper mining operations is introduced. For the reference year 1998; facts and figures concerning global land requirement for surface copper mining operations are presented. The work closes with a short discussion and gives an outlook to forthcoming research.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"34 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126616824","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
A REVISED FORM OF THE BERGMARK-ROOS EQUATION FOR DESCRIBING THE GRAVITY FLOW OF BROKEN ROCK 描述破碎岩石重力流的伯格马克-鲁斯方程的修正形式
Mineral Resources Engineering Pub Date : 2002-12-01 DOI: 10.1142/S0950609802001002
M. Kuchta
{"title":"A REVISED FORM OF THE BERGMARK-ROOS EQUATION FOR DESCRIBING THE GRAVITY FLOW OF BROKEN ROCK","authors":"M. Kuchta","doi":"10.1142/S0950609802001002","DOIUrl":"https://doi.org/10.1142/S0950609802001002","url":null,"abstract":"The proper design of underground mines using caving methods such as block caving or sublevel caving requires a good understanding of how broken rock flows under the influence of gravity. To date, the mathematical equation that best describes the shape of the extraction drawbody is given by the Bergmark-Roos Equation. The derivation of the Bergmark-Roos Equation is reviewed and a revised version of the equation is developed which accounts for a non-zero opening width. Equations for the area, volume, and maximum width of the drawbody for a given extraction height are developed for both the original and modified forms of the Bergmark-Roos Equation. The equations derived can be used to evaluate existing mine layouts as well as in the design of new mining geometries.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"60 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116971811","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 29
PREDICTABILITY OF THE GROUND VIBRATION PARAMETERS INDUCED BY BLASTING DURING THE TUNNELING 开挖过程中爆破引起的地面振动参数的可预测性
Mineral Resources Engineering Pub Date : 2002-09-01 DOI: 10.1142/S0950609802000987
A. Kahriman
{"title":"PREDICTABILITY OF THE GROUND VIBRATION PARAMETERS INDUCED BY BLASTING DURING THE TUNNELING","authors":"A. Kahriman","doi":"10.1142/S0950609802000987","DOIUrl":"https://doi.org/10.1142/S0950609802000987","url":null,"abstract":"Although many research studies were carried out in the past to eliminate environmental issues produced from blasting, unfortunately a general approach or formula has not been established yet due to the complexity of the matter. In addition to the wave and ground motion characteristics, the complexity of blasting parameters and site factors restrict the development of a general criterion. Therefore, experimental site-specific studies should still be done for predicting and controlling the blasting effects. This paper presents the results of ground vibration measurements induced by blasting, which were performed during the tunneling for Istanbul Subway. Within the scope of the study, ground vibration components were measured for all blast events using 4 different types of vibration monitors during the advancement of about 300 m length of the tunnels which required blasting over a long period, for the estimation of the peak particle velocity, and to determine the slope of the attenuation curve together with the maximum charge per delay for the test site. At the end of the statistical analysis of the data pairs, a final relation is developed between particle velocity and scaled distance.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133440973","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Modelling Failure Pattern of a Mining Truck with a Decision Tree Algorithm 基于决策树算法的矿用卡车故障模式建模
Mineral Resources Engineering Pub Date : 2002-09-01 DOI: 10.1142/S0950609802000975
Hui-Ling Hu, T. Golosinski
{"title":"Modelling Failure Pattern of a Mining Truck with a Decision Tree Algorithm","authors":"Hui-Ling Hu, T. Golosinski","doi":"10.1142/S0950609802000975","DOIUrl":"https://doi.org/10.1142/S0950609802000975","url":null,"abstract":"This paper reports on the development of failure pattern recognition model for a mining truck. The model inputs, VIMS data collected in a mine, were processed using one of the Decision Tree algorithms, a module of the Intelligent Miner for Data software of IBM. The results indicate that the Decision Tree allows for identification and quantification of relations between the various types of VIMS data. As such, it can be used for development of a model that would allow prognosticating truck condition and performance. Full development of this capacity requires further research.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"79 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116095474","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
A BRIEF OVERVIEW OF ROMANIAN MINING LEGISLATION 罗马尼亚采矿立法的简要概述
Mineral Resources Engineering Pub Date : 2002-09-01 DOI: 10.1142/S0950609802000951
Andra Oana Musatescu
{"title":"A BRIEF OVERVIEW OF ROMANIAN MINING LEGISLATION","authors":"Andra Oana Musatescu","doi":"10.1142/S0950609802000951","DOIUrl":"https://doi.org/10.1142/S0950609802000951","url":null,"abstract":"","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121704447","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
INFLUENCE OF ADMIXTURES ON CEMENTED BACKFILL STRENGTH 外加剂对胶结充填体强度的影响
Mineral Resources Engineering Pub Date : 2002-09-01 DOI: 10.1142/S0950609802000963
C. Wang, D. Tannant, A. Padrutt, D. Millette
{"title":"INFLUENCE OF ADMIXTURES ON CEMENTED BACKFILL STRENGTH","authors":"C. Wang, D. Tannant, A. Padrutt, D. Millette","doi":"10.1142/S0950609802000963","DOIUrl":"https://doi.org/10.1142/S0950609802000963","url":null,"abstract":"This paper presents laboratory test results showing the influence of cement admixtures on the compressive strength of three types of cemented backfill: cemented aggregate fill (CAF), cemented hydraulic fill (CHF) and cemented paste fill (CPF). These results can be used to select the admixture dosage to achieve a desired compressive strength of a cemented backfill. Considerations when using an admixture are also given.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"136 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133869697","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
A NEW DIMENSION TO STUDIES OF SPONTANEOUS COMBUSTION OF COAL 煤自燃研究的新维度
Mineral Resources Engineering Pub Date : 2002-06-01 DOI: 10.1142/S0950609802000938
R. N. Singh, J. Shonhardt, N. Terezopoulos
{"title":"A NEW DIMENSION TO STUDIES OF SPONTANEOUS COMBUSTION OF COAL","authors":"R. N. Singh, J. Shonhardt, N. Terezopoulos","doi":"10.1142/S0950609802000938","DOIUrl":"https://doi.org/10.1142/S0950609802000938","url":null,"abstract":"Spontaneous combustion of coal is a hazard frequently encountered in coal mining. It has been researched extensively but the actual mechanism by which it occurs is not completely understood. Under suitable conditions, the spontaneous combustion hazard manifests itself in all major aspects of coal mining, namely, underground coal mining, surface mining, stockpiling of coal at the pithead, power stations and ports, during sea-borne transport and stacking of reject material. In underground coal mining, the most difficult situation occurs when spontaneous combustion takes place in the presence of an inherently explosive atmosphere which may promote a local spontaneous combustion incident into an explosion hazard involving the entire mine. Such an incident at the Moura mine in Central Queensland resulted in greater pressure on mine operators for the safe management of spontaneous combustion in their underground coal mines than ever before. As not all coal mines are equally liable to spontaneous combustion due to the different propensities of different coals to self-oxidation, the risk assessment for spontaneous combustion is a primary requirement for the development of a spontaneous combustion management plan for a mine. Once the coal seam has been classified into various categories of spontaneous combustion risk, it is necessary to determine a fire ladder for the coal seam. This should be followed by detailed planning of the mine layout including the mine ventilation system and a spontaneous combustion monitoring program before devising a spontaneous combustion management plan as required by the Coal Mines Underground Regulations 1999. In this paper, a case history is presented which includes the development of a spontaneous combustion management plan for a high-risk coal seam in a greenfield site, from the risk assessment stage to the outbreak stage of a spontaneous combustion incident. It is concluded that the risk assessment, evaluation of the fire ladder, comprehensive monitoring by a tube bundle system and trending of carbon monoxide/oxygen deficiency ratio (Graham's ratio) and CO levels were the main elements in an effective spontaneous combustion control system for the mine.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130212167","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 21
UNDERGROUND MINE DESIGN AND PLANNING: COMPLEXITY AND INTERDEPENDENCIES 地下矿山设计与规划:复杂性与相互依赖性
Mineral Resources Engineering Pub Date : 2002-06-01 DOI: 10.1142/S0950609802000914
M. Morin
{"title":"UNDERGROUND MINE DESIGN AND PLANNING: COMPLEXITY AND INTERDEPENDENCIES","authors":"M. Morin","doi":"10.1142/S0950609802000914","DOIUrl":"https://doi.org/10.1142/S0950609802000914","url":null,"abstract":"Mine design and planning is a very complex, iterative process comprising several interrelated and interdependent factors and considerations. This paper examines visually some of the more important factors and considerations and how they can have a far-reaching influence on the mine design and planning process. Knowing these factors can lead to better decision-making by ensuring that all critical elements are considered. This can be especially important when transforming design and planning knowledge and experience into expert systems to aid mine designers and planners.","PeriodicalId":195550,"journal":{"name":"Mineral Resources Engineering","volume":"35 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2002-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133009280","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信