卢旺达公共项目项目管理有效性和绩效的决定因素:以三块石头国际卢旺达为例

Dusabirane Pierre
{"title":"卢旺达公共项目项目管理有效性和绩效的决定因素:以三块石头国际卢旺达为例","authors":"Dusabirane Pierre","doi":"10.53819/81018102t4156","DOIUrl":null,"url":null,"abstract":"The purpose of this research is to examine is to investigate the determinants of project management effectiveness and performance on public projects in Rwanda a case of Three Stones International Rwanda. More specifically, the study is motivated by the following particular objectives: To determine the effects of project finance on performance of Three Stones International Rwanda's projects, To explore the effects of beneficiary involvement on the performance of Three Stones International Rwanda, the effects of monitoring and evaluation on the performance of Three Stones International Rwanda and to assess the influence of Project leadership on project performance of Three Stones International Rwanda. This research will help the Rwandan government, to better comprehend the significance of efficient project management on the success of public projects in Rwanda, in particular planners and decision-makers involved in capacity building. Because it inspires them to conduct research on related subjects, this study will be beneficial to other researchers. The researcher employed a descriptive research design, with a sample size of 213 and a target population of 459, in order to achieve on research objectives, the primary data was obtained using questionnaires and an examination of the supporting documentation was utilized to gather the secondary data. The acquired data was analyzed using regression, correlation, and mean calculations in SPSS version 21. Tables was utilized to illustrate the findings, and a pilot study was conducted to evaluate the validity and dependability of the instruments used to gather the data. After collecting and analyzing data the following responses were obtained. The Pearson coefficient correlation showed that there is strongly positive correlation of 852 (r=0.852) between beneficiary involvement and public project performance. The study concluded that project managers emphasize on the availability of project finance, beneficiary’ involvement, monitoring and evaluation and project leadership to boost public project performance. The study recommended that the project managers should focus highly on the effective utilization of allocated resources to avoid any misuse of financial resources. Keywords: Project Management, project management effectiveness, Performance of public project","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Determinants of Project Management Effectiveness and Performance on Public Projects in Rwanda: A Case of Three Stones International Rwanda\",\"authors\":\"Dusabirane Pierre\",\"doi\":\"10.53819/81018102t4156\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this research is to examine is to investigate the determinants of project management effectiveness and performance on public projects in Rwanda a case of Three Stones International Rwanda. More specifically, the study is motivated by the following particular objectives: To determine the effects of project finance on performance of Three Stones International Rwanda's projects, To explore the effects of beneficiary involvement on the performance of Three Stones International Rwanda, the effects of monitoring and evaluation on the performance of Three Stones International Rwanda and to assess the influence of Project leadership on project performance of Three Stones International Rwanda. This research will help the Rwandan government, to better comprehend the significance of efficient project management on the success of public projects in Rwanda, in particular planners and decision-makers involved in capacity building. Because it inspires them to conduct research on related subjects, this study will be beneficial to other researchers. The researcher employed a descriptive research design, with a sample size of 213 and a target population of 459, in order to achieve on research objectives, the primary data was obtained using questionnaires and an examination of the supporting documentation was utilized to gather the secondary data. The acquired data was analyzed using regression, correlation, and mean calculations in SPSS version 21. Tables was utilized to illustrate the findings, and a pilot study was conducted to evaluate the validity and dependability of the instruments used to gather the data. After collecting and analyzing data the following responses were obtained. The Pearson coefficient correlation showed that there is strongly positive correlation of 852 (r=0.852) between beneficiary involvement and public project performance. The study concluded that project managers emphasize on the availability of project finance, beneficiary’ involvement, monitoring and evaluation and project leadership to boost public project performance. The study recommended that the project managers should focus highly on the effective utilization of allocated resources to avoid any misuse of financial resources. Keywords: Project Management, project management effectiveness, Performance of public project\",\"PeriodicalId\":176307,\"journal\":{\"name\":\"Journal of Entrepreneurship & Project Management\",\"volume\":\"70 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Entrepreneurship & Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53819/81018102t4156\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Entrepreneurship & Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53819/81018102t4156","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是研究是调查项目管理的有效性和绩效的决定因素在卢旺达的公共项目,三块石头国际卢旺达的一个案例。更具体地说,这项研究的动机是下列具体目标:确定项目融资对三石国际卢旺达项目绩效的影响,探讨受益人参与对三石国际卢旺达项目绩效的影响,监测和评估对三石国际卢旺达项目绩效的影响,评估项目领导对三石国际卢旺达项目绩效的影响。这项研究将有助于卢旺达政府更好地理解有效的项目管理对卢旺达公共项目成功的重要性,特别是参与能力建设的规划者和决策者。因为它激励他们进行相关课题的研究,这项研究将对其他研究人员有益。研究人员采用描述性研究设计,样本量为213,目标人群为459,为了实现研究目标,主要数据是通过问卷调查获得的,并通过对支持文件的审查来收集次要数据。采集的数据在SPSS version 21中使用回归、相关和均值计算进行分析。使用表格来说明调查结果,并进行了一项试点研究,以评估用于收集数据的工具的有效性和可靠性。在收集和分析数据后,得到了以下回应。Pearson相关系数显示,受益人参与与公共项目绩效之间存在强正相关(r=0.852),为852。该研究的结论是,项目经理强调项目融资的可获得性、受益人的参与、监测和评价以及项目领导,以提高公共项目的绩效。该研究建议,项目经理应高度重视有效利用分配的资源,以避免滥用财政资源。关键词:项目管理,项目管理有效性,公共项目绩效
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Determinants of Project Management Effectiveness and Performance on Public Projects in Rwanda: A Case of Three Stones International Rwanda
The purpose of this research is to examine is to investigate the determinants of project management effectiveness and performance on public projects in Rwanda a case of Three Stones International Rwanda. More specifically, the study is motivated by the following particular objectives: To determine the effects of project finance on performance of Three Stones International Rwanda's projects, To explore the effects of beneficiary involvement on the performance of Three Stones International Rwanda, the effects of monitoring and evaluation on the performance of Three Stones International Rwanda and to assess the influence of Project leadership on project performance of Three Stones International Rwanda. This research will help the Rwandan government, to better comprehend the significance of efficient project management on the success of public projects in Rwanda, in particular planners and decision-makers involved in capacity building. Because it inspires them to conduct research on related subjects, this study will be beneficial to other researchers. The researcher employed a descriptive research design, with a sample size of 213 and a target population of 459, in order to achieve on research objectives, the primary data was obtained using questionnaires and an examination of the supporting documentation was utilized to gather the secondary data. The acquired data was analyzed using regression, correlation, and mean calculations in SPSS version 21. Tables was utilized to illustrate the findings, and a pilot study was conducted to evaluate the validity and dependability of the instruments used to gather the data. After collecting and analyzing data the following responses were obtained. The Pearson coefficient correlation showed that there is strongly positive correlation of 852 (r=0.852) between beneficiary involvement and public project performance. The study concluded that project managers emphasize on the availability of project finance, beneficiary’ involvement, monitoring and evaluation and project leadership to boost public project performance. The study recommended that the project managers should focus highly on the effective utilization of allocated resources to avoid any misuse of financial resources. Keywords: Project Management, project management effectiveness, Performance of public project
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信