Proceedings of the Creative Construction Conference 2023最新文献

筛选
英文 中文
INNOVATIVE TOOLS FOR BETTER USE OF KNOWLEDGE IN FACILITY MANAGEMENT FOR CONSTRUCTION 创新的工具,以更好地利用知识的设施管理的建设
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-045
Dilan Durmuş, A. Giretti, A. Carbonari, Žiga Turk
{"title":"INNOVATIVE TOOLS FOR BETTER USE OF KNOWLEDGE IN FACILITY MANAGEMENT FOR CONSTRUCTION","authors":"Dilan Durmuş, A. Giretti, A. Carbonari, Žiga Turk","doi":"10.3311/ccc2023-045","DOIUrl":"https://doi.org/10.3311/ccc2023-045","url":null,"abstract":"","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126150381","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A DESCRIPTIVE DIGITAL TWIN TO SUPPORT FACILITY MAINTENANCE 支持设施维护的描述性数字孪生
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-023
A. Yanamala, A. Harode, W. Thabet
{"title":"A DESCRIPTIVE DIGITAL TWIN TO SUPPORT FACILITY MAINTENANCE","authors":"A. Yanamala, A. Harode, W. Thabet","doi":"10.3311/ccc2023-023","DOIUrl":"https://doi.org/10.3311/ccc2023-023","url":null,"abstract":"","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115583463","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
EXPERIENCES OF COUNTRIES WITH THE ADOPTION OF THE BIM-BASED PERMIT PROCESS 各国采用以他为基础的许可证程序的经验
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-039
Mirjana Terzić, Igor Peško, Milena Senjak Pejić, Vladimir Mučenski, D. Stanojević
{"title":"EXPERIENCES OF COUNTRIES WITH THE ADOPTION OF THE BIM-BASED PERMIT PROCESS","authors":"Mirjana Terzić, Igor Peško, Milena Senjak Pejić, Vladimir Mučenski, D. Stanojević","doi":"10.3311/ccc2023-039","DOIUrl":"https://doi.org/10.3311/ccc2023-039","url":null,"abstract":"Construction projects are revolutionized by the introduction of Building Information Modelling (BIM) in the construction industry. It changed the way projects are managed and executed as a collaborative approach to building design, construction, and management. A relatively new concept that has been adopted in several countries around the world is the BIM-based permit process. This process involves the use of BIM technology to optimize the permit process for construction projects. The traditional process of obtaining a building permit involves multiple stakeholders and numerous steps and is often handled using paper documents or digital file submissions. Inefficient building permit procedures are considered time-consuming and prone to errors. Additionally, the demand for building permits has increased due to rapid urbanization, placing more significant pressure on regulatory authorities. This paper presents an analysis of the experiences of countries where the BIM-based permit process has been implemented: Singapore, Norway, Estonia, Finland and Netherland. Reviewing the existing literature and case studies, the advantages and challenges of this method are presented. The benefits identified include increased efficiency, improved accuracy, and reduced costs and delays in the permit process. However, there are many challenges, such as resistance to change and legal support. The paper also highlights the importance of government policies, stakeholder collaboration, and adequate training and education in successfully implementing the BIM-based permit process. The study concludes that the BIM-based permit process has the potential to improve the permit process for construction projects significantly, but its success depends on various factors.","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122390478","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
SENTIMENT ANALYSIS MODEL FOR PUBLIC CONSTRUCTION PROJECTS USING KOBERT 基于kobert的公共建设项目情感分析模型
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-048
Do Namgoong, Junhak Lee, S. Baek, Won Jin Woo, Changjun Lee, S. H. Han
{"title":"SENTIMENT ANALYSIS MODEL FOR PUBLIC CONSTRUCTION PROJECTS USING KOBERT","authors":"Do Namgoong, Junhak Lee, S. Baek, Won Jin Woo, Changjun Lee, S. H. Han","doi":"10.3311/ccc2023-048","DOIUrl":"https://doi.org/10.3311/ccc2023-048","url":null,"abstract":"","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128756839","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
CONCEPTUAL DESIGN USING BIM OF ULTRA-HIGH-SPEED CONSTRUCTION SYSTEM ASSUMING EMERGENCY SITUATIONS 利用bim对超高速施工系统进行应急方案设计
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-004
Kazuyoshi Endo, Masato Iwamura
{"title":"CONCEPTUAL DESIGN USING BIM OF ULTRA-HIGH-SPEED CONSTRUCTION SYSTEM ASSUMING EMERGENCY SITUATIONS","authors":"Kazuyoshi Endo, Masato Iwamura","doi":"10.3311/ccc2023-004","DOIUrl":"https://doi.org/10.3311/ccc2023-004","url":null,"abstract":"The Japanese construction production system has aimed to achieve a high degree of balance between high Q: quality, low C: cost, appropriate construction D: duration, S: safety assurance, and reduction of E: environmental impact in project results. Against the background of low economic growth and low interest rates after the bursting of the bubble economy, the Japanese client did not strongly demand \"UHSCS: ultra-high-speed construction system,\" which is the purpose of this research theme. However, if the QCSE satisfies the required standard, it is obvious that the introduction of UHSCS that realizes early recovery of funds will increase the value of the project. In addition, it goes without saying that reducing time, which is a parameter for amount of labor, material, and indirect costs, is effective in improving productivity, which the Japanese construction industry is currently working on. During the recent spread of COVID-19, those of us involved in construction watched helplessly as lives and health were lost due to the lack of medical facilities. In Wuhan city, China, a medical facility with 1,000 beds is said to have started operating 10 days after the site was prepared. In China, which is undergoing economic growth and has high financing costs, there was a strong need for UHSCS for hotels and offices. Based on the current situation, it is necessary to review UHSCS as another form of building production. The international architectural society has a social mission to prepare for the occurrence of similar pandemics and disasters such as earthquakes directly hitting the Tokyo metropolitan area that are predicted to occur in the future. This research utilizes the excellent construction elemental technology of Japanese industry, BIM, IoT, SCM and robotics, and presents a conceptual design of an UHSCS based on thorough standardization and labor-saving construction.","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"51 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128384954","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
MULTI-PARTY CONTRACTS IN THE VIEW OF SYSTEMS THEORY 系统理论视角下的多方契约
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-046
W. Eber
{"title":"MULTI-PARTY CONTRACTS IN THE VIEW OF SYSTEMS THEORY","authors":"W. Eber","doi":"10.3311/ccc2023-046","DOIUrl":"https://doi.org/10.3311/ccc2023-046","url":null,"abstract":"","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123979706","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
EVALUATION OF MODULAR CONSTRUCTION METHODS VERSUS TRADITIONAL CONSTRUCTION METHODS FOR ARMY CONSTRUCTION PROJECTS 军队建设项目模块化施工方法与传统施工方法的比较
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-037
M. Milliron, K. Rahn
{"title":"EVALUATION OF MODULAR CONSTRUCTION METHODS VERSUS TRADITIONAL CONSTRUCTION METHODS FOR ARMY CONSTRUCTION PROJECTS","authors":"M. Milliron, K. Rahn","doi":"10.3311/ccc2023-037","DOIUrl":"https://doi.org/10.3311/ccc2023-037","url":null,"abstract":"This research study focuses on examining the Army’s facility construction program during the fiscal years 2006 through 2013, known as Military Construction Transformation. For this program, the Army had goals to build better facilities, constructed faster and at less cost. To accomplish this, the Army gave contractors additional consideration for contract awards if the contractors proposed innovative design solutions, such as modular construction. This research examines construction costs, construction schedules, and maintenance records to determine if the Army’s goals were met. There were more than 7,000 maintenance records available, covering more than ten years for the facilities evaluated. The results of the data revealed that modular construction is not providing the durability and maintainability that the Army paid for when compared to conventional construction through comparative case studies. A recommendation was provided as well as considerations for future research. ©","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124365114","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
THE IMPORTANCE OF FEASIBILITY STUDY IN THE LAND SELECTION: EXAMPLE OF A RESIDENTIAL LAND 可行性研究在土地选择中的重要性——以某住宅用地为例
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-049
Gökçen Arslan, A. Kazaz, H. Esendal, Ender Yetim, Y. Inusah
{"title":"THE IMPORTANCE OF FEASIBILITY STUDY IN THE LAND SELECTION: EXAMPLE OF A RESIDENTIAL LAND","authors":"Gökçen Arslan, A. Kazaz, H. Esendal, Ender Yetim, Y. Inusah","doi":"10.3311/ccc2023-049","DOIUrl":"https://doi.org/10.3311/ccc2023-049","url":null,"abstract":"","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"21 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128163055","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
THE THEATRE METAPHOR FOR SPATIAL COMPUTING IN ARCHITECTURAL DESIGN 建筑设计中空间计算的剧场隐喻
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-087
B. Kovács, Ingrid Erb, Kiumars Sharifmoghaddam, Lukas Lipp, M. Wimmer, Peter Ferschin
{"title":"THE THEATRE METAPHOR FOR SPATIAL COMPUTING IN ARCHITECTURAL DESIGN","authors":"B. Kovács, Ingrid Erb, Kiumars Sharifmoghaddam, Lukas Lipp, M. Wimmer, Peter Ferschin","doi":"10.3311/ccc2023-087","DOIUrl":"https://doi.org/10.3311/ccc2023-087","url":null,"abstract":"New digital technologies require new conceptual approaches to help potential users understand existing and envision new use cases and applications. Moving from desktop computing to spatial computing (virtual, augmented, mixed and extended reality environments) also requires the introduction of new metaphors. New interaction and visualisation possibilities afforded by current devices are causing virtual and real worlds to merge into an inseparable unity of reality and imagination. There are many similarities between theatre and AEC workflows. However, the theatre process is scaled down in terms of space, time, and budget, and is therefore better suited to explore innovative and experimental methods. In order to conceptualise the role of a novel spatial computing drawing tool (MR.Sketch) in existing AEC processes, we propose the theatre metaphor, which embeds the conceptual foundations of the tool in a collaborative design workflow based on the cooperation of different domain experts. The metaphor proposal includes the analysis of the following theatre concepts: integrative collaboration with specialists, stage infrastructure, workshops for different tools and manufacturing methods, stocks and the immersive experience of space and time in different scales. We illustrate the capabilities of the theatre metaphor to cover the entire creation and performance process of architectural design in an experimental mixed reality sketching application. The implementation of an early prototype of the sketching application was used to evaluate the applicability of the theatre metaphor to spatial computing. ©","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133916887","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
IMPLEMENTATION OF WIRELESS AND SENSING TECHNOLOGIES IN HIGHWAY PROJECTS: A SWOT APPROACH 无线和传感技术在高速公路项目中的实施:swot方法
Proceedings of the Creative Construction Conference 2023 Pub Date : 1900-01-01 DOI: 10.3311/ccc2023-008
Bou Makram Hatoum, Ashtarout Ammar, H. Nassereddine, Amitabh Tripathi, G. Dadi, Roy E. Sturgill
{"title":"IMPLEMENTATION OF WIRELESS AND SENSING TECHNOLOGIES IN HIGHWAY PROJECTS: A SWOT APPROACH","authors":"Bou Makram Hatoum, Ashtarout Ammar, H. Nassereddine, Amitabh Tripathi, G. Dadi, Roy E. Sturgill","doi":"10.3311/ccc2023-008","DOIUrl":"https://doi.org/10.3311/ccc2023-008","url":null,"abstract":"The demand for safe, reliable, and higher-quality transportation and infrastructure systems often increases the complexity of constructing and maintaining highway projects and pressures Departments of Transportation (DOTs) to finish projects on tighter schedules and stricter budgets. Such complexities necessitate the use of technologies when constructing and maintaining transportation assets, notably wireless and sensing technologies. For the last few years, DOTs’ use of wireless and sensing technologies has been on the rise, with numerous research efforts aiming to explore applications and investigate case studies. Thus, this study buildings on the existing body of knowledge to develop a holistic Strengths Weaknesses Opportunities Threats (SWOT) framework that aims to comprehensively understand the implementation of eight wireless and sensing technologies in highway projects including barcodes and readers, Radio Frequency Identification (RFID), e-ticketing, Ground Penetrating Radar (GPR), Unmanned Aerial Systems (UAS) or Vehicles (UAV) or Drones, Light Detection and Ranging (LiDAR), Geographic Information System (GIS), and Global Positioning System or Global Navigation Satellite System (GNSS). The SWOT framework was developed via literature and then distributed via an online survey to subject matter experts in different DOTs. Results from the survey provided comprehensive insights into the strengths of using the technologies in the project's construction and asset management phases, the weaknesses that these technologies may face, the opportunities that they provide DOTs with, and the threats that the DOTs may need to overcome for successful implementation.","PeriodicalId":177185,"journal":{"name":"Proceedings of the Creative Construction Conference 2023","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132438364","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信