项目风险管理实践与建设项目绩效:以卢旺达基加利地平线建设为例

Janvier Hakizimana
{"title":"项目风险管理实践与建设项目绩效:以卢旺达基加利地平线建设为例","authors":"Janvier Hakizimana","doi":"10.53819/81018102t2153","DOIUrl":null,"url":null,"abstract":"The general objective was to examine the effect of project risk management on performance of construction of rehabilitation house construction in Kigali, Rwanda. The specific objectives were; to determine effect of project risk assessment, project risk base decision and project contingency decision on performance of commercial rehabilitation in Kigali. Working on that topic would provide a better way to large-scale construction projects. Other scholars who would be interested to work in the same field. The study used relevant theories such as risk management and risk assessment theories. This research used a descriptive study variables, indicators and measurement. A correlation study design was used to establish the association between variables and regression effect size for each specific objectives. The study targeted 180 staffs of Horizon Construction. A sample of 125 respondents determined using Yamane formula participated in the study process. The sample size was chosen using simple random and purposive sampling techniques. The study collected data using questionnaire and interview guide. The researcher study data using a computer based software known statistical product and service solutions to 26.0 to generate descriptive and inferential statistics. Qualitative data was analyzed using content analysis through themes and subthemes. Findings show","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project Risk Management Practices and Performance of Construction Projects: A Case of Horizon Construction in Kigali, Rwanda\",\"authors\":\"Janvier Hakizimana\",\"doi\":\"10.53819/81018102t2153\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The general objective was to examine the effect of project risk management on performance of construction of rehabilitation house construction in Kigali, Rwanda. The specific objectives were; to determine effect of project risk assessment, project risk base decision and project contingency decision on performance of commercial rehabilitation in Kigali. Working on that topic would provide a better way to large-scale construction projects. Other scholars who would be interested to work in the same field. The study used relevant theories such as risk management and risk assessment theories. This research used a descriptive study variables, indicators and measurement. A correlation study design was used to establish the association between variables and regression effect size for each specific objectives. The study targeted 180 staffs of Horizon Construction. A sample of 125 respondents determined using Yamane formula participated in the study process. The sample size was chosen using simple random and purposive sampling techniques. The study collected data using questionnaire and interview guide. The researcher study data using a computer based software known statistical product and service solutions to 26.0 to generate descriptive and inferential statistics. Qualitative data was analyzed using content analysis through themes and subthemes. Findings show\",\"PeriodicalId\":176307,\"journal\":{\"name\":\"Journal of Entrepreneurship & Project Management\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Entrepreneurship & Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53819/81018102t2153\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Entrepreneurship & Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53819/81018102t2153","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

总目标是审查项目风险管理对卢旺达基加利重建房屋建造工作业绩的影响。具体目标是;确定项目风险评估、项目风险基础决策和项目应急决策对基加利商业重建绩效的影响。研究这一专题将为大型建筑项目提供更好的途径。其他有兴趣在同一领域工作的学者。本研究运用了风险管理、风险评估等相关理论。本研究采用描述性研究变量、指标和测量方法。采用相关研究设计来建立每个特定目标的变量和回归效应大小之间的关联。这项研究的对象是地平线建筑公司的180名员工。使用Yamane公式确定的125名受访者样本参与了研究过程。样本量的选择采用简单的随机和有目的的抽样技术。本研究采用问卷调查法和访谈法收集数据。研究人员利用基于计算机的已知统计软件对产品和服务的26.0解决方案进行数据研究,生成描述性和推断性统计。定性数据通过主题和副主题进行内容分析。研究结果显示
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project Risk Management Practices and Performance of Construction Projects: A Case of Horizon Construction in Kigali, Rwanda
The general objective was to examine the effect of project risk management on performance of construction of rehabilitation house construction in Kigali, Rwanda. The specific objectives were; to determine effect of project risk assessment, project risk base decision and project contingency decision on performance of commercial rehabilitation in Kigali. Working on that topic would provide a better way to large-scale construction projects. Other scholars who would be interested to work in the same field. The study used relevant theories such as risk management and risk assessment theories. This research used a descriptive study variables, indicators and measurement. A correlation study design was used to establish the association between variables and regression effect size for each specific objectives. The study targeted 180 staffs of Horizon Construction. A sample of 125 respondents determined using Yamane formula participated in the study process. The sample size was chosen using simple random and purposive sampling techniques. The study collected data using questionnaire and interview guide. The researcher study data using a computer based software known statistical product and service solutions to 26.0 to generate descriptive and inferential statistics. Qualitative data was analyzed using content analysis through themes and subthemes. Findings show
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信