Journal of Entrepreneurship & Project Management最新文献

筛选
英文 中文
Health Project Implementation Processes and Performance Efficiency in Rwanda: A Case Study of the HIV Case Based Surveillance Program in Mayange Health Centre, Bugesera District 卢旺达的卫生项目实施过程和绩效效率:布格塞拉区马恩杰保健中心基于艾滋病毒病例的监测方案的案例研究
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-23 DOI: 10.53819/81018102t3089
{"title":"Health Project Implementation Processes and Performance Efficiency in Rwanda: A Case Study of the HIV Case Based Surveillance Program in Mayange Health Centre, Bugesera District","authors":"","doi":"10.53819/81018102t3089","DOIUrl":"https://doi.org/10.53819/81018102t3089","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117183830","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Beneficiaries Empowerment and Sustainability of Non-Governmental Organization Projects in Rwanda: A Case of Send a Cow Rwanda Jyambere Project 卢旺达非政府组织项目的受益人赋权和可持续性:以送一头牛卢旺达Jyambere项目为例
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-23 DOI: 10.53819/81018102t3090
Kanyesigye Rhoda Kadunguri, D. G. Njenga
{"title":"Beneficiaries Empowerment and Sustainability of Non-Governmental Organization Projects in Rwanda: A Case of Send a Cow Rwanda Jyambere Project","authors":"Kanyesigye Rhoda Kadunguri, D. G. Njenga","doi":"10.53819/81018102t3090","DOIUrl":"https://doi.org/10.53819/81018102t3090","url":null,"abstract":"This research analyzed how beneficiary empowerment affects the sustainability of NGO projects in Rwanda. The key characteristics that significantly help communities to empower themselves and promote sustainable development were discussed in detail and finally validated. More specifically, the study evaluated the impact of capacity building, material resources and partnerships on the sustainability of the Send a Cow Jyambere project in Rwanda. The study used descriptive research design with both quantitative and qualitative methods. The population of this study consisted of 5 technical project staff, 120 peer farmers and para-veterinaries and 1520 direct project beneficiaries. Thus, the total population was1645 individuals. Stratified random sampling was used to select 322 respondents as sample size. The survey used questionnaires and interviews to collect data. Descriptive and inferential analyses such as frequencies, percentages, correlations and regressions were used to present the quantitative data in tabular and graphical form using SPSS version 23. This study targeted to be of utmost importance to the researcher, future researchers, Mount Kenya University, the Jyambere project and the Rwandan society at large. The Pearson correlation analysis between capacity building (r=0.772, p=0.000), material resource (r=0.613, p=0.000) and partnership (r=0.631, p=0.000) against project sustainability showed that capacity building was found to have a positive and statistically significant correlation. The analysis of regression coefficients showed that capacity building (β1=0.511, p=0.000) material resource (β2=0.374 p=0.000) and partnership (β1=0.201, p=0.000) all have positive and statistically significant effect on project sustainability since the p-values are less than 5%. This study has empirically demonstrated that beneficiaries’ empowerment plays a significant role in ensuring that projects are sustainable. Therefore, the researcher recommends that project managers should embrace best practices that enhance beneficiaries’ empowerment such as incorporating capacity building, provide necessary material resources that equip beneficiaries ready to work by themselves as well as partnership with other parties. The government and the regulatory bodies should be keen to promote such projects which are community-based.","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115446053","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Project Risk Management Practices and Performance of Construction Projects: A Case of Horizon Construction in Kigali, Rwanda 项目风险管理实践与建设项目绩效:以卢旺达基加利地平线建设为例
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-16 DOI: 10.53819/81018102t2153
Janvier Hakizimana
{"title":"Project Risk Management Practices and Performance of Construction Projects: A Case of Horizon Construction in Kigali, Rwanda","authors":"Janvier Hakizimana","doi":"10.53819/81018102t2153","DOIUrl":"https://doi.org/10.53819/81018102t2153","url":null,"abstract":"The general objective was to examine the effect of project risk management on performance of construction of rehabilitation house construction in Kigali, Rwanda. The specific objectives were; to determine effect of project risk assessment, project risk base decision and project contingency decision on performance of commercial rehabilitation in Kigali. Working on that topic would provide a better way to large-scale construction projects. Other scholars who would be interested to work in the same field. The study used relevant theories such as risk management and risk assessment theories. This research used a descriptive study variables, indicators and measurement. A correlation study design was used to establish the association between variables and regression effect size for each specific objectives. The study targeted 180 staffs of Horizon Construction. A sample of 125 respondents determined using Yamane formula participated in the study process. The sample size was chosen using simple random and purposive sampling techniques. The study collected data using questionnaire and interview guide. The researcher study data using a computer based software known statistical product and service solutions to 26.0 to generate descriptive and inferential statistics. Qualitative data was analyzed using content analysis through themes and subthemes. Findings show","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129060475","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Procurement Practices and Public Projects Implementation in Rwanda: A Case of African Evangelist Enterprise 卢旺达的采购实践与公共项目实施:以非洲福音企业为例
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-16 DOI: 10.53819/81018102t2150
J. Mukashema
{"title":"Procurement Practices and Public Projects Implementation in Rwanda: A Case of African Evangelist Enterprise","authors":"J. Mukashema","doi":"10.53819/81018102t2150","DOIUrl":"https://doi.org/10.53819/81018102t2150","url":null,"abstract":"This study examined the role of procurement practices on public projects implementation in Rwanda using a case of African Evangelist Enterprise. The specific objectives were to determine the effect of procurement planning, professionalism","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116728358","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Operational Outsourcing Practices and Organizational Performance of Telecommunication Companies in Rwanda: A Case of Airtel Rwanda Plc 运营外包实践与卢旺达电信公司的组织绩效:以卢旺达Airtel公司为例
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-16 DOI: 10.53819/81018102t2151
Crepin Kirori
{"title":"Operational Outsourcing Practices and Organizational Performance of Telecommunication Companies in Rwanda: A Case of Airtel Rwanda Plc","authors":"Crepin Kirori","doi":"10.53819/81018102t2151","DOIUrl":"https://doi.org/10.53819/81018102t2151","url":null,"abstract":"Practices and Organizational Performance","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131332018","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Influence of Project Resources Management and Performance of Sustainable Agricultural Intensification and Food Security Project (SAIP) Rwanda 卢旺达可持续农业集约化和粮食安全项目(SAIP)项目资源管理与绩效的影响
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-15 DOI: 10.53819/81018102t5191
{"title":"Influence of Project Resources Management and Performance of Sustainable Agricultural Intensification and Food Security Project (SAIP) Rwanda","authors":"","doi":"10.53819/81018102t5191","DOIUrl":"https://doi.org/10.53819/81018102t5191","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"49 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115136582","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Factors Affecting Cost and Execution Period of Trail Bridge Construction Project in Nyamagabe District, Rwanda 影响卢旺达尼亚马加贝地区人行天桥建设项目成本及工期的因素
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-15 DOI: 10.53819/81018102t5192
{"title":"Factors Affecting Cost and Execution Period of Trail Bridge Construction Project in Nyamagabe District, Rwanda","authors":"","doi":"10.53819/81018102t5192","DOIUrl":"https://doi.org/10.53819/81018102t5192","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131383864","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Entrepreneurship Education and Entrepreneurial Intention: Case Study of Business Students in Tianjin, China 创业教育与创业意向:以天津市商科学生为例
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-15 DOI: 10.53819/81018102t5190
{"title":"Entrepreneurship Education and Entrepreneurial Intention: Case Study of Business Students in Tianjin, China","authors":"","doi":"10.53819/81018102t5190","DOIUrl":"https://doi.org/10.53819/81018102t5190","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"222 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128616790","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Outsourcing Practices and Organizational Performance in Rwanda: A Case of Ampersand Rwanda Ltd 卢旺达外包实践与组织绩效:以安培卢旺达有限公司为例
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-15 DOI: 10.53819/81018102t2149
Emma Stella Tuyisenge
{"title":"Outsourcing Practices and Organizational Performance in Rwanda: A Case of Ampersand Rwanda Ltd","authors":"Emma Stella Tuyisenge","doi":"10.53819/81018102t2149","DOIUrl":"https://doi.org/10.53819/81018102t2149","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129105367","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Determinants of Project Management Effectiveness and Performance on Public Projects in Rwanda: A Case of Three Stones International Rwanda 卢旺达公共项目项目管理有效性和绩效的决定因素:以三块石头国际卢旺达为例
Journal of Entrepreneurship & Project Management Pub Date : 2023-06-13 DOI: 10.53819/81018102t4156
Dusabirane Pierre
{"title":"Determinants of Project Management Effectiveness and Performance on Public Projects in Rwanda: A Case of Three Stones International Rwanda","authors":"Dusabirane Pierre","doi":"10.53819/81018102t4156","DOIUrl":"https://doi.org/10.53819/81018102t4156","url":null,"abstract":"The purpose of this research is to examine is to investigate the determinants of project management effectiveness and performance on public projects in Rwanda a case of Three Stones International Rwanda. More specifically, the study is motivated by the following particular objectives: To determine the effects of project finance on performance of Three Stones International Rwanda's projects, To explore the effects of beneficiary involvement on the performance of Three Stones International Rwanda, the effects of monitoring and evaluation on the performance of Three Stones International Rwanda and to assess the influence of Project leadership on project performance of Three Stones International Rwanda. This research will help the Rwandan government, to better comprehend the significance of efficient project management on the success of public projects in Rwanda, in particular planners and decision-makers involved in capacity building. Because it inspires them to conduct research on related subjects, this study will be beneficial to other researchers. The researcher employed a descriptive research design, with a sample size of 213 and a target population of 459, in order to achieve on research objectives, the primary data was obtained using questionnaires and an examination of the supporting documentation was utilized to gather the secondary data. The acquired data was analyzed using regression, correlation, and mean calculations in SPSS version 21. Tables was utilized to illustrate the findings, and a pilot study was conducted to evaluate the validity and dependability of the instruments used to gather the data. After collecting and analyzing data the following responses were obtained. The Pearson coefficient correlation showed that there is strongly positive correlation of 852 (r=0.852) between beneficiary involvement and public project performance. The study concluded that project managers emphasize on the availability of project finance, beneficiary’ involvement, monitoring and evaluation and project leadership to boost public project performance. The study recommended that the project managers should focus highly on the effective utilization of allocated resources to avoid any misuse of financial resources. Keywords: Project Management, project management effectiveness, Performance of public project","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"70 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132587064","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信