IPTEK Journal of Proceedings Series最新文献

筛选
英文 中文
Improvement of Overhaul Maintenance Management System Based on Failure Method Operation Failure Analysis Using The FMEA Method 基于失效方法的大修维修管理系统改进
IPTEK Journal of Proceedings Series Pub Date : 2021-10-21 DOI: 10.12962/j23546026.y2020i3.11224
Ika Syarah Firmansyah, S. Suparno
{"title":"Improvement of Overhaul Maintenance Management System Based on Failure Method Operation Failure Analysis Using The FMEA Method","authors":"Ika Syarah Firmansyah, S. Suparno","doi":"10.12962/j23546026.y2020i3.11224","DOIUrl":"https://doi.org/10.12962/j23546026.y2020i3.11224","url":null,"abstract":"― The Failure Mode and Effect Analysis (FMEA) methodology is a recent systematic approach to analyze and assess identified waste (potential failure mode) on products / services or processes and prevent the frequency of occurrence. This study aims to develop FMEA and is used to analyze the root causes of failure and pareto diagrams to show the most critical identified failures for immediate corrective action. While the Faultr Tree Analysis (FTA) method analyzes system failures from a combination of several systems, levels below and component failures. The results achieved are failure priorities based on the largest RPN value and then action recommendations are taken to address them. The results of this study indicate that in the process of maintaining the plant overhaul there are several wastes. For each waste identified (failure mode) it has been analyzed using Pareto diagrams. To facilitate the assessment of identified waste carried out by respondents from management and experts in their fields through questionnaires. The results will produce a risk priority number (RPN), where the HP TBV HRSG fails to operate at 210, the HP BFP pump is off at 196, the BCP pump has a high Vibration of 192. While the root cause of the potential failure mode has been identified by fault tree analysis (FTA). While some alternative improvements such as: There is a need for training for operators to know and recognize the system, involvement of operators in carrying out repairs / maintenance is important, increasing the availability of spare parts in the field is recommended for the company.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"69 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72992964","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Formulation Stategies for Vocational High School in Surabaya ( Case Study: SMKS “X”) 泗水市职业高中的办学策略(案例研究:SMKS“X”)
IPTEK Journal of Proceedings Series Pub Date : 2021-10-21 DOI: 10.12962/j23546026.y2020i3.11233
S. Limbong, I. P. Artama Wiguna
{"title":"Formulation Stategies for Vocational High School in Surabaya ( Case Study: SMKS “X”)","authors":"S. Limbong, I. P. Artama Wiguna","doi":"10.12962/j23546026.y2020i3.11233","DOIUrl":"https://doi.org/10.12962/j23546026.y2020i3.11233","url":null,"abstract":"","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"5 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84279044","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
General Bank's Profitability Analysis on The Impact of Going Public Process 上市过程对普通银行盈利能力的影响分析
IPTEK Journal of Proceedings Series Pub Date : 2021-10-21 DOI: 10.12962/j23546026.y2020i3.11223
Karina Buditianingsih, I. Gunarta
{"title":"General Bank's Profitability Analysis on The Impact of Going Public Process","authors":"Karina Buditianingsih, I. Gunarta","doi":"10.12962/j23546026.y2020i3.11223","DOIUrl":"https://doi.org/10.12962/j23546026.y2020i3.11223","url":null,"abstract":"","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"35 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73847247","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Quality Improvement of Overhaul Maintenance Service using Servqual and Quality Function Deployment Method Case Study in PT. Pembangkitan Jawa Bali (PJB) UPHT Gresik 基于Servqual和质量功能部署方法的大修维修服务质量改进——以PJB公司为例[j]
IPTEK Journal of Proceedings Series Pub Date : 2021-10-21 DOI: 10.12962/J23546026.Y2020I3.11227
Adi Suryadarma, M. Singgih
{"title":"Quality Improvement of Overhaul Maintenance Service using Servqual and Quality Function Deployment Method Case Study in PT. Pembangkitan Jawa Bali (PJB) UPHT Gresik","authors":"Adi Suryadarma, M. Singgih","doi":"10.12962/J23546026.Y2020I3.11227","DOIUrl":"https://doi.org/10.12962/J23546026.Y2020I3.11227","url":null,"abstract":"Electricity is the right of every person guaranteed in the 1945 Constitution, it must be realized in the form of providing electricity supply for the community. Electricity generators in Gresik are one of the power suppliers for industries and communities through the distribution managed by one of the electricity distributor in Indonesia. As time goes by, the plant needs to do a planned maintenance called overhaul. This research aims to improve the quality of overhaul maintenance service to one of the generators that exist in Gresik. The other goal is to know what service factors that affect the level of customer satisfaction in accordance with customer expectations based on service priority variables. Measurement of service quality of overhaul maintenance is done by combining ServQual method and Quality Function Deployment (QFD) method.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"22 2 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"90346222","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
3 Kg LPG Business Strategy Development Using BMC and BOS 利用BMC和BOS开发3kg LPG业务战略
IPTEK Journal of Proceedings Series Pub Date : 2021-10-21 DOI: 10.12962/J23546026.Y2020I3.11222
Luqman Hanifianto, B. Noer
{"title":"3 Kg LPG Business Strategy Development Using BMC and BOS","authors":"Luqman Hanifianto, B. Noer","doi":"10.12962/J23546026.Y2020I3.11222","DOIUrl":"https://doi.org/10.12962/J23546026.Y2020I3.11222","url":null,"abstract":"Arief LPG is a new distributor that distributes 3 kg LPG gas in the Menanggal area, Surabaya. As a new distributor Arief LPG will face existing competitors, be able compete Arief LPG must have a business model that can be used as a reference for the business being undertaken. Tools that can be used to analyze business models are using Business Model Canvas (BMC) and Blue Ocean Strategy. Using Business Model Canvas and Blue Ocean Strategy can be used to create a new business model design. This study aims to map, evaluate and improve Arief LPG's business model. The method used in this study is by interviewing Arief LPG customers. Results obtained from the Business Model Canvas are adding types of LPG that are sold LPG 12 Kg in addition promotions that can be done using online media such as creating a personal Blog or Web, and other social media. While results of the Blue Ocean Strategy factors that need be reduced accuracy of delivery, factor that needs improved is increase the amount of 3 kg LPG distribution, and create factors that have never been sold, such Bright Gas, 12 kg LPG and making a training on gas handling.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"49 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"78775904","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
A Combined AHP-GP for Maintenance Project Selection in Coal Power Plant 基于AHP-GP的火电厂维修方案选择
IPTEK Journal of Proceedings Series Pub Date : 2021-10-21 DOI: 10.12962/J23546026.Y2020I3.11232
H. Setiyawan, U. Ciptomulyono
{"title":"A Combined AHP-GP for Maintenance Project Selection in Coal Power Plant","authors":"H. Setiyawan, U. Ciptomulyono","doi":"10.12962/J23546026.Y2020I3.11232","DOIUrl":"https://doi.org/10.12962/J23546026.Y2020I3.11232","url":null,"abstract":"A proper maintenance project selection is a key to support performance of power plant. The issue of maintenance is allocation a limited budget to achieve the goals of various maintenance criteria and conflicting objectives. This paper presents an integrated AHP and goal programming. In the first step, since maintenance is measured in qualitative criteria, it is recommended to use AHP to weight and quantify criteria. Second step utilize GP which uses the criteria weights and alternative priorities calculated with AHP to optimize multiple objectives without exceeding available resource constraint. The results show that the approach can aid in selection optimal projects within available budget.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"74 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73412432","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling 基于关键链项目管理(CCPM)调度的旅游景观设计项目规划与控制
IPTEK Journal of Proceedings Series Pub Date : 2021-10-19 DOI: 10.12962/j23546026.y2020i3.11205
Alivia Rosy Walidonna, I. Vanany
{"title":"Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling","authors":"Alivia Rosy Walidonna, I. Vanany","doi":"10.12962/j23546026.y2020i3.11205","DOIUrl":"https://doi.org/10.12962/j23546026.y2020i3.11205","url":null,"abstract":"― Project Management must meet the performance criteria of timeliness and budget control agreed between the project owner, contractor and supervisor. However, the level of uncertainty in the project implementation process is very high and causes delays and over budgeting. The Village Nongkojajar is a Proposed Integrated Agropark Project as a result of the revitalization of the non-productive land of the Horticultural Seed Farm owned by the Government of East Java Province. The Landscape Architecture Project has a Creative Value Chain which is divided into Creation - Implementation - Management. Therefore scheduling and controlling the project becomes important in order to to estimate working time and the project remains in accordance with the predetermined project timeline and whenever corrective action is needed. The relevance of Project Management in this research is that with high project problems, require a good planning process. The Project can be completed quickly than the specified time and more cost effective. Critical Chain Project Management (CCPM) is one method for completing and preparing projects that focus on the resource requirements for implementing projects by adding project buffers, feeding buffers and resource buffers. By analyzing using CCPM, researchers can look for optimization and control in implementing project scheduling.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"19 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"90752790","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Effect of Financial Incentives, Organizational Commitment, and Job Satisfaction on Employee Performance 财务激励、组织承诺和工作满意度对员工绩效的影响
IPTEK Journal of Proceedings Series Pub Date : 2021-10-19 DOI: 10.12962/j23546026.y2020i3.11195
Doddy Firman Rahmadi, S. Partiwi
{"title":"The Effect of Financial Incentives, Organizational Commitment, and Job Satisfaction on Employee Performance","authors":"Doddy Firman Rahmadi, S. Partiwi","doi":"10.12962/j23546026.y2020i3.11195","DOIUrl":"https://doi.org/10.12962/j23546026.y2020i3.11195","url":null,"abstract":"― Organization or business performance always have close relation with its own member or employee performance and productivity. Most of them only focus on raising the wealthy of its member by giving financial incentives hoping it will reflect with significant improvement of member performance. But in some case giving the incentives not always bring significant increase to member productivity. This study was made with the aim to determine the effect of financial incentives, organizational commitment, and job satisfaction on employee performance. This study uses quantitative study. Data collection procedures used in this study are structured data collection. The population used is 10 persons of installation and maintenance employees of PT. KONE Indo Elevator throughout Indonesia that has implement some financial incentive to boots up their employee performance. The result of the study was financial incentives and job satisfaction have positif and significant effect to employee performance while organizational commitment not having signifficant effect to employee performance.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"33 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84323973","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Distribution Network Configuration of Drilling Material to Reduce Transportation Cost 降低运输成本的钻孔物料配送网络配置
IPTEK Journal of Proceedings Series Pub Date : 2021-10-19 DOI: 10.12962/j23546026.y2020i3.11198
Maykel Yonathan, I. N. Pujawan
{"title":"Distribution Network Configuration of Drilling Material to Reduce Transportation Cost","authors":"Maykel Yonathan, I. N. Pujawan","doi":"10.12962/j23546026.y2020i3.11198","DOIUrl":"https://doi.org/10.12962/j23546026.y2020i3.11198","url":null,"abstract":"","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"21 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82302470","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Reliability Analysis and Economic Life Calculation for Asset Management Optimization (Case Study in Steam Power Generation Unit at XYZCompany) 资产管理优化的可靠性分析与经济寿命计算(以xyz公司蒸汽发电机组为例)
IPTEK Journal of Proceedings Series Pub Date : 2021-10-19 DOI: 10.12962/j23546026.y2020i3.11200
Gede Bayu Anugrah, M. Suef
{"title":"Reliability Analysis and Economic Life Calculation for Asset Management Optimization (Case Study in Steam Power Generation Unit at XYZCompany)","authors":"Gede Bayu Anugrah, M. Suef","doi":"10.12962/j23546026.y2020i3.11200","DOIUrl":"https://doi.org/10.12962/j23546026.y2020i3.11200","url":null,"abstract":"","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"161 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2021-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"77701219","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信