Day 3 Wed, August 07, 2019最新文献

筛选
英文 中文
Efficient Placement of Relief Well Using Combination of Tools 使用组合工具高效安置减压井
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198760-MS
A. Pedro, D. Feltracco, A. Pasquale, E. Gravante
{"title":"Efficient Placement of Relief Well Using Combination of Tools","authors":"A. Pedro, D. Feltracco, A. Pasquale, E. Gravante","doi":"10.2118/198760-MS","DOIUrl":"https://doi.org/10.2118/198760-MS","url":null,"abstract":"\u0000 A Well with plug set in both tubing was sabotaged and even after initially capping the well, it was observed that attempting to kill the Target Well via surface pumping was abortive.\u0000 Therefore, in order to achieve well control, drilling a relief well became imperative and required some critical decision to be taken. This include location selection, type fluid to be used in drilling, the casing setting depth, downhole measuring tools for use, as well as contractors needed in achieving success in a suitation of incomplete well survey data.\u0000 This paper presents how this keys needs were met in drilling the Relief Well planned for 97days trouble free and performed in 107days from spud to hitting Target Well. The success was on single attempt in spite of it having an incomplete survey record acquired 49 years earlier.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"78 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"83759393","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Reservoir Navigation in Njaba Field – Challenges, Procedure and Results Njaba油田油藏导航——挑战、程序和结果
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198786-MS
C. Ndokwu, K. Amadi, Oluwaseun Toyobo, Victor Okowi, I. Ajisafe, A. Inenemo
{"title":"Reservoir Navigation in Njaba Field – Challenges, Procedure and Results","authors":"C. Ndokwu, K. Amadi, Oluwaseun Toyobo, Victor Okowi, I. Ajisafe, A. Inenemo","doi":"10.2118/198786-MS","DOIUrl":"https://doi.org/10.2118/198786-MS","url":null,"abstract":"\u0000 Due to the low oil price, Exploration and Production (E&P) companies are driven to reduce the cost per barrel of oil equivalent (BOE). The application of reservoir navigation services, in the placement of high angle and horizontal (HAHZ) wells in the sweet spot of reservoirs, has aided in meeting this economic need of the E&P, while also improving hydrocarbon recovery.\u0000 Reservoir navigation services (RNS) can be regarded as another tool for improving the odds of success while drilling of HAHZ wells. This service involves the integration of real-time data (deep-reading azimuthal resistivity, gamma-ray, density image, resistivity image logs, near bit inclination and a fit for purpose rotary steerable system) to accurately position the well-bore relative to specific subsurface targets, while remaining within the constraints of the drilling and completion program. RNS also require a software package capable of pre-well modeling, displaying the acquired real-time data and interactively adapting the model to the real-time data.\u0000 Geosteering in Njaba field involved a comprehensive pre-well planning, discussions, documentation and management approved decision-tree. Using three wells for this study, this paper describes the challenges, procedures and results of geosteering in Njaba Field located on-shore Niger-Delta. From different entry points, wells NJX1, NJX2, and NJX3 were planned to drain the same reservoir and optimize hydrocarbon recovery within the reservoir. Some of the challenges encountered includes geosteering the wellbore above a pre-determined production TVD hardline while simultaneously avoiding drilling into an overlying undulating shale cap rock, vertical seismic uncertainty and undulating formation boundaries.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"130 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79239227","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Considerations for Mitigating Early Water Breakthrough in Horizontal Wells in Heavy Oil Reservoirs in the Niger Delta - Ogini Field Case Study 尼日尔三角洲稠油油藏水平井早期减水对策——Ogini油田实例研究
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198828-MS
O. Erivwo, J. Ochai, Victor Agbaroji, Oluwatobi Oke
{"title":"Considerations for Mitigating Early Water Breakthrough in Horizontal Wells in Heavy Oil Reservoirs in the Niger Delta - Ogini Field Case Study","authors":"O. Erivwo, J. Ochai, Victor Agbaroji, Oluwatobi Oke","doi":"10.2118/198828-MS","DOIUrl":"https://doi.org/10.2118/198828-MS","url":null,"abstract":"\u0000 Horizontal wells are susceptible to early water breakthrough (EWBT) due to reservoir heterogeneity and \"the heel-toe effect\", caused by frictional pressure losses along the well that lead to a non-uniform production profile. Also, with heavy oil reservoirs, early water breakthrough can occur because of viscous fingering due to an unfavorable mobility ratio caused by a difference in the viscosity of heavy oil and water. This ratio leads to a high inflow of water into the wellbore.\u0000 EWBT is undesirable as it brings with it negative implications; from low oil productivity to corrosion in the wellbore and water disposal challenges. There are different industry solutions to managing early water breakthrough including reservoir based improved oil recovery (IOR) or enhanced oil recovery (EOR) methods such as thermal EOR (steam flooding, cyclic steam injection), chemical EOR (polymer or alkaline flooding) or miscible EOR (with methane or ethane to reduce capillary resistance). These methods are however complex and broad field-based applications with varying experiences in the outcomes of the field implementation. There are also mechanical well specific solutions for mitigating EWBT and in this paper, we present the considerations and plans for the application of Autonomous Inflow Control Devices (AICDs) for the mitigation of EWBT in the Niger Delta. AICDs are relatively new and are known for autonomous selective choking of fluid phases. They restrict the flow of less viscous phases like water while allowing more viscous phases like heavy oil to pass through, with minimum pressure drop.\u0000 The paper examines the different causes of EWBT in Ogini field and the different solution options available. It presents the cost/benefit analysis and modeling considerations resulting in the selection of AICDs for EWBT mitigation. The paper concludes with the technology implementation plan developed for its successful deployment in the upcoming drilling campaign.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"17 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82572449","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Complex Reservoir Re-Development in a Deep Offshore Maturing Field: Akpo Field Case Study 深海成熟油田复杂油藏再开发:Akpo油田案例研究
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198747-MS
A. Adeyemi, G. Uwerikowe, T. Tyagi, Jed Oukmal, M. Usman
{"title":"Complex Reservoir Re-Development in a Deep Offshore Maturing Field: Akpo Field Case Study","authors":"A. Adeyemi, G. Uwerikowe, T. Tyagi, Jed Oukmal, M. Usman","doi":"10.2118/198747-MS","DOIUrl":"https://doi.org/10.2118/198747-MS","url":null,"abstract":"\u0000 With increasing complexity of reservoir developments, there is often a marked deviation from the field development plan (FDP), thus, requiring complementary developments with infill wells. This paper addresses this necessity whilst using the Akpo field reservoir B as a case study. Our case is an oil-bearing, highly faulted turbidite channel-levees system. The reservoir comprises three different units (Upper, Middle and Lower) with gross interval of about 140 m and good porosity and permeability values. The hydrocarbon-water contact (HWC) varies across fault blocks with little certainty about reservoir connectivity. It was assumed in the initial FDP that two producers located around the top structure would be supported by two injector wells located on the flanks near the HWC. In 2011, the first producer (Akpo-XP) was completed in the three units and equipped with an inflow control valve (ICV). From fluid samples collected and the selective acquisition of dynamic data from these intervals, results showed that the Upper unit was disconnected from the Middle and Lower units. Consequently, Akpo-XP was forced to produce only from the Middle and Lower units in order to be supported by a northern injector (Akpo-YW) in the same interval. To complete the initial development, another pair of wells (producer-injector) was drilled and completed in the upper unit. All wells were equipped with down-hole pressure gauges for connectivity assessment.\u0000 In 2015, a seismic monitor was acquired, processed and interpreted whilst integrating production, injection and pressure data. The 4D seismic data confirmed specific fluid movements in the reservoir and a reservoir re-development could be sanctioned with two infill wells (one producer and one injector) with estimated increase in up to 16 Mboe of reserves and incremental production of 13 kbopd.\u0000 A post-mortem analysis of these two infill wells showed a combined incremental production slightly above expectations.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"8 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80450630","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Evaluation of Interfacial Friction Models in Stratified Flow: Gas-Liquid Two-Phase Flow 分层流动中界面摩擦模型的评价:气液两相流
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198840-MS
Mobolaji Abegunde, T. Briggs, F. Abam, T. Awolola
{"title":"Evaluation of Interfacial Friction Models in Stratified Flow: Gas-Liquid Two-Phase Flow","authors":"Mobolaji Abegunde, T. Briggs, F. Abam, T. Awolola","doi":"10.2118/198840-MS","DOIUrl":"https://doi.org/10.2118/198840-MS","url":null,"abstract":"\u0000 This research entails evaluation of existing interfacial friction factor, gas-wall shear stress, and liquid wall shear stress correlations for the prediction of liquid holdup in pipelines. In addition, a statistical analysis was conducted on the predicted and measured flow parameters. Stratified horizontal two-phase flow equation was used in deriving an equation that solves for liquid holdup that is dependent on the interfacial shear stress. The model was implemented in a MATLAB integrated development environment to observe the effect of interfacial friction factors obtained from existing correlations. The results obtained from the comparative study of selected friction factors indicate that some of the correlations show high deviation from experimentally determined values. The largest deviation was observed in the model proposed by Sinai which was because of the condition for which it was originally developed is not suited for horizontal stratified two-phase gas-liquid flow. It was also observed that the correlation of Petalas and Aziz gave the best result and least deviation from the measured values. The performance of each correlation was observed to vary with the assumed values of liquid height. All the correlations gave good predictions at 30% liquid height but performed poorly at 40% liquid height.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"3 5","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"91431094","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Lessons Learnt During Hydraulic Workover for ESP Replacement 更换ESP液压修井的经验教训
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198870-MS
Mohammed Othman, Choja Ojanomare
{"title":"Lessons Learnt During Hydraulic Workover for ESP Replacement","authors":"Mohammed Othman, Choja Ojanomare","doi":"10.2118/198870-MS","DOIUrl":"https://doi.org/10.2118/198870-MS","url":null,"abstract":"\u0000 The Well A14 was drilled in 2004 with dual completion and flowed for about 7 years. The well was shut-in due to high water cut and sand production. In December 2011, the well was re-completed single with 7’’ Cased Hole Gravel Pack and ESP + YTool. The well was later sidetracked and deviated to a tie-in point in order to encounter the target at optimal structural positions and provide additional drainage points on the target level to optimize hydrocarbon recovery from the field. The flowed for a period of 2 ½ years and stopped flowing as a result of electric fault on the ESP. Following this and the unfavorable price of crude oil at the time, there was need for an optimized means of intervention; several factors were considered and a HWO intervention using HWPU was selected. This paper addresses the contingent challenges faced and how these were overcome in the course of this 2nd W/O to recover the existing completion and run-in with a new design of ESP and accessories. During POOH the old completion after laying down the D-ESP packer on surface, the well kicked as a result of poor circulation during the killing operation. This resulted in a loss of control and fluid influx spilling to the environment. This challenge was addressed in compliance with the best standards. The W/O was resumed and the entire completion string and ESP assembly + Ytool retrieved. Subsequently during the final installation of the new ESP, the string parted at the threaded connection and the entire ESP completion assembly was lost in hole. This second incident was carefully reviewed by the team involved prior mobilization of fishing equipment and eventual recovery of the lost-in-hole in a single attempt. The entire completion containing the lost-in- hole, on about 2000m of 3 ½\" Tubing completion was recovered; the new assemblies were prepared and RIH successfully. The well was eventually completed and currently flowing (≈2000bopd). The responsible team reviewed the incidents, identified lapses and proposed future procedures in order to forestall reoccurrence.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"58 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86688810","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Egina Deep Water Development Completion Success: One Team Working Together Setting New Performance Standards Egina深水开发成功完成:一个团队共同努力制定新的绩效标准
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198869-MS
C. Okpalla, V. Chaloupka, Romain Djenani, Victor Okengwu, T. Akinniyi, B. Orluwosu, Kenneth Johnson
{"title":"Egina Deep Water Development Completion Success: One Team Working Together Setting New Performance Standards","authors":"C. Okpalla, V. Chaloupka, Romain Djenani, Victor Okengwu, T. Akinniyi, B. Orluwosu, Kenneth Johnson","doi":"10.2118/198869-MS","DOIUrl":"https://doi.org/10.2118/198869-MS","url":null,"abstract":"\u0000 A service company was challenged to deliver best-in-class upper and lower completions by leveraging deep water completion experiences throughout West Africa with the operator and service company's global best practices and lessons learned. An operator reduced lower completion times, standalone screens, and openhole gravel packs by 60% between the 1st and 24th well while reducing upper completion times by 40% for the same wells. Well construction durations, including drilling and completion, currently averages 24 days per well, with lower and upper completion operating efficiencies and run reliabilities exceeding 97%.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"34 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79325655","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Predictive Data Analytics for Effective Electric Submersible Pump Management 有效的电潜泵管理预测数据分析
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198759-MS
S. Sherif, Omisore Adenike, Eremiokhale Obehi, A. Funso, Blankson Eyituoyo
{"title":"Predictive Data Analytics for Effective Electric Submersible Pump Management","authors":"S. Sherif, Omisore Adenike, Eremiokhale Obehi, A. Funso, Blankson Eyituoyo","doi":"10.2118/198759-MS","DOIUrl":"https://doi.org/10.2118/198759-MS","url":null,"abstract":"\u0000 Electrical Submersible Pump (ESP) failures cause disruptions that lead to production deferement besides the cost of interventions/workovers post failure. The service life of an ESP is difficult to predict as it is affected by several factors which include reservoir characteristics, pump operating conditions and even the installation procedure. Measurement and monitoring of both dynamic and static ESP parameters play a critical role in extending the run-life. However, due to the complex nature of ESP failures, it can be difficult to identify anomalies by simply trending data.\u0000 Notable progress has been made in the past years with respect to the development of systems for monitoring but most operators are yet to fully leverage on a system that will allow for proactive ESP health condition monitoring.\u0000 In this paper, generalized machine-learning techniques and information acquired through real-time streaming was used to predict impending failures. This study applies Principal Component Analysis (PCA) on ESP intallations for a marginal field in the Niger Delta where production optimization and cost reduction are key to sustenance. Python was used for the data processing/statistical analysis and the algorithm development. The major objective of the PCA was to identify correlations in the dynamic ESP parameters: Intake Pressure, Intake Temperature, Discharge Pressure, Vibrations, Motor Temperature, Motor Current, Systems Current and Frequency recorded by the Variable Speed Drive (VSD) at regular intervals. Once the correlation/pattern was identified, the PCA approach found the directions of maximum variance in the high-dimensional data (in this study eight-dimensional) and projected it onto a smaller dimensional subspace while retaining most of the information. For each installation, a stable region for the operating frequency was identified and failed ESPs showed a clear drift from the stable region months before the failure occured, which was not apparent in the recorded parameters from the VSD.\u0000 The paper describes how to use Machine Learning (ML) algorithms to predict an ESP's runlife bringing the industry a step closer to proactive ESP monitoring as opposed to the current reactive methods.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"27 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84359466","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 10
Improving the Thermodynamic Properties of Export Gas Through Condensate Spiking 通过凝析油加注改善出口天然气热力学性质
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198805-MS
P. Oviawele, S. Onwukwe, N. Nwachukwu, I. Onyejekwe
{"title":"Improving the Thermodynamic Properties of Export Gas Through Condensate Spiking","authors":"P. Oviawele, S. Onwukwe, N. Nwachukwu, I. Onyejekwe","doi":"10.2118/198805-MS","DOIUrl":"https://doi.org/10.2118/198805-MS","url":null,"abstract":"\u0000 Disposal of condensate produced from stranded gas field have been a major concern to producing companies due to unavailability of nearby oil flow stations to receive the condensate, which have resulted to abandonment of such fields. This work seek to improve the thermodynamic properties (Heat Capacity, Heating Value, Specific Heat capacity, Heat of Vaporization and Enthalpy) of the export gas through condensate spiking. This was carried out by simulating a natural gas plant, consisting of condensate line and spiking mixer. The simulation was done using Aspen HYSYS, to include the point at which the condensate stream was spiked into the high-pressure dry natural gas stream. Phase envelope and hydrate formation curve for the streams (dry natural gas and the mixture after spiking) were obtained. Case study in HYSYS was used to carry out Sensitivity analysis, to determine the effect of temperature, pressure and flow rate of the condensate on the mixture (export gas). Economic analysis of the project was carried out. Results obtained from the thermodynamic analysis shows that the thermodynamic properties of the export gas after spiking improves, such that the heating value and enthalpy of the export gas increases. The phase envelops shows that hydrate will not form in the export gas streams. Through the sensitivity analyses, the effect of variation in the parameters of the condensate shows that the vapour fraction of the export gas increases as the temperature increase and decrease as the pressure increases. The maximum condensate flow rate was obtained to be 12,500 bbl/day, at a dry gas flow rate of 382.2 MMScfd, for a maximum vapour fraction of 0.953, with this operating parameters, flow assurance problem of hydrate formation, liquid holdup and high pressure drops along the pipeline with be eliminated. Hydrocarbon dew point of −13.41°C was obtained showing that liquid hydrocarbon will not condense out of the gas during transportation. Economic analysis shows that the NPV and IRR are $432.778 million and 33%, indicating that the project is viable for investment. Therefore, it is possible to spike condensate into treated export gas without causing flow assurance problems, and helps mitigate against risk associated with environmental pollution.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"15 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"90713953","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Reducing Drilling Operations Cost Through Rental Inventory Management - A Case Study 通过租赁库存管理降低钻井作业成本-一个案例研究
Day 3 Wed, August 07, 2019 Pub Date : 2019-08-05 DOI: 10.2118/198804-MS
O. Numbere, Prince Aigbedion, U. Okoli, Eleanor Okubor, Babatunde Olugbesan, Greg Ntiwunka
{"title":"Reducing Drilling Operations Cost Through Rental Inventory Management - A Case Study","authors":"O. Numbere, Prince Aigbedion, U. Okoli, Eleanor Okubor, Babatunde Olugbesan, Greg Ntiwunka","doi":"10.2118/198804-MS","DOIUrl":"https://doi.org/10.2118/198804-MS","url":null,"abstract":"\u0000 In a regime of volatile oil prices, it has become increasingly important to plan and deliver cost effective wells safely. Typically, this is achieved by optimizing technical details in planning and execution phase; however, an often-overlooked area of optimization is the management of rental tool inventory and the associated logistics. This area is usually subject to cost overruns due to insufficient tracking of equipment from mobilization through its use at the rigsite, resulting in late demobilization and incurring of additional cost by operators.\u0000 To completely eliminate these unwanted costs, a web/intranet based, equipment tracking solution which interfaced with the existing enterprise resource planning (ERP) platform (for contracting and procurement information) was designed and implemented by Addax Petroleum Nigeria to track and monitor the movement of rented equipment between service providers, logistics base and operations base. It ensured the effective tracking of rented equipment upon mobilization up till demobilization; this helped to prevent cost overruns for rented equipment during the drilling campaign. Daily reports and notifications were also provided to all key personnel on rented equipment status and it ensured a collaborative workspace for drilling team members to manage rented equipment movement internally.\u0000 The rentals inventory tracking application (RITA™) software was deployed during a six-month drilling campaign in 2017/2018. It provided comprehensive tracking for equipment mobilized to the rig, eliminating cost overruns on rental equipment throughout the project and cost savings of circa $1,000,000 during the six-month drilling campaign.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"87 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"78304210","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信